Braced frames are stiff but their braces buckle. Moment frames are ductile but flexible. The eccentrically braced frame (EBF) takes the best of both. Its braces are deliberately offset from each other, or from the column, so that a short segment of beam between them, the link, carries the lateral force by shear and bending. In a major earthquake, the link yields like a fuse, while the braces, columns and the beam outside the link stay essentially elastic. The result is a frame nearly as stiff as a concentrically braced frame and nearly as ductile as a special moment frame. AISC 341-22 Section F3 sets the rules, and this article explains them.
How the link works
Picture an inverted-V brace pair where the two braces meet the beam not at one point but a short distance apart. The piece of beam between them is the link. When the frame sways, the brace forces push and pull the link's ends vertically in opposite directions, so the link sees high shear along its length and bending at its ends. Because the link is designed to be the weakest element, it yields first, and its yielding dissipates the earthquake's energy.
EBF configurations include links at mid-span between chevron braces, links next to a column with a single diagonal brace, and links in two-storey arrangements. Links adjacent to columns need special connections and are generally avoided where an alternative exists.
ASCE 7 assigns the EBF a high response modification coefficient, R = 8, with Ω0 = 2 and Cd = 4, the same R as a special moment frame, with far less drift.
Short links and long links
How a link yields depends on its length, e, compared with the ratio of its plastic moment, Mp, to its plastic shear strength, Vp:
- Shear-yielding links: e ≤ 1.6 Mp/Vp. The web yields in shear along the full link length. Shear yielding is very stable and allows large rotations.
- Flexure-yielding links: e ≥ 2.6 Mp/Vp. Plastic hinges form in bending at the link ends, much like a short moment frame beam.
- Intermediate links: between the two, yielding combines shear and bending.
Short shear links are the most common choice because their behavior is the most reliable.
Link rotation limits
The key deformation measure in an EBF is the link rotation angle: the inelastic angle between the link and the beam outside it, at the design story drift. AISC 341 limits it:
- 0.08 radian for shear-yielding links, e ≤ 1.6 Mp/Vp.
- 0.02 radian for flexure-yielding links, e ≥ 2.6 Mp/Vp.
- Linear interpolation between those values for intermediate links.
The link rotation is far larger than the story drift, because the frame's deformation concentrates in the short link. That is why link length and frame geometry must be chosen together.
Link design rules
Section F3 gives links a detailed set of rules, all aimed at stable, repeatable yielding:
Section and material
Links must meet the width-to-thickness limits for their type, generally highly ductile, with some relief for the flanges of short shear links. The link is part of the beam, so the beam steel grade and expected strength apply.
Stiffeners
Full-depth web stiffeners are required on both sides of the web at the ends of every link, where the brace forces enter. Intermediate stiffeners are required along shear-yielding and intermediate links to delay web buckling, with spacing based on the web thickness and the beam depth and tied to the rotation the link must reach. For shallower links, intermediate stiffeners may be on one side of the web; deeper links need them on both sides. Stiffeners are welded to the web and flanges with welds designed for the forces the standard specifies.
What is not allowed
- No doubler plates on the link web. A reinforced web does not yield the way tests have shown links must.
- No web penetrations within the link.
- No splices or attachments in the link, which is a protected zone.
Lateral bracing
Both flanges of the link must be laterally braced at its ends, with braces designed for a set fraction of the expected flange strength, so the link cannot twist as it yields.
Built-up box links
AISC 341 permits built-up box-section links. A box is torsionally stiff and does not buckle laterally, which reduces bracing needs. Box links are useful in locations where the link cannot easily be braced, such as building perimeters or bridges. They follow their own width-to-thickness and stiffener rules.
Capacity design around the link
Everything outside the link is designed for the force the link can deliver when it is fully yielded and strain hardened: the link's expected shear strength, based on Ry, increased by a factor that accounts for strain hardening. That governs:
- The diagonal braces, designed for the axial force and moment they receive when the link reaches its adjusted strength.
- The beam outside the link, which carries large axial force and bending and must not yield first. Because the link and the beam outside it are the same member, this check often decides the beam size.
- The columns, designed for the forces from all links above yielding together, with allowance for the fact that not all may reach full strength at once.
- The brace-to-beam connection, designed for the brace's required strength, with the brace axis meeting the link end or inside the link, not beyond it.
A worked example: sizing a shear link
Take a chevron EBF with a 9 m (29 ft 6 in.) bay and a beam about 460 mm (18 in.) deep in ASTM A992 steel, with a web 9.5 mm (3/8 in.) thick and flanges 15 mm (0.6 in.) thick. The link's plastic shear strength is roughly 0.6 Fy times the web area between the flanges: 0.6 × 345 MPa × (460 − 30) mm × 9.5 mm ≈ 845 kN (190 kips). With a plastic modulus of about 1,660,000 mm³ (101 in.³), the plastic moment is about 573 kN·m (423 kip-ft).
The shear-yielding limit is then e ≤ 1.6 Mp/Vp ≈ 1.6 × 573/845 ≈ 1.08 m. The designer chooses a link 1.0 m (3 ft 3 in.) long, comfortably a shear link.
Next, the rotation. For a chevron EBF, the link rotation is roughly the plastic story drift angle multiplied by the bay width divided by the link length: here 9.0/1.0 = 9. If the plastic part of the design story drift is 0.008 radian, the link rotation is about 0.072 radian, inside the 0.08 limit. A shorter link would rotate more; a longer one would move toward intermediate behavior with a lower limit. This simple ratio is why EBF geometry and link length are chosen together.
Finally, the stiffeners: full-depth stiffeners on both sides at each link end, and intermediate stiffeners at a spacing set by the standard for 0.08 radian links, which for this web works out to roughly 190 mm (7-1/2 in.). The braces, the beam outside the link and the columns are then designed for the link's expected shear strength increased for strain hardening, which is well above 845 kN.
Link-to-column connections
When a link frames directly into a column, its connection sees both large shear and large moment. AISC 341 requires such connections to be prequalified or qualified by cyclic tests under Chapter K, demonstrating the link rotation the design needs. Because few tested details exist, many designers avoid links at columns and place them at mid-span instead.
Where EBFs are used
EBFs suit buildings that need stiffness and openings at the same time, such as mid-rise offices with corridors through the braced bays, hospitals and laboratories with tight drift limits, and seismic retrofits, where a new EBF can stiffen an existing building without the heavy forces of a concentric frame. Bridge piers, industrial structures and tall single-storey buildings use them too.
Fabrication notes
- Stiffener fit-up and welding is the main shop operation; stiffener positions are critical because they set the link's buckling resistance.
- Link length must be held to tolerance; a longer link changes the yielding mode.
- No attachments in the link: the protected zone rule is absolute, and it includes erection aids.
- Brace connections at the link ends are heavy, with gussets or direct welds designed for capacity forces.
- Welds joining the link flanges and web to a column, where used, are demand critical.
Checklist for reviewing an EBF package
- Is each link's length shown, and is its yielding type, shear, intermediate or flexural, stated?
- Does the link rotation at the design drift stay within the limit for its type?
- Are end stiffeners and intermediate stiffeners shown with spacing, sides and welds?
- Are links free of doubler plates, web penetrations, splices and attachments?
- Are both link flanges braced at the link ends, with brace strength shown?
- Are braces, beams outside the link and columns designed for the adjusted link strength?
- Are link-to-column connections, if any, prequalified or tested?
How World Steel designs and fabricates EBFs
World Steel designs and fabricates eccentrically braced frames for US projects in its own IAS AC472-accredited plant in Vietnam. Our engineers choose link length for the intended yielding mode, check link rotation against the AISC 341 limits, design the braces, beams outside the link and columns for the adjusted link strength, and detail full-depth and intermediate stiffeners to Section F3. Where bracing is hard to provide, we fabricate built-up box links from plate, using the same process as our box girders.
Links are shown as protected zones on the shop drawings, stiffener positions are checked dimensionally before welding, and welders are qualified to AWS D1.8. Every member is tracked in PEB Studio. The Engineer of Record reviews and approves the design, and the US contractor sets the frame on site.
The next article covers the braced frame whose braces never buckle: the buckling-restrained braced frame.
Quick answers
What is a link in an eccentrically braced frame?
The link is the short segment of beam between the end of a brace and the next brace or column. It is the designed yielding element: it yields in shear, bending or both while the braces, columns and the beam outside the link stay essentially elastic.
What link rotation does AISC 341 allow?
About 0.08 radian for short shear-yielding links and 0.02 radian for long flexure-yielding links, with linear interpolation for intermediate lengths.
Can doubler plates be used to strengthen a link web?
No. AISC 341 does not allow web doubler plates or web penetrations in links, because they disrupt the shear yielding the link depends on. Full-depth stiffeners are used instead.
Are built-up box links allowed?
Yes. AISC 341 permits built-up box-section links within its rules. They are stable against lateral-torsional buckling and can reduce the need for lateral bracing, which suits locations where bracing the link is difficult.
Keep building your steel plan
Go further on USPEB.com
On this topic
Across the US market
- Seismic steel structuresSDC D to F framing we fabricate for US jobs
- Seismic regionsWhere seismic design governs in the US
- California seismic designThe everyday AISC 341 market
- Accredited testing labsILAC ISO/IEC 17025 testing on every project
- Large projects, 2,500 t a monthCapacity for large US general contractors
- Contractor partnershipLong-term supply for US contractors


