AISC 341 in Puerto Rico and the US Virgin Islands: seismic and hurricane steel

Puerto Rico and the US Virgin Islands build to US codes in a region that has both strong earthquakes and major hurricanes. Here is how AISC 341 steel is designed, protected and delivered for projects from San Juan and Ponce to St. Thomas and St. Croix.

· updated November 30, 2026 · 7 min read · World Steel USA engineering team

Puerto Rico and the US Virgin Islands are US jurisdictions in the northeastern Caribbean, and they carry two hazards that most of the mainland meets one at a time. The 2017 hurricanes Irma and María devastated both territories; the 2020 southwest Puerto Rico earthquakes damaged schools, homes and the island's largest power plant. A steel building in Puerto Rico or the USVI has to be detailed for earthquakes under the AISC 341 provisions, designed for some of the highest wind speeds in ASCE 7 and protected against salt air, then delivered across the sea complete. This article explains how those demands fit together.

The seismic setting

Puerto Rico and the Virgin Islands sit on a small microplate squeezed between the North American and Caribbean plates. The Puerto Rico Trench lies to the north, the Muertos Trough to the south, and the Mona Passage and Anegada Passage faults on either side.

History shows the hazard clearly:

  • 1867 Virgin Islands earthquake, around magnitude 7.5, with a tsunami that struck St. Thomas and St. Croix.
  • 1918 San Fermín earthquake, magnitude 7.1, in the Mona Passage, with a tsunami along the west coast and heavy damage in Mayagüez and Aguadilla.
  • 2019–2020 southwest sequence, with a magnitude 6.4 main shock on 7 January 2020 and thousands of aftershocks, damaging buildings in Guánica, Guayanilla, Yauco, Ponce and the towns around them.

Under ASCE 7, much of Puerto Rico falls in Seismic Design Category D for ordinary buildings, with higher values for essential facilities and soft soils. The USVI are also commonly in SDC D. That means the R = 3 route described in the User Note of AISC 341 Section A1, which lets steel buildings in SDC B and C skip the provisions, is usually not available. A steel lateral system in Puerto Rico or the USVI should be assumed to be an AISC 341 system.

The 2020 earthquakes and what they taught

The southwest sequence was a lesson in ground and configuration. Many damaged buildings had soft first storeys, with open ground floors on columns and heavier floors above, or short columns created by partial-height walls. Schools built before modern seismic provisions suffered badly, and the government closed hundreds of school buildings for inspection.

Modern steel systems detailed to AISC 341 avoid those weaknesses by design. Special moment frames under Section E3 must meet the strong-column weak-beam rule, so hinges form in beams rather than columns. Braced frames under Sections F2 and F4 resist lateral loads with ductile braces, and ASCE 7's irregularity checks penalize soft and weak storeys. The lessons strengthened the case for well-detailed steel in schools, clinics and public buildings across the island.

Codes, permits and reviewers

Puerto Rico builds to the Puerto Rico Building Code, based on the IBC with local amendments, and ASCE 7 for loads. Permits run through the Office of Permit Management (OGPe), municipal offices with autonomous permit authority, and authorized professionals. Federal projects, including FEMA-funded reconstruction after 2017 and 2020, add federal requirements and often stricter documentation.

The USVI adopt the IBC with territorial amendments through the Department of Planning and Natural Resources.

Either way, the structural design documents must carry what AISC 341 Section A4 asks for: the designation of the seismic force-resisting system (SFRS), demand critical welds, protected zones, member and connection locations, and material specifications. Reviewers increasingly expect these on the drawings, especially for FEMA-funded schools and hospitals.

Hurricane wind on the same frame

ASCE 7 basic wind speeds for Puerto Rico and the USVI are among the highest in the code, with topographic effects on hills and ridges raising them further. Wind governs:

  • Roof and wall framing, purlins, girts and their connections, and uplift at the columns and anchor rods.
  • Cladding and its fasteners, designed for components and cladding pressures.
  • Often the strength of braces and frames in the direction where the building presents its long face to the wind.

Seismic design still governs the detailing of the SFRS. A brace sized by wind must still meet AISC 341 slenderness and width-to-thickness limits, its connections must still be designed for the expected brace strength, and its protected zone must still stay free of attachments. Engineers check both load cases on every member and take the governing result, but detailing follows AISC 341 whenever the system is an AISC 341 system.

Salt air and coatings

Most of Puerto Rico's industrial and commercial land is coastal: the San Juan metropolitan area, Bayamón, Carolina, Caguas in the interior, Ponce and Guayama on the south coast, Mayagüez and Aguadilla on the west. Exposed steel within a few kilometers of the sea is typically ISO 12944 C4 or C5. Typical systems are a zinc-rich epoxy primer with epoxy and polyurethane coats, or hot-dip galvanizing with a duplex paint system.

Two seismic details need attention when coatings are specified. Faying surfaces of slip-critical bolted joints in the SFRS must meet the slip class on the drawings, which rules out some paint systems unless they are qualified. And protected zones should be kept clear of later welded attachments that would damage both the steel's ductility and its coating.

Systems for Caribbean projects

Typical choices include:

  • Special concentrically braced frames (Section F2) for warehouses, distribution centers and manufacturing plants, including Puerto Rico's pharmaceutical and medical device facilities.
  • Special moment frames (Section E3) for hotels, offices, clinics and mixed-use buildings that need open frontage.
  • Buckling-restrained braced frames (Section F4) for schools, hospitals and essential facilities.
  • Pre-engineered metal buildings with tapered frames, designed as ordinary or intermediate moment frames within ASCE 7 limits, for warehouses and light industrial buildings.

Column bases deserve special care because hurricane uplift and seismic overturning both pull on anchor rods. Section D2.6 of AISC 341 sets the required strength of column bases in the SFRS, and the anchor rods and embedment follow ACI 318.

Delivery to the islands

Steel reaches Puerto Rico through San Juan, the busiest port in the territory and the usual entry point for project cargo bound for the metropolitan area and the north coast, and through Ponce on the south coast, which serves the southern industrial belt from Guayama to Yauco, with Mayagüez in the west. Choosing the port closest to the jobsite shortens trucking on the island's congested roads and reduces handling of coated steel. The USVI receive cargo at Charlotte Amalie on St. Thomas and at the St. Croix ports. Island projects reward a fabricator that packs in erection order, ships complete with bolts and embeds, protects coatings in transit, and plans shipments for the limited laydown space of most sites.

Proof from the plant and from other islands

A contractor in San Juan is right to ask whether an overseas plant has actually delivered seismic steel to islands with hurricanes. World Steel has. On Guam, a US territory with high seismic hazard and typhoon winds, we designed, fabricated and delivered the two-storey, seismic-designed FPI Barracks, about 120 tonnes, CIF in 60 days from the start of design. On Kosrae in Micronesia we supplied about 200 tonnes of hot-dip galvanized steel for a hospital. In the Caribbean itself, our projects in Guyana include warehouses, workshops, an office building and 18 footbridges, all shipped by sea and detailed for coastal exposure.

At larger scale, the plant has handled single projects of 5,000 tonnes for the Sunpro Steel mill, 2,500 tonnes for the CPV Food plant and 2,000 tonnes for the Long Son petrochemical complex, with heavy built-up members and phased deliveries. That matters for Puerto Rico's pharmaceutical, medical device and energy projects, where steel packages of a thousand tonnes or more are common and owners audit the supply chain.

The quality system behind those jobs is the one a Puerto Rico reviewer will look for: IAS AC472 accreditation since 2019, ISO 3834-2 welding quality, AWS D1.8-qualified welding procedures and welders, EN 10204 Type 3.1 mill certificates with Charpy values on request, and materials tested at ILAC-accredited ISO/IEC 17025 laboratories on every project.

A checklist for Puerto Rico and USVI seismic steel

  • Confirm the Seismic Design Category, Risk Category and wind speed for the exact site, including topographic effects.
  • Check which load governs each member, and keep AISC 341 detailing on every SFRS element.
  • Choose the coating system for the ISO 12944 category and coordinate it with slip-critical faying surfaces.
  • Plan column bases and anchor rods for both uplift and seismic overturning.
  • Agree the port, the packing order and the delivery schedule before fabrication starts.

How World Steel supports Puerto Rico and USVI projects

World Steel designs and fabricates structural steel for US contractors in its own plant in Vietnam, the first and only IAS AC472 accredited fabricator in the country. For Puerto Rico and the USVI we design to AISC 360 and AISC 341-22 with ASCE 7 wind and seismic loads, and prepare the calculation report and shop drawings at no extra cost, with SFRS members, demand critical welds and protected zones on every sheet.

Welders and procedures are qualified to AWS D1.8, coatings are applied in the shop by manufacturer-trained painters and checked by FROSIO Level III inspectors, and materials are tested at ILAC-accredited laboratories. With 2,500 t of capacity a month and tracking in PEB Studio, we ship complete packages to San Juan, Ponce and the Virgin Islands. The Engineer of Record approves the design and the US contractor, our customer, carries out the site work.

See Puerto Rico seismic steel design and the Puerto Rico solutions page for local detail. The next article returns to the mainland: Utah, Nevada and the Intermountain West.

Quick answers

Is Puerto Rico a high seismic region?

Yes. Puerto Rico sits on the boundary between the North American and Caribbean plates. The 1918 San Fermín earthquake caused a tsunami on the west coast, and the 2020 southwest sequence, with a magnitude 6.4 main shock, damaged schools, homes and the Costa Sur power plant. Much of the island is designed in Seismic Design Category D.

Which building code applies in Puerto Rico?

The Puerto Rico Building Code, based on the International Building Code with local amendments, applies, with ASCE 7 loads and AISC 341 for steel seismic systems. Permits run through the Office of Permit Management (OGPe) and authorized professionals.

Do hurricanes or earthquakes govern steel design in Puerto Rico?

Often both, in different members or directions. Hurricane wind with basic speeds well above most of the mainland can govern roof and wall framing and uplift, while seismic design governs the detailing of the lateral system under AISC 341.

How does steel reach Puerto Rico and the USVI?

By ocean freight to San Juan, Ponce or Mayagüez in Puerto Rico, and to Charlotte Amalie or the St. Croix ports in the USVI. Packing in erection order and shipping complete are critical on islands.

Keep building your steel plan

Go further on USPEB.com

Keep going in the series

AISC 341 across the US

Twenty-five in-depth articles on where the Seismic Provisions govern in the United States, what they change for each building type, which design decisions set the tonnage, and how a seismic steel package is bought, fabricated and delivered for a US contractor.

US seismic regionsWhere it governs

The West Coast, Alaska, the islands, the Intermountain West, New Madrid and Charleston.

Design decisionsWhat sets the tonnage

Choosing the system, the gravity frame that must follow it, and piles.

Buying and deliveryFrom order to jobsite

Shop drawings, the approved fabricator, overseas sourcing, lead time and site work.

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.