Heat cambering steel beams: vee heats, restraint and the 650°C limit

Heat can put camber into a beam that no press can handle: a short beam, a heavy one, a reverse curve. It works because steel heated under restraint gets shorter when it cools. Here is the physics, the heat patterns, the AISC 360 temperature limits and the reasons heat costs more.

· 6 min read · World Steel USA engineering team

Cold cambering in a press covers most floor beams. For the rest, such as a beam too short for the press, too heavy for its rams, with a web too thin to load, or a member that needs a reverse or compound curve, fabricators turn to heat cambering. It uses a torch, not a press, and it relies on a property of steel that every welder knows: heated metal that is held back from expanding comes out shorter when it cools.

AISC 360 Section M2.1 permits camber to be introduced by heat and limits the temperature. AISC Design Guide 36 (2020), Section 3.3 explains the physics and the procedure. This article summarizes both; the editions named in your specification govern.

The physics in four steps

  1. Heat makes steel want to grow. Structural steel expands in proportion to its temperature over the range used for cambering.
  2. Cold steel around it says no. In a beam, only a small zone is heated. The unheated steel around it resists the expansion, so the heated zone cannot grow in length.
  3. Hot steel is soft. As temperature rises, the modulus of elasticity falls, roughly halving near 650°C (1,200°F), and the yield strength drops quickly above about 425°C (800°F). The restrained, weakened steel yields in compression and thickens sideways instead of growing in length, following the Poisson effect.
  4. On cooling, it shrinks everywhere. The thickened zone cools and contracts in all directions. It is now shorter than before, and it pulls the beam together on that side.

Heat the bottom flange and the lower part of the web near midspan, and the bottom of the beam gets slightly shorter than the top. The beam curves up. That is camber.

The temperature limit and why it sits where it does

AISC 360 Section M2.1 limits the temperature of heated areas to 650°C (1,200°F) for most structural steels, and to 595°C (1,100°F) for quenched and tempered plates such as ASTM A514 and ASTM A852.

The reason is metallurgy. Carbon and low-alloy structural steels start to change crystal structure at the lower critical temperature, around 725°C (1,340°F), as ferrite and pearlite begin to turn to austenite. By the upper critical temperature, roughly 815 to 925°C (1,500 to 1,700°F), the change is complete. Cooling a steel back through that range under shop conditions cannot be controlled well enough to guarantee the original properties. Staying below the lower critical temperature avoids the question.

The 650°C limit leaves room. Temperatures vary across a heated area, and a measured limit about 55°C (100°F) below the lower critical point allows for local hot spots. Design Guide 36 notes that even accidental heating to about 705°C (1,300°F) may mark the surface but should not change the properties if the steel cools slowly.

The heat patterns

For a wide flange beam, the usual pattern is a vee heat in the web combined with a strip heat across the flange.

  • The vee. A triangle is drawn on the web with its point, the apex, up toward the top flange and its open end at the flange to be shortened. The apex usually sits between the k-distance from the far flange and about three quarters of the depth; for thick webs it can extend close to the k-distance, while for very thin webs, under about 10 mm (3/8 in), it is reduced to about half the depth to avoid buckling the web out of plane. The angle at the apex is typically 20 to 30 degrees. A wider vee moves the beam more but risks distorting the web.
  • The strip. A band across the flange directly under the open end of the vee, the same width as the vee where it meets the flange.
  • Line heats. On some light members, a simple line heat on the flange is enough.

Heats are placed near midspan, where they do the most work. A heat at the centerline produces about twice the camber of the same heat at the quarter point. Several heats are usually needed, grouped near the center at spacings of about 600 to 900 mm (2 to 3 ft) so that cold steel remains between them to supply restraint. If the beam is allowed to cool between rounds, the same area can be heated again.

The procedure

Design Guide 36 describes a disciplined sequence:

  • Set up for restraint. The beam is placed with its top flange down, supported close to the ends so its own weight adds restraint. Weights or load-limiting jacks can add more. The setup must stay stable as the beam starts to move.
  • Mark the pattern. The vee and strip are outlined with a 650°C (1,200°F) temperature crayon, and the vee is divided into horizontal bands about 75 mm (3 in) wide to pace the heating. On heavy members both sides of the web are marked.
  • Choose the torch. A high heat-content fuel gas such as propane or a proprietary gas is preferred to natural gas. A single-orifice tip, such as a No. 8, suits most work; rosebud tips are used on material 25 mm (1 in) and thicker, ideally heating both sides at once.
  • Heat fast and in order. Start at the apex, move the torch in small circles until the crayon mark melts, and progress band by band without stopping or going back. Speed matters: the faster the heat, the less it spreads, and the more restraint the cold steel provides.
  • Heat the strip. Work the flange strip from the center out, usually in a transverse back-and-forth pattern.
  • Cool in stages. Let the heated area cool in still air to about 315°C (600°F), then dry compressed air may be used to bring it to ambient.
  • Check and repeat. Measure the camber after cooling. If more is needed, add heats at new positions.

What heat does to residual stress

Studies cited in the guide found that after heat cambering, peak residual stresses in both flanges are compressive, and in the heated flange they may approach yield. The other material properties do not change significantly, so the beam performs as designed. As with cold cambering, residual stresses are self-equilibrating and do not reduce the ultimate strength of the beam.

Special cases where heat is the answer

  • Reverse and compound camber. A continuous beam may need camber up in one span and down over a cantilever. Presses cannot easily produce reverse curves; heat can. Reverse curves need a much tighter radius than ordinary camber and therefore many more heats.
  • Short beams. Below about 7.6 m (25 ft), presses often cannot hold the beam.
  • Heavy or nonuniform members. Members beyond press capacity or with cross sections that do not fit the press.
  • Correcting camber. A beam that came out slightly over or under tolerance after pressing or welding can be adjusted with a few heats.

Because heat is slow and skilled, Design Guide 36 repeatedly suggests checking whether a larger section that needs no camber is cheaper. Its rule of thumb: heat cambering a 6 m (20 ft) beam costs about the same as adding 15 kg/m (10 lb/ft) of steel.

Safety and supervision

Heat cambering puts large, hot, moving steel in a shop. The beam must stay stable as it moves, jacks must be load limited, and the area must be kept clear. A written procedure, a trained operator and temperature checks at every heat are what make the process repeatable.

How World Steel uses heat on cambered members

World Steel fabricates 2,500 metric tons of structural steel a month in its own IAS AC472-accredited plant in Vietnam. Most cambered members we make are either rolled beams cambered cold or welded girders with the camber cut into the web. Heat is used where a member needs it, such as correcting camber or sweep after welding at our straightening and dimensional control station, always within the AISC 360 Section M2.1 temperature limit and checked with temperature crayons.

Where your design calls for a reverse or compound camber, we raise it during shop drawing review, because a welded plate girder with a cut web profile, or a stiffer uncambered member, is often the cleaner solution. The same controlled heat work keeps long, heavy members in line on jobs such as the 5,000-metric-ton Sunpro Steel mill, where crane girders and heavy columns had to meet tight straightness before shipping.

Next in the series: camber radius of curvature and strain.

Quick answers

What temperature limit applies to heat cambering?

AISC 360 Section M2.1 limits heated areas to 650°C (1,200°F) for most structural steels and to 595°C (1,100°F) for quenched and tempered plate such as ASTM A514 and A852.

Why does heating the bottom of a beam make it camber up?

The heated steel tries to expand but the cold steel around it holds it back, so it thickens instead. When it cools it shrinks in every direction and ends up shorter, pulling the heated side of the beam together and curving the beam toward it.

Is heat cambering more expensive than cold cambering?

Yes, usually. It is slow, depends on a skilled operator and is done heat by heat. Design Guide 36 suggests that heat cambering a 6 m (20 ft) beam costs about the same as adding 15 kg/m (10 lb/ft) to its weight.

Does heat cambering damage the steel?

Not when the temperature limit is respected and the steel is allowed to cool slowly at first. Research cited in Design Guide 36 shows the other material properties do not change significantly.

Keep building your steel plan

Go further on USPEB.com

Keep going in the series

Steel beam camber series

Twenty in-depth articles built on AISC Design Guide 36: what camber is, how a shop puts it into rolled beams and welded girders, how much a composite floor beam should get, which members should stay straight, and how camber is specified, measured and accepted under the AISC Code of Standard Practice.

Camber basics

What camber is, the mill bow every rolled shape has, and the alternatives.

Making camber

Presses, torches, the strain involved, camber loss and cambered plate girders.

Composite floors

How much to camber, what changes deflection, and how the concrete goes on.

Special members

Roofs, transfer girders, cantilevers, trusses, joists and members to keep straight.

Specify and accept

The AISC 303 tolerance, shop measurement and what the drawings should say.