Engineering and codes

When not to camber a steel beam: frames, spandrels, cranes and short spans

Camber saves steel on typical floor beams, but on some members it causes more trouble than it solves. Design Guide 36 lists them plainly. This article explains each case and what to do instead, usually a stiffer member.

· 6 min read · World Steel USA engineering team

Camber is a useful tool for composite floor beams. It is the wrong tool for several other members. AISC Design Guide 36 (2020) ends with a list of rules of thumb in Appendix B, and many of them are "do not camber" rules. Each has a reason behind it, set out in Sections 3.2 and 5.6 to 5.9. This article explains when not to camber, and what the guide suggests instead.

The guide is clear that rules of thumb are not absolute. They apply broadly and can be broken with due consideration. But a framing plan that ignores them usually costs more and fits worse.

Members of lateral load-resisting systems

Beams and girders in moment frames and braced frames should not be cambered. Their connections to columns are large and stiff: welded flanges, end plates, gusset plates, often with stiffeners and doubler plates. Those details fit up most economically when members meet at exactly 90 degrees.

A cambered beam has sloped ends. Because camber is usually put in after cutting and drilling, the slope changes the geometry of the connection after it was made. Holes no longer line up, end plates sit out of square, and a CJP-welded flange no longer meets the column face cleanly. On seismic frames, the details are also governed by AISC 341 and must be fabricated exactly as qualified. The seismic steel structures page shows how much those details matter.

Instead: size frame beams for deflection with their stiffness alone. Their size is often set by drift anyway.

Beams with moment, brace or torsional connections

The same logic applies to any beam that needs vertical ends because it connects to flanges for moment, carries a brace connection, or provides torsional restraint. A short-slotted shear tab absorbs the slope of a cambered end. A bolted end plate or a gusset does not.

Instead: use a larger member that needs no camber.

Spandrel beams with brittle façades

Spandrels sit along the exterior wall and carry the slab edge, and often the façade too. Whether to camber them depends on when the façade is attached.

  • If the façade framing, such as cold-formed studs or window wall mullions, goes on after the slab is placed and the camber has "come out", camber does not affect it and can be useful.
  • If façade support steel, such as brick relieving angles over ribbon windows, is installed before the slab is poured, the spandrel moves as the concrete goes on, and camber makes that movement larger.

Design Guide 36 recommends against cambering spandrels that support brittle façade materials such as masonry. They often need a stricter deflection limit than interior beams, and they should be sized for stiffness rather than cambered. The spandrel design should be coordinated with the architectural façade details and the joint limits of the façade system.

Crane girders

Crane girder deflection changes with the lifted load and the position of the crane along the span. Camber offsets a fixed load and cannot follow a moving one. Design Guide 36 recommends that crane beams and crane girders not be cambered, but sized with enough stiffness for the crane requirements in AISC Design Guide 7. Where a crane girder is a wide flange with a welded cap channel, the welding can pull the girder into negative camber, which should be corrected. The crane building design page covers runway deflection limits.

Cantilever beams

Cantilevers should not be cambered, especially those continuous over a support where reverse camber would be needed. Use adjustable connections and a preset tip elevation under the AISC Code of Standard Practice instead. The transfer girder and cantilever article explains the preset.

Members with nonuniform cross sections

Camber is difficult to achieve on members whose cross section is not uniform.

  • A member unsymmetric about its horizontal axis, such as a girder with unequal flanges, can be cambered in principle, but may not fit a press, so heat is needed, which is costly compared with a stiffer member.
  • A member unsymmetric about its vertical axis, such as a channel or a section with one-sided plates, tends to twist and warp when strained to yield. The guide advises against cambering it.

Short beams

Design Guide 36 recommends not cambering members shorter than about 7.6 m (25 ft). Typical presses need reaction points several metres apart and some overhang, so short beams do not fit; they need heat or special procedures, and a larger beam is often cheaper.

Thin webs

Beams with webs thinner than about 6 mm (1/4 in) should not be cold cambered. The press rams bear on the flange above a thin web, and the web can cripple when the flanges are loaded to yield. A larger beam, or heat if camber is essential, is the alternative.

Very small cambers

Camber under about 19 mm (3/4 in) is not worth specifying. A variation that small has little effect on overall floor levelness, and the operation still costs shop time and a measurement.

Holes in the middle third

This one is not "do not camber" but "do not drill": avoid holes in the top flange near the middle third of a beam to be cambered. The cambering strain is highest there and can rupture the net section at a hole. See the cold cambering article.

A quick checklist for the framing plan

Before issuing a framing plan with camber, check that no cambered member:

  • is part of a moment frame or braced frame;
  • has a moment, brace or torsional connection;
  • is a spandrel carrying masonry or façade steel set before the pour;
  • carries a crane;
  • is a cantilever or has a cantilever end;
  • has a nonuniform or unsymmetric section;
  • is shorter than about 7.6 m (25 ft) or has a web under about 6 mm (1/4 in);
  • has a camber under about 19 mm (3/4 in);
  • has top flange holes in the middle third.

What a stiffer member costs

Each "do not camber" rule implies the alternative: a stiffer member. It helps to keep the cost in proportion. Design Guide 36's rule of thumb is that a saving of roughly 4.5 to 6 kg per metre (3 to 4 lb/ft) pays for mechanical cambering of a typical floor beam. Turned around, if the uncambered alternative is only one size heavier and the difference is in that range, it costs about the same as cambering, without any of the risks.

On frame beams, the comparison rarely arises, because their size is usually set by drift or by seismic requirements, not by gravity deflection. On spandrels with masonry, a stiffer member is required anyway by the façade's deflection limit. On short beams, the heavier section is usually cheaper than heat cambering, which the guide compares to adding about 15 kg/m (10 lb/ft) on a 6 m (20 ft) beam. In most of the cases on this list, the stiffer member is not a penalty but simply the right design.

When a rule can be broken

The guide allows rules of thumb to be broken with due consideration. Examples where engineers do so:

  • a beam slightly under 7.6 m (25 ft) when the local fabricator confirms its press can hold it;
  • a spandrel with a lightweight panel façade attached after the slab;
  • a camber below 19 mm on a very flat floor where every millimetre matters.

In each case the exception is deliberate, discussed with the fabricator, and shown on the drawings.

Telling the fabricator why

When a beam that looks like a candidate for camber is deliberately left straight, a short note on the drawing helps: "no camber, frame beam" or "no camber, supports masonry". It stops a well-meaning value engineering suggestion from adding camber back later.

How World Steel reviews camber before fabrication

World Steel fabricates 2,500 metric tons of structural steel a month in its own IAS AC472-accredited plant in Vietnam. During shop drawing preparation, our detailers run the checklist above against every member marked for camber and send questions to your Engineer of Record through the US contractor, our customer, before any steel is cut. Frame beams, crane runway girders and spandrels with masonry are fabricated straight unless the engineer directs otherwise.

That discipline matters most on heavy industrial work: the crane girders and frame members of the 5,000-metric-ton Sunpro Steel mill were fabricated and checked to the straightness their design called for.

Next in the series: camber tolerance and shop measurement.

Quick answers

Should beams in moment frames be cambered?

No. Design Guide 36 recommends against cambering beams or girders in lateral load-resisting systems, because their stiff end connections need square ends and camber slopes the ends.

Can spandrel beams be cambered?

It depends on the façade. If the façade is attached after the slab is placed, camber can help. If it is supported before the pour, or is brittle masonry, the spandrel should be designed stiff instead.

Why not camber crane girders?

Crane girder deflection changes with the crane position and load, so camber cannot offset it. Crane girders should be sized for stiffness to the crane design requirements.

What is the minimum useful camber?

Design Guide 36 suggests not specifying camber under about 19 mm (3/4 in), because so small a variation hardly affects floor levelness.

Keep building your steel plan

Go further on USPEB.com

Keep going in the series

Steel beam camber series

Twenty in-depth articles built on AISC Design Guide 36: what camber is, how a shop puts it into rolled beams and welded girders, how much a composite floor beam should get, which members should stay straight, and how camber is specified, measured and accepted under the AISC Code of Standard Practice.

Camber basics

What camber is, the mill bow every rolled shape has, and the alternatives.

Making camber

Presses, torches, the strain involved, camber loss and cambered plate girders.

Composite floors

How much to camber, what changes deflection, and how the concrete goes on.

Special members

Roofs, transfer girders, cantilevers, trusses, joists and members to keep straight.

Specify and accept