What we measure
Six measurements on every member
Each one prevents a specific problem on site, and each is checked against the shop drawing before the member goes to blasting.
Sets where every connection lands along the frame line
Keeps columns plumb and beams level when they are bolted up
Lets purlins, girts and connection plates seat flat
Makes splices and bolted connections line up without reaming
Keeps moment connections tight and frames true
Confirms the section the engineer designed is the one shipped
Correct, then measure again
How a distorted member is put right
- Straightening machine line
Built-up sections pass through the straightening line, which corrects flange distortion from web-to-flange welding.
- Planned weld sequence
Splices and subassemblies on thin flanges and deep webs are welded in an order that keeps distortion low in the first place.
- Re-measure after correction
A corrected member is measured again; it moves on only after the new figures are inside tolerance.
Tolerances
Where the limits come from
| Shop drawing | Every dimension and any project-specific tolerance your Engineer of Record sets |
|---|---|
| AISC Code of Standard Practice | Fabrication tolerances for structural steel members, by default for US work |
| ASTM A6 | Mill tolerances for the rolled shapes and plate in the member |
| AWS D1.1 | Dimensional tolerances for welded built-up members |
Photo
Photo
Checked by IAS
Our dimensional records are part of the IAS AC472 program, audited twice a year.
Signed, not assumed
Three signatures on the report
Checks the main dimensions after fit-up and the joint preparation before welding
Fitter
Rechecks the main dimensions and joint preparation
Foreman
Checks full dimensions, hole position and hole diameter, and records them on the dimensional inspection report
QC inspector
Questions
Dimensional control questions
What is checked on each member?
Overall length, sweep and camber, member depth and width, flange tilt, hole location and spacing, and end-plate squareness, against the shop drawing.
Which tolerances do you work to?
The shop drawing and any project tolerances set by your Engineer of Record, with the AISC Code of Standard Practice, ASTM A6 and AWS D1.1 tolerances by default for US work.
How are bent members corrected?
Built-up sections go through the straightening machine line after welding, and any corrected member is measured again before it moves on.
Do I get the measurements?
Yes. The dimensional inspection report is kept with the member in PEB Studio and included in the manufacturing data record for your job.
Can my inspector witness dimensional checks?
Yes. Hold and witness points can be attended live on Zoom or Microsoft Teams, or by a third-party inspector you appoint.
See all eight QC checkpoints or book an online factory audit.
Built for large jobs
Put your next steel package through this station
Straightening & dimensions is one of eight stations in a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019 and audited twice a year. Shop drawings are included on every project.
- 5,000 tSunpro Steel Factory
- 2,500 tCPV Food Processing Factory
- 2,000 tLong Son petrochemical complex
- 2,000 tM&D (MD Factory)
Request a quote
Send drawings, a model or a steel list. Our engineers take off the quantities, check the US code basis and price the fabricated steel, delivered to your US port.
Become our partner in the US
You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and OEM supply under your brand.
Watch this station work on your own job. Hold and witness points can be attended live on Zoom or Microsoft Teams, and every record is in PEB Studio.
Book an online audit