"Isn't cambering just bending the beam until it yields? Doesn't that damage it?" It is a fair question, and AISC Design Guide 36 (2020), Section 2.1 answers it with simple geometry. The key is the camber radius of curvature: how sharply the beam has to bend to get its camber, and how much strain that bend puts in the steel. This article works the guide's example in metric units.
Elastic, plastic and strain hardening
A mild structural steel loaded in tension follows a familiar curve. It stretches elastically up to its yield strain, which is the yield stress divided by the modulus of elasticity. Then it flows at roughly constant stress along the yield plateau. Only much further along does it start to strain harden, gaining strength again as it stretches.
If the steel is strained onto the plateau but not into strain hardening, then unloaded, it springs back along a line parallel to the original elastic slope and keeps a small permanent strain. Its properties after unloading are close to those of the virgin material. Cambering works entirely in this zone: it puts a small permanent strain into a short length of the flanges and leaves the rest of the beam elastic.
The strain from a radius
For a doubly symmetric section bent to a radius R, plane sections stay plane, and the strain at the extreme fiber is half the depth divided by the radius:
- maximum strain = d / (2R)
- yield strain = Fy / E
Dividing one by the other gives a strain factor, written α in the guide:
- α = (d / 2R) × (E / Fy)
When α equals 1, the extreme fiber has just reached yield. For ASTM A992 steel, strain hardening begins at about α = 10. So the useful question is: what value of α does a real camber need?
The geometry of a cambered beam
A press does not bend the whole beam into one arc. The curved portion sits in the middle, between the rams, and the parts toward the ends stay straight, like tangents leaving a curve. Design Guide 36 models the beam as:
- a curved middle segment of chord length 2c;
- two straight end segments;
- a small angle θ between the two end tangents.
For the small angles involved, sine and tangent are almost equal to the angle itself, which makes the formulas simple. The total camber Δc is the rise of a straight tangent leg plus the extra rise inside the curved segment. The radius follows from the half-chord and half the angle: R = c / sin(θ/2).
Worked example: a 12 m floor beam
Take the guide's example converted to SI:
- beam W530 × 66 (W21 × 44), ASTM A992, Fy = 345 MPa (50 ksi), E = 200,000 MPa (29,000 ksi);
- depth d = 525 mm (20.7 in);
- span L = 12.2 m (40 ft);
- specified camber Δc = 50 mm (2 in);
- curved segment half-chord c = L/4 = 3.05 m (10 ft).
Step one: find the angle. Solving the camber equation for θ/2 with these values gives an angle of about 0.55 degrees. That tiny angle is also the slope of the beam at its ends, which is what the end connection sees.
Step two: find the radius. R = c / sin(θ/2) = 3.05 m / sin(0.55°) ≈ 160 m (about 525 ft). For comparison, a beam curved for an arched roof might have a radius of 20 to 50 m.
Step three: find the strain factor. α = (525 mm / (2 × 160,000 mm)) × (200,000 / 345) ≈ 0.00164 × 580 ≈ 0.95.
The extreme fiber reaches about 95% of the yield strain on this simplified uniform arc. In practice the press yields the steel slightly beyond that in the middle, but the strain stays on the first part of the plateau, about a tenth of the way to strain hardening. When the rams release, the steel recovers elastically along a line parallel to its original slope.
What changes the numbers
- Depth. For the same camber and span, a deeper beam strains more, because strain is proportional to depth over radius.
- Camber. More camber means a smaller radius and more strain.
- Span. A longer span with the same camber means a gentler curve and less strain.
- Press type. A single-press machine produces a segmented curve, with higher strain concentrated at each load point. Research cited in the guide shows those strains still stay well below strain hardening, and the operator lowers them further by pressing at more points.
Across the normal range of floor beam sizes and cambers, Design Guide 36 concludes that strains remain well below the strain hardening point, so the material properties are essentially those of the specified steel.
Why this matters to the designer
The calculation removes two common worries.
Strength. A cambered beam is designed with the normal properties of its grade. There is no reduction for having been cambered, and the residual stresses left behind are self-equilibrating, so they do not reduce ultimate strength.
Ductility and toughness. Because the steel is not work hardened, its ductility is essentially unchanged. This is different from tight cold bending for architectural curves, where strains can be much larger and AISC Design Guide 33 on curved members gives its own guidance.
The same geometry also explains two practical effects covered elsewhere in the series. The tensile strain is highest in the top flange near midspan, which is why flange holes there should be avoided or drilled after cambering. And the end slope of about half a degree in our example is what simple shear connections must absorb.
A quick check you can do
For a typical camber, a designer can estimate the strain factor without the full geometry:
- approximate the curve as one arc over the whole span, R ≈ L² / (8Δc);
- compute α = (d / 2R) × (E / Fy).
For the example, L² / (8Δc) = 12,200² / (8 × 50) ≈ 372 m, which gives α ≈ 0.4. Concentrating the curve in the middle segment, as a press does, roughly doubles the strain, which is how the guide's more exact value of about 0.95 arises. Either way the answer sits far below 10.
Comparing a few common cases
The same check gives a feel for the range of strain across typical cambered beams, using the single-arc estimate and doubling it for the concentration of curvature between the rams:
- A shallow beam, long span. A W410 (W16) beam about 410 mm deep, 10 m long, with 25 mm of camber: R ≈ 500 m, α ≈ 0.24 on a single arc, roughly 0.5 with the press concentration.
- The guide's example. A W530 (W21) beam 525 mm deep, 12.2 m long, with 50 mm of camber: α close to 1.
- A deep beam, short span, large camber. A W610 (W24) beam about 600 mm deep, 9 m long, with 50 mm of camber: R ≈ 200 m on a single arc, α ≈ 0.9, roughly 1.8 with concentration.
Even the severe case sits below a fifth of the strain where strain hardening begins. To approach α = 10, a beam would need a camber many times larger than any floor needs, which is exactly the range of architectural curving.
Why strain still matters at holes
A strain factor near 1 or 2 means the flange is only just yielding over most of its width. At a bolt hole, however, the remaining net section carries the same force through less steel, and the local strain at the edge of the hole can be several times the average. That is how a modest camber can still crack a flange at a hole in the middle third, the failure Design Guide 36 shows in its photographs. The strain calculation and the hole rule are two sides of the same mechanics.
Units in the formula
The strain factor is dimensionless, so any consistent units work: millimetres and megapascals, or inches and ksi. The only trap is mixing them, for example depth in millimetres and radius in metres, which changes the answer by a factor of one thousand. Converting everything to millimetres first, as in the example above, avoids it.
How World Steel applies the geometry
World Steel fabricates 2,500 metric tons of structural steel a month in its own IAS AC472-accredited plant in Vietnam. When our engineers prepare calculations for your Engineer of Record, the design report lists the camber of each typical beam, and our detailers use the same geometry to predict the end slope and check that simple connections can absorb it.
For members with larger curvature, such as arched rafters, we cut the shape into a welded web instead of bending a rolled section, as shown on the curved and cambered members page. Where a curve is far tighter than a camber, as on the arched rafters of the Goldfields Arts Centre in Western Australia, we cut the curve into the web rather than strain a rolled shape.
Next in the series: camber loss and residual stress.
Quick answers
What radius of curvature does a typical camber need?
Large. In the Design Guide 36 example, a 12.2 m (40 ft) beam with 50 mm (2 in) of camber has a radius of about 160 m (525 ft) in its curved portion.
Does cambering strain harden the steel?
No. For A992 steel, strain hardening starts around ten times the yield strain. Typical cambers strain the extreme fiber to about one times the yield strain, far below that.
Why does the curve sit only in the middle of the beam?
Because of the press geometry and efficiency. Most of the bending happens between the rams, roughly the middle quarter to third of the length, while the ends stay as straight tangents.
Is a single-press camber more severe than a double-press one?
A single press concentrates strain at each load point, so local strains are higher, but they remain well below strain hardening and fall as more press points are used.
Keep building your steel plan
Go further on USPEB.com
On this topic
Across the US market
- US codes and standardsIBC, AISC, AWS and MBMA, designed to
- Seismic steel structuresSDC D to F framing for West Coast jobs
- Crane building designUS crane standards for mill and bay buildings
- Large projects, 2,500 t a monthCapacity for large US general contractors
- Contractor partnershipLong-term supply for US contractors
- Solutions by stateState-by-state steel solutions


