Fabrication process · Fit-up and welding

Fitted to the drawing, welded to a qualified procedure

Fit-up is where a straight member becomes a column with stiffeners, end plates and clips in the right place. Fitters lay out from the shop drawing, check every part before tacking, and welders then finish the joints with procedures and qualifications that are on file and matched on each weld report.

ISO 3834-2 shop weldingAWS D1.1 welder testsAWS D1.8 for seismic

Fitter comparing a built-up beam with its shop drawing

Fit-up

Four rules before the first tack

Fitting is checked by the fitter, the foreman and QC. Nothing is welded until the fit-up matches the shop drawing.

Read the drawing first

The fitter checks length, hole spacing, hole diameter and quantity of each part against the shop drawing before fitting.

Mark the work points

Center lines and work points are drawn on the main member, and gusset and bracket positions are marked and rechecked.

Control the root gap

Full-penetration joints are fitted with a root gap of no more than 3 mm (about 1/8 in), or the preparation the WPS calls for.

Tack where the weld will cover

Tacks hold parts firmly, are kept away from weld ends and corners, and sit where the final weld covers them.

Processes

Three welding processes, each where it fits

SAW

Submerged-arc welding

Web-to-flange seams on the automatic beam lines

FCAW

Flux-cored arc welding

Stiffeners, end plates, gussets, clips and splices

GMAW

Gas metal arc welding

Shop fillet welds on fitted parts where it suits the joint

The paper behind every weld

  1. WPS

    Written welding procedure specification for each joint type

  2. PQR

    Procedure qualification record proving the WPS by test

  3. Welder

    Welders qualified by test in accordance with AWS D1.1

  4. Weld report

    Each report in PEB Studio is matched to the WPS, PQR and welder

All four live in PEB Studio, matched member by member. Seismic work follows our AWS D1.8 page. How each record is written and qualified: WPS, PQR and welder qualification guide.

Shop controls

What keeps a weld sound

Clean, dry joints
Mill scale, rust, paint and grease are removed by wire brush or grinding before welding.
Preheat for thick steel
Base metal is preheated when the WPS requires it and whenever it is thicker than 38 mm (about 1 1/2 in).
Run-off tabs
Butt and fillet welds start and finish on run tabs with the same edge preparation, removed and ground afterwards.
Seismic work
AWS D1.8-qualified procedures and welders for demand-critical welds in seismic force-resisting systems.
Welder looking over the stiffeners and end plate of a heavy column Built-up members with welded stiffeners and drilled clip plates on shop supports Pair of red truss assemblies with bolted connection plates inside the shop Crew assembling a large steel truss on the shop floor

Questions

Fit-up and welding questions

Which welding processes do you use in the shop?

Submerged-arc welding (SAW) on the automatic beam lines, and flux-cored (FCAW) or gas metal arc (GMAW) welding for stiffeners, end plates, clips, gussets and splices.

How are welders qualified?

Welders are qualified by test in accordance with AWS D1.1, and their qualifications are on file. Each weld report is checked against the WPS, the PQR and the welder’s own qualification.

Can you weld seismic frames to AWS D1.8?

Yes. The shop has AWS D1.8-qualified welding procedures and welders for demand-critical welds in seismic force-resisting systems, as your Engineer of Record specifies.

What inspection do welds get?

Every weld is visually inspected. UT, MT or PT is done to the extent the Inspection and Test Plan sets. Bureau Veritas certifies our shop welding at the EN ISO 3834-2 level.

What happens when a weld is rejected?

It is marked, repaired by the repair team and re-inspected by QC. The nonconformance stays on the member’s record, and the member cannot move to the next station until QC releases it.

Built for large jobs

Put your next steel package through this station

Fitting & welding is one of eight stations in a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019 and audited twice a year. Shop drawings are included on every project.

  • 5,000 tSunpro Steel Factory
  • 2,500 tCPV Food Processing Factory
  • 2,000 tLong Son petrochemical complex
  • 2,000 tM&D (MD Factory)
Our large-project program

Request a quote

Send drawings, a model or a steel list. Our engineers take off the quantities, check the US code basis and price the fabricated steel, delivered to your US port.

Become our partner in the US

You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and OEM supply under your brand.

Watch this station work on your own job. Hold and witness points can be attended live on Zoom or Microsoft Teams, and every record is in PEB Studio.

Book an online audit