Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Two welders operating a submerged-arc welding station on a member

Submerged-arc welding of web-to-flange seams in the Vietnam plant.

Seven weld types, in depth

Every weld type on your steel, explained, welded and inspected to AWS D1.1

Fillet, CJP, PJP, flare, plug and slot, demand-critical and stud welds: how each one works, how we weld it and how it is proven, in a plant that fabricates 2,500 metric tons of structural steel a month.

Structural steel weld types

Seven weld types carry almost every load in a steel building

Every connection on your drawings is welded with one of a short list of weld types. Each has its own geometry, its own way of counting strength, its own inspection and its own place in AWS D1.1 and AISC 360. This group explains each one in depth, shows how we prepare, weld and inspect it in our plant in Vietnam, and links it to the tests that prove it.

The Engineer of Record chooses the weld type and size. We detail it on the shop drawings, weld it to a qualified WPS and inspect it against the code before the member moves on.

Welder beside a deep built-up girder running through the automatic line Photo
A deep plate girder going through automatic welding at World Steel, Vietnam.

The symbol chart

Seven weld types, one in-depth page each

Each card shows the weld as it appears on a shop drawing, in the manner of AWS A2.4: the arrow points at the joint, the symbol below the line is the weld on the arrow side.

Reading a weld symbol

Eight parts of the symbol on every shop drawing

Our shop drawings show every weld with its symbol, so your reviewer and our welders read the same instruction. This is how to read one.

8

An 8 mm fillet weld on the arrow side. On a US job in inch units the same weld reads 5/16.

  • Arrow

    Points at the joint. The side it touches is the arrow side.

  • Reference line

    The horizontal line everything else hangs on. Below it means arrow side, above it means other side.

  • Basic symbol

    The shape of the weld: a triangle for a fillet, a V or bevel for a groove, a box for a plug or slot.

  • Size and length

    Size to the left of the symbol, length and pitch to the right, in the drawing units.

  • Tail

    Carries the process, the WPS, CJP or PJP, or a note. Left off when nothing needs saying.

  • Field weld flag

    A flag at the junction means the weld is made on site, by the erector, not in our shop.

  • Weld all around

    A circle at the junction means the weld runs all the way around the joint.

  • Both sides

    A symbol on both sides of the line means the joint is welded from both sides.

Which weld where

Ten common joints and the welds that usually make them

A starting point for reading drawings, not a design rule: the Engineer of Record chooses the weld for each joint.

JointFilletCJPPJPFlarePlugDCStud
Built-up girder, flange to web Usual weld Also used Also used
Beam flange to column, moment connection Usual weld Also used
Shear tab, clip angle, end plate to beam Usual weld
Stiffeners and continuity plates Usual weld Also used
Column splice Also used Usual weld Also used
Column to base plate Usual weld Also used Also used
Built-up box column corner Also used Usual weld
HSS brace or post to plate Also used Usual weld
Cover plate or lapped doubler Usual weld Also used
Composite beam, embed plate, column face Usual weld

Usual weldAlso used, depending on the design

From design to inspection

How a weld gets from the design drawing to your steel

Engineer of Record

Sets the weld type, size and any demand-critical or NDT requirement on the design drawings, or delegates connection design.

World Steel detailers

Show every weld with its symbol and WPS on the shop drawings, sent for your review and approval.

Qualified WPS and welder

Each weld is made to a written procedure, qualified to AWS D1.1 (and AWS D1.8 for seismic welds), by a welder qualified for it.

World Steel QC

Visually inspects every weld, runs the specified NDT and records it by piece mark before coating.

On our floor

Five welding processes, each on a qualified procedure

The process for each weld is the one named on its qualified WPS and shown in the tail of the weld symbol where the drawings need it.

Two welders operating a submerged-arc welding station on a member Photo
Submerged-arc welding of web-to-flange seams in the Vietnam plant.
Fitter comparing a built-up beam with its shop drawing Photo
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.
Operator at the control panel of an automatic beam welding line, a built-up beam in front Photo
Running the automatic beam line from its control panel, World Steel in Vietnam.

Weld types on large jobs

Hundreds of thousands of welds a year, one set of rules

Our plant fabricates 2,500 metric tons of structural steel a month. On a large US job that is tens of thousands of welds per release: fillets on every stiffener, CJP welds on every moment connection, studs on every embed. Each weld type has its own qualified procedures, its own gauges and its own line in the inspection report, so the rules hold at volume.

  • 2,500 metric tons of structural steel a month from our own plant
  • First and only IAS AC472 accredited fabricator in Vietnam
  • AWS D1.8-qualified procedures and welders for seismic work
  • Production and inspection tracked live in PEB Studio
Long shop floor of built-up members, overhead cranes and a center walkway Photo
One of the World Steel fabrication halls in Vietnam where US orders are built.
Stiffened heavy plate girders resting on shop supports Photo
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.

Questions from US reviewers

Weld type questions we hear most

Which weld type is used most on a steel building?

The fillet weld, by far. Stiffeners, clip angles, shear tabs, end plates, base plates and most web-to-flange welds on built-up members are fillet welds. Groove welds are used where a weld has to develop the full strength of the part, such as moment connections and splices.

Who decides whether a joint is fillet, CJP or PJP welded?

The Engineer of Record, on the design drawings, or the connection designer where connection design is delegated. Our detailers show the weld on the shop drawings and you review and approve them before fabrication.

Are your welds made to AWS D1.1?

Yes. Structural welds are made to written procedures qualified to AWS D1.1, by welders qualified for the process and position, and seismic welds to AWS D1.8 as well. AWS does not certify fabricators, so we say qualified to, not certified by.

What is the difference between CJP and PJP?

A complete-joint-penetration weld fuses through the full thickness of the joint and develops the strength of the part. A partial-joint-penetration weld is designed with a set effective throat that is less than the thickness. CJP welds usually need back-gouging or backing and are often UT tested; PJP welds are not.

Do you weld shear studs in the shop?

Yes, where the market allows it. We weld headed studs in our shop to AWS D1.1, for example on embed plates, column faces and beams where studs do not get in the way of the erector. Studs on beam top flanges are left for field installation where US erection rules or the contractor require it.

What is a demand-critical weld?

A weld in a seismic force-resisting system that AISC 341 names as critical to the frame’s performance, such as the CJP welds of beam flanges to columns in special moment frames. It needs notch-tough filler metal and the extra steps of AWS D1.8.

How are welds inspected?

Every weld is visually inspected by our QC. Other tests, MT, PT, UT, PAUT and RT, are performed where your specification or the code calls for them, by our QC, by the third party you designate, or, for RT, through our partner.

Can I see the weld symbols before fabrication?

Yes. Shop drawings with every weld symbol are sent to you for review and approval, and the WPS for each weld is part of the welding submittal. Production is tracked live in PEB Studio.

Send us your connection drawings

We will show the weld types, procedures and inspection behind every joint in your quote, from a plant that fabricates 2,500 metric tons a month.