Inspector access

Your inspector at our hold points, in person or on screen

Distance should not cost you a single inspection. Name your QA agency or special inspector, and every hold and witness point in your ITP comes with a notice. They can fly in, or watch the check live from the US and keep the recording.

Fit-up · witness point at the World Steel plant LiveFit-up · witness point
Welds · hold point at the World Steel plant LiveWelds · hold point
Dimensions · witness point at the World Steel plant LiveDimensions · witness point
Coating · witness point at the World Steel plant RecordedCoating · witness point

Zoom or Microsoft Teams · recording kept on file

On the call

Who can inspect your steel at our plant

Anyone you appoint can check the work. The IAS inspections run alongside, on their own schedule, for the accreditation.

Your special inspector

Shop inspection under IBC Chapter 17 when your building official requires it.

At the plant or by video

Your QA agency

Third-party quality assurance hired by you or the owner, following your ITP.

At the plant or by video

Your project team

Project managers, engineers and the owner’s representative who want to see the work.

Plant visit or live call

Smith-Emery for IAS

Periodic AC472 plant inspections for the accreditation, separate from your job’s inspections.

On site, on IAS’s schedule

One hold point

From the ITP to a signed release

  1. Set in the ITP

    Both parties agree which checks are hold points and which are witness points before fabrication starts.

  2. Notice sent

    When a member reaches that point, your inspector gets a notice with the piece marks, the check and the time.

  3. Check held

    Your inspector stands beside our QC at the plant, or joins over Zoom or Microsoft Teams with a camera at the member.

  4. Record filed

    Readings, photos and the video record go into PEB Studio against each piece mark.

  5. Point released

    A hold point is released only when it is signed off; a witness point goes ahead if your inspector chooses not to attend.

Which checks become hold and witness points: the Inspection and Test Plan.

What your inspector can ask for

  • Mill certificates for the heats in front of them
  • The WPS and PQR behind any weld
  • Welder qualification records for the welder on the job
  • A tape, a gauge or a camera on any dimension
  • Film thickness and adhesion readings on the coat
  • The NCR log and how each item was closed

Shop inspection and IBC Chapter 17

IBC Chapter 17 expects special inspection of fabricated load-bearing steel, and lets the building official waive the shop portion for an approved fabricator. Plan reviewers often look to IAS AC472 accreditation for that approval. Whether the waiver applies to your job is your building official’s decision, so raise it early in plan review.

About our IAS AC472 accreditation

On your site

Our scope ends when the steel leaves the plant. Inspection during erection, bolting and field welding stays with your special inspector, your Engineer of Record and your building official on site.

Visit the plant before you award

Questions

Questions about inspecting your steel

Can our inspector watch inspections by video?

Yes, on request. We connect your inspector over Zoom or Microsoft Teams with a camera at the member, so they can ask for any reading or angle. The recording is kept on file with the job.

Is a video inspection accepted by building officials?

It depends on your jurisdiction and your special inspector. Many use video for witness points and visit in person for key hold points. Agree the method with your inspector and building official before fabrication starts.

How much notice does our inspector get?

Notice timing is agreed in your ITP before fabrication starts, so your inspector can plan travel or a call for each hold and witness point.

What is the difference between a hold point and a witness point?

At a hold point, work stops until the check is signed off. At a witness point, your inspector is notified and may attend; if they choose not to, the work goes ahead and the record is filed.

Is Smith-Emery our inspector?

No. Smith-Emery Laboratories (IAS AA-554) carries out the periodic plant inspections for our IAS AC472 accreditation. Inspections for your job are done by the inspector or agency you appoint.

Can we audit the plant before we award the job?

Yes. That is a supplier audit rather than a job inspection: visit the plant in Vietnam, or take an online factory audit by video.

Tell us who will inspect your steel

Send your specification and ITP requirements. We set up the hold and witness points, the notices and the video link before the first cut, at a plant that fabricates 2,500 metric tons a month.