Shielded metal arc welding

Shielded metal arc welding for repairs, tacks and tight access, with low-hydrogen electrodes

Stick welding where a wire gun cannot reach, always with dry low-hydrogen electrodes and qualified procedures, in a plant that fabricates 2,500 metric tons of structural steel a month.

The oldest arc in the shop

Shielded metal arc welding needs only a stick, a holder and a power source

In shielded metal arc welding (SMAW, or stick welding) a coated electrode is struck against the steel. The core wire melts into the joint and the coating burns to make gas and slag that shield the weld. It is slower than the wire processes, but needs no wire feeder or gas, reaches where a gun cannot, and is the process of choice for short welds, tight corners and repairs. On structural steel it is done with low-hydrogen electrodes, kept dry in ovens.

A low-hydrogen electrode is only low-hydrogen while it is dry. Ours go from sealed cans or ovens to the welder, and back into the oven or the bin when their time is up.

Welder looking over the stiffeners and end plate of a heavy column Photo
Column stiffeners and end plate under inspection at World Steel, Vietnam.

The covered electrode

A steel core, a flux coating and the arc they make

As the stick burns, the coating turns to gas and slag. The welder feeds it down and along the joint by hand.

Core wire Coating Gas shield Slag

Core wire

Carbon steel rod that carries current and melts into the weld.

Coating

Flux that makes shielding gas and slag, stabilises the arc and adds alloy.

Gas shield

Formed as the coating burns, keeping air away from the arc.

Slag

Covers the bead as it cools, then is chipped off before the next pass.

Reading the stick

E7018 H4R, printed on every electrode

AWS A5.1 covers carbon steel covered electrodes, AWS A5.5 low-alloy ones (E8018, E9018 and so on). Structural welds to AWS D1.1 use low-hydrogen electrodes such as E7018.

E

Electrode.

70

Weld metal tensile strength of at least 480 MPa (70 ksi).

1

Usable in all positions.

8

Coating type: low-hydrogen potassium with iron powder, AC or DC electrode positive.

H4R

Optional: diffusible hydrogen no more than 4 ml per 100 g, and R for resistance to moisture pick-up.

Holding oven120 °C (250 °F) +
Atmospheric exposure limits for low-hydrogen electrodes, paraphrased from AWS D1.1
E70XX (AWS A5.1)4 hours
E70XXR (moisture resistant)9 hours
E80XX2 hours
E90XX1 hour
E100XX and E110XX30 minutes

Low hydrogen

How long an electrode can be out of the oven

After leaving a sealed can or holding oven. Electrodes exposed longer are re-dried to the code and manufacturer’s rules, or scrapped. Holding ovens are kept at 120 °C (250 °F) or more, and an electrode is re-dried only once. Wet electrodes are discarded.

In our shop

Where stick welding still earns its place

The Engineer of Record sets the weld; the WPS shows when SMAW is used, mostly for the short, tight and repair work.

Repairs

Re-welding after a defect is removed, to the repair WPS.

Tight access

Corners and short welds a wire gun cannot reach.

Tack welds

Fitting tacks that become part of the final weld or are removed.

Stud fillet repairs

A fillet weld round a stud with incomplete flash, where allowed.

Short welds

Odd short welds where setting up a wire process would cost more.

Root passes

Where the WPS calls for a stick root under a wire fill.

Tubular column with a square base plate and bolt holes, crew working behind it Photo
Column with its base plate and anchor-bolt holes, fabricated in the Vietnam plant.
Welder guiding a drilled base plate hanging from a jib hoist Photo
A drilled base plate on its way to fit-up in the Vietnam plant.
Welded members with drilled end plates laid out side by side Photo
Members with drilled end plates waiting for release, Vietnam plant.

Fitting

Tack welds are welds too

Paraphrased from AWS D1.1. A tack that stays in the joint becomes part of the final weld, so it is held to the same rules.

By qualified welders

Tack welders are qualified for tacking, or are qualified welders.

Same preheat

Tacks that become part of the weld get the same preheat as the weld.

Same quality

Cracked or defective tacks are removed before the weld is made over them.

Removed where needed

Tacks outside the final weld are removed where the code or design says so.

Weld repairs

From a found defect to a re-inspected weld

Every repair follows a repair WPS and is recorded against the piece mark, so your inspector can trace it.

Find and mark

VT, MT or UT locates the defect and its extent.

Remove

The defect is gouged or ground out to sound metal, with a smooth, open profile.

Prove it is gone

MT or PT on the excavation where cracks were found.

Re-weld

Welded to the repair WPS, with preheat, by a qualified welder.

Re-inspect

Tested again by the same method that found the defect, and recorded.

On the WPS

Six things the procedure fixes for SMAW

Every weld is made to a written welding procedure specification, prequalified or qualified by test to AWS D1.1 (and AWS D1.8 for seismic welds), by a welder or operator qualified for it.

Electrode

AWS A5.1 or A5.5 classification, diameter and the low-hydrogen requirement.

Current and polarity

Amperage range for each diameter, AC or DC electrode positive.

Position and progression

Positions allowed, and uphill progression on vertical welds.

Preheat and interpass

Minimum preheat by steel and thickness, maximum interpass.

Electrode care

Storage, oven and exposure rules for the electrodes.

Joint detail

Joint type, root opening, groove angle and backing.

Questions

SMAW questions from US reviewers

Do you still use stick welding?

Yes, for repairs, tack welds, short welds and joints a wire gun cannot reach. Production welds on long seams and connections are made by SAW, FCAW or GMAW.

Is SMAW prequalified under AWS D1.1?

Yes. SMAW is one of the processes AWS D1.1 allows on a prequalified WPS, using low-hydrogen electrodes and the code’s limits on joints and electrode sizes.

How long can an E7018 electrode stay out of the oven?

Under AWS D1.1, up to 4 hours for E70XX electrodes and 9 hours for moisture-resistant E70XXR, after leaving a sealed can or holding oven. Then they go back for re-drying or are scrapped.

Why do low-hydrogen electrodes matter?

Hydrogen from a damp coating can cause cracking under the weld, hours after welding, especially on thick or high-strength steel. Dry low-hydrogen electrodes and preheat prevent it.

How is a weld repair controlled?

The defect is removed to sound metal, checked by MT or PT where cracks were found, re-welded to a repair WPS by a qualified welder, then re-inspected by the method that found it and recorded.

Who qualifies the tack welders?

Tack welds are made by welders qualified for them, with the same preheat as the weld they become part of. Defective tacks are removed before welding over them.

Ask how we control repairs

We will walk your inspector through our repair procedure and records, from a plant that fabricates 2,500 metric tons a month.