Why buy them fabricated
Your crew bolts, it does not cut
Fabricated complete
Holes, copes, plates and clips are done in the shop, not on your site.
Traceable to the heat
Each member is tracked to its mill certificate in PEB Studio.
Materials from Vietnam
Rolled shapes from mills in Vietnam, no exceptions.
Mixed with built-up steel
Rolled and built-up members are detailed in one model and shipped together.
In our shop
Saw, drill, weld, coat, mark
- Sawn to lengthMembers cut on band saws to the shop drawing.
- Drilled and copedHoles and copes placed for bolted connections.
- Plates and stiffeners weldedShop welds to qualified AWS D1.1 procedures.
- InspectedDimensional and weld checks recorded.
- Coated and markedCoating applied, erection mark painted on.
Photo
Photo
PhotoSpecification
Rolled members, fabricated
- Shapes
- Wide-flange, channel, angle, tube and plate, to the sizes on your design
- Material
- From mills in Vietnam to the ASTM grades specified, such as A992, A572 or A36
- Traceability
- Mill certificates by heat number; EN 10204 3.1 with Charpy results on request
- Fabrication
- Sawing, drilling, coping, plates and stiffeners, welded to AWS D1.1
- Tolerances
- To AISC 303 Code of Standard Practice and ASTM A6
- Finish
- Primer, paint system, galvanizing or duplex
Where it goes
Where rolled members do the work
Questions
Hot-rolled members, answered
Where do the rolled shapes come from?
From steel mills in Vietnam. The mill is named for each job in the submittals, with certificates by heat number.
Can you supply shapes to US designations?
We order to the ASTM grades and sizes on your design. Where a size is not rolled in Vietnam, our engineers propose an equivalent rolled or built-up section for your Engineer of Record to approve.
Do you just supply the shapes, or fabricate them?
We fabricate them: cut to length, drilled, coped, with plates and stiffeners welded, coated and marked. They arrive ready to erect.
Can rolled and built-up members ship together?
Yes. They are detailed in the same Tekla model, packed by erection sequence and shipped in the same containers.
More in Primary Structural System: Pre-Engineered Metal Buildings · Rigid Frame Systems · Built-Up Steel Columns · Built-Up Steel Rafters · Tapered Frames · Steel Trusses · Long-Span Steel Structures · Multi-Storey Steel Framing
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Hot-Rolled Structural Members
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Photo
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.