Design step: structural analysis

Every member checked against the combination that governs it

Primary frames, bracing and cold-formed secondary members are modeled in SAP2000 and checked to AISC 360 and AISI S100 for every load combination the design basis calls for. The result is a Design Report your Engineer of Record can follow from the first load to the last reaction.

From geometry to report

How an analysis runs

The same sequence for a single warehouse or a campus of buildings. What changes on a large job is the number of frame types, not the discipline.

Geometry

Frame lines, member depths, haunches, supports and bracing bays from the approved concept.

Loads

Dead, collateral, live, snow, wind, seismic and crane cases from the frozen design basis.

Combinations

Strength and serviceability combinations from ASCE 7, in LRFD or ASD as your engineer prefers.

Second-order analysis

Stability analysis that captures P-delta effects and member imperfections.

Member and connection checks

Strength, stability and serviceability for every member and connection in the supply.

Design Report

Inputs, results and checks bound into one document for review.

What goes into the model

Six parts of a steel building, each modeled for what it does

Rigid frames

Clear-span and multi-span frames with web-tapered or prismatic members, modeled with the real variation in depth along each member.

Bracing systems

Rod, angle and portal bracing in roof and walls, with the load path from roof diaphragm to foundation traced bay by bay.

Wind columns and end walls

End wall posts, wind columns and their connection to the roof bracing, designed for out-of-plane wind.

Crane runways

Runway beams, brackets and stepped columns, with crane impact, lateral and longitudinal forces from the crane supplier’s data.

Mezzanines and floors

Beams, columns and connections for mezzanine and floor loads, and their effect on the main frame.

Cold-formed purlins and girts

Z and C sections as simple or lapped continuous spans, with laps, flange braces and sheeting restraint taken into account.

Member by member

The checks every piece of steel goes through

Stability by the direct analysis method

AISC 360 Chapter C: a second-order analysis with reduced stiffness and notional loads, so slender frames are not left to effective-length guesswork.

Flexure, shear and axial force

Each member checked for its own forces and for combined force and moment under AISC 360 Chapter H.

Lateral-torsional buckling

Unbraced lengths come from the real positions of purlins, girts and flange braces, so the inner flange is restrained where the check assumes it is.

Web-tapered members

Tapered rafters and columns checked using the approach in AISC Design Guide 25, including web slenderness at the deep end.

Purlin and girt uplift

Cold-formed members checked to AISI S100 for gravity and for wind suction, including the corner and edge zones of the roof.

Bolted connections

End-plate moment connections, splices, brace and clip connections designed for the forces from the model, with bolts to ASTM F3125.

Base plates and anchor rod forces

Base plates sized for the column reactions, following AISC Design Guide 1, with anchor rod tension and shear reported to the foundation engineer.

Deflection and drift

Serviceability results compared with the limits agreed on the design basis, under the load levels agreed for each check.

Light, not thin

Where the weight comes out

A lighter frame is the result of letting each member be sized by the combination that governs it. Webs taper where the moment drops, flange braces go where the stability check needs them, purlin laps grow over the supports where continuity pays, and bracing moves to bays where it is short and direct.

None of this goes below the code check. It also feeds the plant: fewer, lighter pieces mean fewer containers and a frame our 2,500-metric-ton-a-month shop can run in long, efficient batches.

Who owns this step

Clear lines between our scope and yours

World Steel designs and fabricates the steel structure. Approval, the PE seal, the permit and the erection stay with the US contractor and the Engineer of Record they appoint.

World Steel

Designs, details and fabricates the steel in Vietnam

Builds and runs the analysis model, checks every member and connection in its supply, and issues the Design Report with the approval drawings.

Your Engineer of Record

Reviews, approves and seals for your permit

Reviews the Design Report and the approval drawings against the design basis, asks questions and approves them before sealing the set for your permit.

The US contractor, our customer

Submits, builds the foundations and erects

Passes the column reactions to the foundation engineer and keeps the owner’s changes flowing back through the design basis.

Questions from US contractors

Questions about the analysis

Which software do your engineers use?

SAP2000 for structural analysis of frames and bracing, with member and connection checks to AISC 360 and cold-formed checks to AISI S100. The model is then built in Tekla Structures for detailing.

Do you design in LRFD or ASD?

Either. Most of our US work uses LRFD, but if your Engineer of Record or the owner’s standard calls for ASD, the design basis says so and every check follows it.

Do you design the connections too?

Yes, every steel connection in our supply: end plates, splices, brace connections, clips and base plates. Anchorage into concrete, including anchor rod embedment and the concrete checks, stays with your foundation engineer.

Can our engineer see the analysis model?

The Design Report shows the model geometry, loads and results in full. If your Engineer of Record wants the native model as well, ask at proposal stage and it is set out in the contract.

How do you keep the steel light without cutting margins?

By letting the governing combination size each member, tapering webs where the moment drops and placing flange braces where the stability check needs them. Every result stays within the code check; nothing is trimmed below it.

What if a load changes during analysis?

It goes back onto the design basis first, then into the model. The affected members are rechecked and the Design Report is reissued under a new revision.

Keep reading

Where this step connects

Want our engineers to check a frame?

Send the drawings and the design criteria. We will model the steel, show where the governing combinations land and tell you where weight can come out within the code check.