Many beams, one saved picture
One probe, dozens of beam angles, and a scan you can open again next month
A phased array probe holds many small elements in one housing. By firing them a few billionths of a second apart, the instrument steers and focuses the beam electronically, sweeping through a fan of angles without moving the probe. Run along the weld on an encoder, it builds a picture of the whole joint, position by position, and saves it as a data file. Your reviewer sees what the technician saw, not only what was written down.
Conventional UT leaves you a report. PAUT leaves you the scan.
Four ways to see one scan
S-scan, B-scan, C-scan and A-scan from the same data
Because the scan is encoded and saved, the same data can be cut into a cross-section, a side view, a plan view or a single trace, by the technician today or your reviewer later.
S-scan (sectorial)
A fan of angles from one probe position: a cross-section of the weld, with the flaw drawn where it sits.
B-scan
A side view through the thickness along the scan line.
C-scan
A plan view of the weld length, showing where along the joint indications lie.
A-scan
The single echo trace at any point, the same signal conventional UT shows.
Side by side
Conventional UT and phased array, compared
Both use the same physics and the same acceptance thinking. The differences are in coverage, the record you keep and what it takes to set up.
| Aspect | Conventional UT | Phased array UT |
|---|---|---|
| Beam angles | One fixed angle per probe; change probes to change angle | A sweep of angles from one probe, for example 40° to 70° |
| Coverage | Raster scanning by hand across the weld | Line scan along the weld covers the volume in fewer passes |
| Record | Written report of indications found | Encoded data file of the whole scan, kept for review |
| Flaw picture | Echo height and sound path, interpreted by the technician | An image of the cross-section with the flaw in place |
| Setup | Quick to set up, simple equipment | Scan plan, focal laws and calibration take longer |
| Code standing | The standard AWS D1.1 UT procedure | An advanced technique under AWS D1.1, used with the Engineer’s approval |
| Technician | Qualified in conventional UT | Qualified in UT plus PAUT-specific training |
Where it pays off
Four cases where PAUT earns its setup time
Thick CJP welds
Heavy flanges, box column corners and transfer girders, where several angles are needed to cover the joint.
Many identical welds
A large job with repeated splices, where a scan plan set once is run on every joint.
Reviewers who want the data
Owners, QA agencies or insurers who want to re-read the scan, not only the report.
Sizing a flaw
When the Engineer allows flaw sizing instead of automatic repair, the image gives height and position.
Approval path
From written procedure to an ITP line
Under AWS D1.1, phased array is an advanced UT technique used with the Engineer’s approval. These four steps happen before the first production scan.
Written procedure
Probe, wedge, focal laws, scan plan, calibration and acceptance criteria, in one document.
Qualified on mockups
The procedure is proven on mockup welds with known reflectors, showing the beam reaches the whole joint.
Engineer’s approval
Your Engineer of Record approves PAUT, and the acceptance criteria, before production testing starts.
Written into the ITP
Which welds get PAUT, who performs it, and how the data files are delivered.
What you receive
Six things stored with every scan
A saved scan is only useful if it can be re-read. Each file carries what a reviewer needs to open it, line it up with the steel and check the settings.
- Weld ID, piece mark and scan start point
- Encoder position along the weld
- Focal laws, angles and probe offset
- Calibration and sensitivity settings
- Indications with length, height and depth
- Technician, date and instrument serial
Who performs it
Who performs PAUT on your job
The Inspection and Test Plan both sides agree before production names who performs each test, where it happens and how the results come back to you.
In-house, by World Steel QC
Our QC performs PAUT to the extent your specification assigns to the fabricator, to written procedures, with calibrated equipment, at the plant in Vietnam.
Or by the third party you designate
Your QA agency, special inspector or testing firm can perform or witness PAUT at hold points in our plant, live by video alongside our QC, or on arrival at site.
Agreed in the ITP
Each PAUT line in the Inspection and Test Plan names the method, extent, acceptance criteria and who performs it, before production starts.
Weld types
The welds PAUT checks on your steel
Each weld type has its own landing: how it is sized, how we weld it, and how it is inspected.
The other methods
Five more ways we test a weld
Questions
Phased array ultrasonic testing questions from US reviewers
Is PAUT accepted under AWS D1.1?
AWS D1.1 allows advanced UT techniques such as PAUT when the Engineer approves them, using a written procedure qualified on mockups and the acceptance criteria the Engineer accepts. Agree it before production testing starts.
Who performs PAUT on our job?
World Steel QC in-house, or the third party you designate. Either way, the procedure, the scan plan and the data delivery are written into the ITP.
Will PAUT replace the code-required UT?
It can be used for it when your Engineer of Record approves it as the method. Where AISC 360 assigns the testing to quality assurance, your QA agency decides how it tests.
Do we receive the scan files?
Yes, when PAUT is specified the encoded data files can be delivered with the report for each weld, together with the details needed to open and read them.
Why is PAUT not used on every weld?
It takes longer to set up and needs more specialized equipment and training, so it earns its place on thick, repeated or critical welds. Conventional UT stays the standard for the rest, and the quote shows which welds get which.
What is TOFD, and is it the same?
Time-of-flight diffraction is another advanced UT technique, often used alongside PAUT for accurate flaw height. It needs its own procedure and approval in the same way.
Ask for PAUT on the welds that matter most
Tell us which welds and what data your reviewer wants. We prepare the procedure for your Engineer’s approval and plan the scans with production.