Ground types
What lies under the site
Your geotechnical engineer confirms the ground for each site.
| Area | Typical ground | What it means for steel |
|---|---|---|
| North coast karst | Limestone with caves and sinkholes | Void checks before foundations, light frames help |
| Coastal plains and bays | Sand, alluvium and fill | Softer site classes, piles or ground improvement |
| Central mountains | Steep clays and weathered rock | Slope checks, stepped bases, landslide review |
| South-west | Faulted ground shaken in 2020 | Ductile frames and careful foundation design |
Seismic frames
How we detail for earthquakes
Moment frames
Special and intermediate moment frames for plants, warehouses and halls.
Braced frames
Concentrically and eccentrically braced frames for hospitals, schools and offices.
AWS D1.8 welding
Qualified procedures and welders for demand-critical welds.
Protected zones
Protected zones marked on members and drawings, on request.
Who does what
Seismic work, split clearly
World Steel supplies
- Frames detailed to AISC 341 where the design calls for it
- Column reactions for the foundation design
- Base plates, anchor bolt plans and templates
- Plate with EN 10204 3.1 certificates and CVN on request
- Remote or in-person inspector access
In Puerto Rico, the contractor and the engineer of record arrange
- Geotechnical investigation and site class
- Seismic design category
- Foundation design and construction
- Special inspections on site
- Erection to the drawings
Products and solutions
The World Steel pages behind this guide
Municipality by municipality
How this applies in your municipality
Puerto Rico has 78 municipalities. Open Toa Alta, Trujillo Alto or Dorado to see the local wind, ground and coast, the road from San Juan and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Puerto Rico project is cut, welded, inspected and packed.
Q&A
What Puerto Rican buyers ask
Which parts of Puerto Rico are most at risk from earthquakes?
The whole island carries seismic loads. The west faces the Mona Passage, the south-west was shaken in 2020 and the north faces the trench. Your engineer sets the values for each site.
Can you build steel on the northern karst?
Yes, once your geotechnical engineer has checked for voids. A light steel frame puts less load on the ground than concrete.
Is your shop qualified for seismic welding?
Yes. We hold AWS D1.8-qualified procedures and welders for demand-critical welds, and our plant is accredited to IAS AC472.
Puerto Rico solutions
Every Puerto Rico guide
Related pages
Code facts on this page summarize practice in Puerto Rico and the standards it references. They are not legal or engineering advice; your engineer of record and OGPe or the municipality confirm the code and edition in force for your project.
Contact World Steel · Puerto Rico
Talk to us about steel for Puerto Rico
WhatsApp, email or a video call with our engineers, booked at an hour that suits San Juan. Our contact page for Puerto Rico has the ports, the local time and the form.