Why it matters
A US code basis, on a seismic hurricane island
Puerto Rico uses the same family of codes as the US mainland, so the design language is familiar to US engineers, owners and lenders. What changes is the site: high design wind speeds, significant seismic design categories across much of the island, karst in the north and flood zones on the coastal plains.
We design to the basis your engineer of record sets and keep it on every sheet: the code edition, the wind speed and risk category, the seismic values and the steel design standards.
Design basis
What the steel design states
The items we confirm with your engineer of record in Puerto Rico before modeling.
| Item | What we state |
|---|---|
| Code | Puerto Rico Building Code 2018 and the referenced editions |
| Wind | Basic wind speed, exposure and risk category to ASCE 7-16 |
| Seismic | Site class, spectral values and seismic design category |
| Flood | Design flood elevation set by your engineer |
| Steel | AISC 360 design, AISC 341 and AWS D1.8 where seismic detailing applies |
Who does what
Permit work, split clearly
World Steel supplies
- Steel design or detailing to the Puerto Rico Building Code
- Calculations and drawings for the engineer of record
- Answers to plan-review comments on the steel in Puerto Rico
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
In Puerto Rico, the contractor and the engineer of record arrange
- The permit with OGPe or the municipality
- Geotechnical report and site class
- Special inspections on site
- Foundations
- Erection
Puerto Rico
What we do not claim
World Steel holds no licence or registration in Puerto Rico and does not seal drawings or apply for permits. The engineer of record approves the design and your team files it.
Products and solutions
The World Steel pages behind this guide
Municipality by municipality
How this applies in your municipality
Puerto Rico has 78 municipalities. Open San Juan, Bayamón or Carolina to see the local wind, ground and coast, the road from San Juan and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Puerto Rico project is cut, welded, inspected and packed.
Q&A
What Puerto Rican buyers ask
Is the Puerto Rico Building Code the same as the IBC?
It is based on the 2018 IBC, with local amendments. Your engineer of record confirms the editions and amendments that apply to your project.
Who issues construction permits in Puerto Rico?
OGPe, the Permits Management Office, or an autonomous municipality with its own permit office. Your team files with the engineer or architect of record.
Do you supply drawings for the permit set?
We supply the steel calculations and drawings your engineer needs. The permit application itself is made by your team.
Puerto Rico solutions
Every Puerto Rico guide
Related pages
Code facts on this page summarize practice in Puerto Rico and the standards it references. They are not legal or engineering advice; your engineer of record and OGPe or the municipality confirm the code and edition in force for your project.
Contact World Steel · Puerto Rico
Talk to us about steel for Puerto Rico
WhatsApp, email or a video call with our engineers, booked at an hour that suits San Juan. Our contact page for Puerto Rico has the ports, the local time and the form.