Anatomy
Six parts of a clear-span gable frame
Every part is welded or cut in our plant and bolted together on site by the US contractor, our customer.
Tapered columns
Narrow at the base plate, deep at the knee, where the frame bends the most.
Knee connection
A bolted end-plate joint that turns column into rafter. Its depth sets much of the frame’s stiffness.
Tapered rafters
Deep at the knee, shallow toward midspan, deeper again where the ridge splice needs it.
Ridge splice
Rafters meet at the ridge with a bolted end-plate splice, placed so each piece fits the trip to site.
Flange braces
Small angles from the purlins steady the inside flange of the frame against buckling under wind uplift.
Base plate
Pinned or fixed, chosen with your foundation engineer, because it changes both frame weight and footing size.
Columns and rafters are web-tapered members welded from plate.
How far it spans
What decides the width of a clear span
We do not promise a span in advance. These are the inputs that settle it for your building.
Roof loads
Snow, rain, collateral loads such as sprinklers and lights, and the ASCE 7 roof live load for your site.
Wind and uplift
Basic wind speed, exposure category and large door openings can reverse the forces in the frame.
Eave height and pitch
A steeper roof or a taller wall changes how the frame carries load and how much it sways.
Deflection limits
How much the roof and walls may move, which can govern before strength does.
Cranes and hung loads
A crane or heavy hung equipment adds loads that a plain warehouse frame does not carry.
Shipping lengths
Rafters are split at bolted splices so every piece fits a container, flat rack or breakbulk slot.
Wide building, tight budget? Compare it with a multi-span frame with one interior column in design optimization.
Where it goes
Buildings that need an open floor
Warehouses and distribution
Racking layouts that can change without moving a column.
Aircraft hangars
Open floor wing tip to wing tip, with the door header designed into the frame.
Arenas and gyms
Courts and seating with clear sightlines.
Showrooms and retail
Open sales floors that can be re-merchandised at will.



Warehouse 36×114 in Thailand (2024): a World Steel building about 36 m (118 ft) wide and 114 m (374 ft) long. See the project
From our company profile
Gable frame - without interior column
- Standard wall peak height: 3 m – 8 m (about 10 ft – 26 ft)
- Standard spacing between rigid frames: 7.5 m – 9 m (about 25 ft – 30 ft)
- Standard roof live load: 0.3 kN/m² (about 6 psf)
Standard values from the profile. Your building is designed for its own size and its US code loads.
Questions
Clear-span frame questions
How wide can a clear-span gable frame be?
There is no single number. Width depends on the roof loads, wind, eave height, roof pitch and deflection limits at your site. We design the frame for your building and tell you early if interior columns would save a meaningful amount of steel.
Is a clear-span frame heavier than a frame with interior columns?
Usually, for the same footprint, because each rafter spans the full width. The cost of the extra steel is weighed against the value of an open floor, and we compare both options in design optimization.
Why are clear-span frames tapered?
Bending in a gable frame is highest at the knees and lowest near midspan. Welding the columns and rafters from plate lets the depth follow that curve, so the frame carries the load with less steel than a constant rolled section.
Are the frame connections bolted or welded on site?
The knee and ridge connections are bolted end-plate joints. The welding is done in our plant, so your erector bolts the frame together without structural field welding.
Can I add a crane to a clear-span building?
Yes, if the crane is part of the design. Runway brackets or separate crane columns are added and the frame is sized for the crane loads. Tell us the crane capacity and class at the start.
Can a clear-span building be extended later?
Yes. An end wall can be designed as a future expansion wall, with frames instead of light end-wall columns, so the building can grow by more bays.
Built for large jobs
Clear-span gable frames for your next large package
Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.
- 5,000 tSunpro Steel Factory
- 2,500 tCPV Food Processing Factory
- 2,000 tLong Son petrochemical complex
- 2,000 tM&D (MD Factory)
Request a quote
Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.
Become our partner in the US
You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.
Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.
Shop drawings, included