One system
Everything in the bay, framed together
Why it pays
Dock trades find the steel ready
Doors line up
Detailed to supplier dimensions.
One system
Doors, framing and canopy together.
Faster fit-out
Dock trades find steel ready.
Built for traffic
A bay that runs all day.
- Framing
- Jambs, headers and wall framing for each door
- Design
- Designed to AISC 360 under the IBC
- Equipment
- Seals, levelers and bumpers by others; steel detailed to their dimensions
- Canopy
- Cantilever canopy steel over the bay
- Work areas
- OSHA rules where they apply
- Supply
- With the building package
How it works
From supplier data to steel
- Supplier dimensionsDoors, seals, levelers.
- Bay detailedWith the wall and canopy.
- FabricatedFraming and canopy steel.
- Shipped markedBy door number.
Where it goes
Buildings with busy docks
Photo
PhotoQuestions
Loading bay questions
Do you supply the dock doors and levelers?
We supply the steel. Doors, seals, levelers and bumpers come from your dock suppliers, and we detail the steel to their dimensions. Overhead doors can also be supplied through partner plants in Vietnam.
When do you need supplier data?
Before shop drawings, so jambs, headers and canopy steel are detailed to the real equipment.
Who installs the dock equipment?
Your door and dock contractors, after your erector installs the framing.
More special building accessories: Steel Canopies · External Stairs · Platforms · Equipment Shelters · Solar Panel Support Structures · Architectural Steel Features · Building Maintenance Access Systems
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Loading Bay Structures
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions