Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Doors & building openings · Sectional overhead doors

The dock door that opens a thousand times a week

A sectional overhead door is a stack of hinged panels that rolls up on tracks and parks under the roof. Panels can be insulated, glazed with vision windows, and sealed at the edges, which makes them the usual choice for heated plants and loading docks. We design the opening and the track supports into the frame and supply the doors through partner plants in Vietnam.

Dock door, panels on tracks
IllustrationSupplied through partner plants in Vietnam.

Track types

Where the door goes when it opens

Standard liftTracks turn flat just above the door. For low eaves.
High liftTracks run up the wall before turning. Keeps the space clear for cranes or lights.
Vertical liftPanels run straight up the wall. For tall buildings with high eaves.

Why it pays

Made for heated buildings and docks

  • Built for docks

    Pairs with levelers and seals.

  • Insulated panels

    Helps keep heated space warm.

  • Vision windows

    See trucks before opening.

  • Tracks supported

    Hangers drawn with the roof steel.

How it is planned

Openings, tracks, doors

  1. Door scheduleSizes, lift type, panel type.
  2. Openings framedJambs, headers, track hangers.
  3. Doors from partnersPartner plants in Vietnam.
  4. One shipmentWith the building steel.

Specification

Sectional doors at a glance

TypeSectional panel doors on tracks, manual or motorized
MakerSupplied through partner plants in Vietnam
PanelsSteel faced, insulated or single skin, vision windows optional
Track supportsHangers and wall framing in our steel design
Wind and thermal valuesOnly from test data for the chosen door, confirmed per project
InstallBy your US contractor, from the maker’s instructions

Where it goes

Docks, bays and plants

Insulated sectional door seen from inside a steel buildingPhoto
Exported steel in place in Japan: a World Steel job abroad, shown for the building type rather than a US site.
Warehouse frame from above, purlins and girts fixed to the rafters and columnsPhoto
Exported steel in place in Thailand: a World Steel job abroad, shown for the building type rather than a US site.

Questions

Overhead door questions

Sectional or roller shutter?

Sectional doors suit heated buildings and docks because the panels can be insulated and sealed. Roller shutters save headroom and suit tough, unheated use. Many buildings use both.

Can the door tracks clear my crane?

Yes, with high-lift or vertical-lift tracks. We place the tracks and hangers on the drawings so they stay out of the crane envelope.

Are the doors wind-rated?

Only where test data for the chosen door shows it, confirmed per project. We do not claim wind ratings in general.

Who installs them?

Your US contractor, from the maker’s instructions. World Steel supplies the doors and frames the openings; it does not erect.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Industrial Overhead Doors

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Insulated sectional door seen from inside a steel building Photo

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.