Anatomy
Four parts that hold a door square
- Head
- Top member over the door
- Jambs
- Side members, prepared for hinges and strike
- Stop
- Pressed lip the door closes against
- Anchors
- Fix the frame to the framed opening
Why it pays
No sagging, no sticking
- Stays squareRigid frame, framed jambs.
- Prepared for hardwareHinges and locks fit first time.
- Trimmed into the wallFlashings around the frame.
- Matched to its doorScheduled and packed together.
How it is planned
Frame and door, one mark
- Door and frame scheduleSize, hand and hardware.
- Jambs framedIn the wall steel design.
- Packed with the doorSame mark on both.
Specification
Door frames at a glance
| Type | Pressed steel frames for walk doors |
|---|---|
| Maker | Supplied through partner plants in Vietnam |
| Preparation | Hinge and strike preps to the hardware schedule |
| Fixing | Anchors to the framed jambs in our wall design |
| Fire label | Only where the chosen frame is listed, confirmed per project |
| Install | By your US contractor |
Photo
PhotoWhere it goes
Wherever people walk in
Questions
Door frame questions
Can I buy frames only, for doors from a US supplier?
Yes, if the frames are prepared to the US door’s hinge and lock positions. Tell us the door maker and hardware and we schedule the frames to suit.
Are the frames fire-labeled?
Only where the chosen frame carries a listing, confirmed per project. We do not claim fire labels in general.
What holds the frame in the wall?
Anchors fix it to steel jambs we frame between the girts, so the frame is not hanging on the wall panels.
More doors and openings: Roller Shutter Doors · Industrial Overhead Doors · Personnel Doors · Access Doors · Windows · Skylights · Opening Reinforcement Steel
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Door Frames
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions