Why taper
What a tapered member gives a large building
Less steel, same frame
The section shrinks as the moment falls. Across dozens of identical frames on a large building, the saving repeats on every one.
Stiff where it counts
Depth at the knee controls sway and deflection, so the frame stiffness lands where serviceability is decided.
More clear height
A shallow column base and slim rafter middle leave more usable height for racking, cranes and aircraft.
Fewer pieces
One tapered member can replace a rolled beam plus a welded haunch, with fewer connections to bolt on site.
Taper forms
Four ways to shape a tapered member
Pick a form to see its profile. Most frames mix them: a tapered column, a haunched knee and a single-taper rafter.
Single taper
Depth changes evenly from one end to the other. The usual form for frame columns and rafter segments.
Double taper
Deep at both ends, shallow in the middle, or the reverse, to follow a moment that changes sign.
Haunched end
A short, deep haunch at the knee or support on an otherwise uniform member.
Tapered with steps
A taper combined with flange thickness changes at shop splices, for long, heavily loaded rafters.
Design
How tapered members are designed and checked
- AISC Design Guide 25
- Frame design using web-tapered members, the reference for how tapered members are analyzed and checked against AISC 360.
- Analysis that sees the taper
- Frames are modeled with the real changing section, not one average size, so forces and drift match the member that gets built.
- Stability at every station
- Local buckling and lateral-torsional buckling are checked along the member, because the section that governs moves with the taper.
- Flange bracing
- Inner-flange braces to the purlins or girts are placed by design and their holes drilled in the shop.
- Web slope limits
- The slope of the web is kept within the range the design method covers; steeper changes are split into segments.
- Seismic frames
- Where the frame resists seismic load, AISC 341 detailing and AWS D1.8 welding apply as your Engineer of Record sets.
In our plant
How a tapered member is made
Web cut to the slope
The tapered web profile comes straight from the model and is cut on CNC laser, plasma or gas machines, steel up to 100 mm (about 4 in) on the laser.
Flanges follow the edge
Flange plates are set along the sloped web edge in the jigs and tacked to the shop drawing.
Submerged arc welded
Web-to-flange fillets are run by submerged arc on the automated line or the gantry welder.
End plates square to the frame
End plates are welded at the angle the frame geometry needs, then drilled for the bolted knee or ridge joint.



Questions
Tapered member questions
How much steel does a tapered member save?
It depends on the span, the loads and the bay spacing, so we do not quote a fixed percentage. Our engineers model your frame both ways when you ask, and show the tonnage of each option to your Engineer of Record.
Which design method do you use for tapered members?
AISC 360, following the approach in AISC Design Guide 25 for frames with web-tapered members, with loads from ASCE 7 at the edition your jurisdiction has adopted.
Can tapered members be used in a seismic force-resisting frame?
Yes, where your Engineer of Record designs the frame that way. AISC 341 detailing and AWS D1.8 welding are then applied to the members and welds the design names.
Can only the rafter be tapered, with a straight column?
Yes. Columns and rafters are each tapered, uniform or haunched to suit the frame, and the mix is set during design.
How long can a tapered segment be?
Segment length is set by the frame geometry and the container or flat rack it ships in. Segments meet at bolted end-plate splices drilled in the shop.
Built for large jobs
Tapered members for your next large package
Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.
- 5,000 tSunpro Steel Factory
- 2,500 tCPV Food Processing Factory
- 2,000 tLong Son petrochemical complex
- 2,000 tM&D (MD Factory)
Request a quote
Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.
Become our partner in the US
You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.
Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.
Shop drawings, included