Food and beverage
Insulated panels, condensation control and room for refrigeration plant on the roof. Part of the building may become a cooler later, so the roof is designed for the extra load.
One building, many tenants
Pick a tenant type. The frame we design for a 3PL building already allows for the most common ones.
Insulated panels, condensation control and room for refrigeration plant on the roof. Part of the building may become a cooler later, so the roof is designed for the extra load.
Mezzanine pick modules and conveyors hung from the roof. The roof steel has to carry those collateral loads, so they are agreed before design.
Many doors on both long walls and wide speed bays for fast cross-docking. Canopies over the doors keep freight dry.
Heavier floor loads, wider aisles and sometimes a crane bay. A crane runway can be designed into one end of the building from day one.
Built to be re-let
Each costs little when it is designed in, and a lot when it is added later. Tell us which ones the owner wants before the frame is sized.
Column lines are placed so the building can be split for two or three tenants, with demising walls framed between them.
One end wall is designed to come off: its columns and girts are sized so the building can grow by more bays later without rebuilding the frame.
Two-story office and amenity pods are framed at the building corners so each tenant gets an entrance.
Where the owner plans rooftop solar, the extra roof load is carried in the purlins and frames from the start.
NYT Warehouse, New York: 230 t of our framing
A clear-span warehouse in New York. Site photos show the rafters lifted into place frame by frame, from one end of the building to the other.
See the project
Photo
Photo
Photo
Photo
Scope, in writing
World Steel, our plant in Vietnam
The US contractor, our customer
Questions from US contractors
7 answers, grouped by topic.
Most modern bulk buildings are built at 9.8 to 12.2 m (32 to 40 ft) clear. The right number depends on the racking your likely tenants use and the sprinklers they need, so we start from that and design the frame to suit.
Because racks, pick modules and demising walls all have to fit between the columns. A grid that suits several tenant layouts keeps the building easy to re-let.
Yes, if it is planned. We design one end wall for removal, so more bays can be added later with the same frame and roof.
Yes. Demising lines are set on column lines, with walls framed between tenants and separate dock doors and offices for each.
Yes, when the owner tells us before design. The extra load is carried in the purlins and frames from the start.
Yes. The NYT Warehouse in New York used 230 t of World Steel framing, and we have supplied other US warehouses such as Addario and UR Warehouse 2.
Yes. The plant fabricates 2,500 t of structural steel a month, so several buildings can be supplied as one program with a shipping sequence per building.
Keep reading
Price it or partner with us
Share the site plan, the building sizes and the spec the developer is marketing. We will design a frame that fits it and price the steel building by building.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Tell us about the building
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833