Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Third-party logistics (3PL) warehouses

3PL warehouses built for this client and the next one

A 3PL building changes clients every few years: food today, auto parts or e-commerce tomorrow. The frame should not stand in the way. We design flexible bulk buildings for the developers and contractors who build them, in a plant that fabricates 2,500 t of structural steel a month, so a multi-building park is one supply program.

Aerial view of a long white-roofed steel warehouse framed by World Steel

Building spec sheet TYPICAL

Clear height
9.8 to 12.2 m (32 to 40 ft)
Column grid
About 15 × 17 m (50 × 56 ft)
Speed bay at the docks
About 18 m (60 ft) deep
Dock doors
About one per 1,000 m² (10,000 sq ft)
Roof
Standing seam over a low-slope frame
Design basis
IBC 2024 · ASCE 7-22 · AISC 360

Typical ranges, not design values.

Large-project capacity

A logistics park is a tonnage job. We are built for it.

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.

2,500 metric tons a month

One building, many tenants

What changes in the steel when the tenant changes

Pick a tenant type. The frame we design for a 3PL building already allows for the most common ones.

Food and beverage

Insulated panels, condensation control and room for refrigeration plant on the roof. Part of the building may become a cooler later, so the roof is designed for the extra load.

Cold storage buildings

E-commerce

Mezzanine pick modules and conveyors hung from the roof. The roof steel has to carry those collateral loads, so they are agreed before design.

E-commerce fulfillment centers

Retail replenishment

Many doors on both long walls and wide speed bays for fast cross-docking. Canopies over the doors keep freight dry.

Cross-dock logistics buildings

Industrial parts and equipment

Heavier floor loads, wider aisles and sometimes a crane bay. A crane runway can be designed into one end of the building from day one.

Crane support system

Built to be re-let

Four provisions that keep a 3PL building easy to lease

Each costs little when it is designed in, and a lot when it is added later. Tell us which ones the owner wants before the frame is sized.

Demising lines in the grid

Column lines are placed so the building can be split for two or three tenants, with demising walls framed between them.

An expansion end wall

One end wall is designed to come off: its columns and girts are sized so the building can grow by more bays later without rebuilding the frame.

Office pods at the corners

Two-story office and amenity pods are framed at the building corners so each tenant gets an entrance.

A roof ready for solar

Where the owner plans rooftop solar, the extra roof load is carried in the purlins and frames from the start.

NYT Warehouse, New York: 230 t of our framing

A clear-span warehouse in New York. Site photos show the rafters lifted into place frame by frame, from one end of the building to the other.

See the project
Crane lifting a clear-span rafter at the NYT Warehouse in New York Photo
Multi-story logistics warehouse in an industrial park in Vietnam Photo
Empty clear-span interior of a 50 by 140 meter steel warehouse Photo
Aerial view of a warehouse park with several steel buildings Photo

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • A flexible frame designed to the developer’s spec and the code editions in the contract
  • Demising, expansion and solar-ready provisions designed in from the start
  • Shop and erection drawings at no extra cost, ready for your Engineer of Record
  • Fabrication in our IAS AC472-accredited plant in Vietnam, tracked live in PEB Studio

The US contractor, our customer

  • Drawing approval, the PE seal and the permit with your Engineer of Record
  • Slab, paving, truck courts and site utilities
  • Erection, dock equipment and sprinklers
  • Tenant fit-out and leasing

Questions from US contractors

3PL warehouse steel: questions and answers

7 answers, grouped by topic.

Spec 2 answers

What clear height should a 3PL warehouse have?

Most modern bulk buildings are built at 9.8 to 12.2 m (32 to 40 ft) clear. The right number depends on the racking your likely tenants use and the sprinklers they need, so we start from that and design the frame to suit.

Why does the column grid matter so much for a 3PL building?

Because racks, pick modules and demising walls all have to fit between the columns. A grid that suits several tenant layouts keeps the building easy to re-let.

Flexibility 3 answers

Can the building be expanded later?

Yes, if it is planned. We design one end wall for removal, so more bays can be added later with the same frame and roof.

Can one building be split between tenants?

Yes. Demising lines are set on column lines, with walls framed between tenants and separate dock doors and offices for each.

Can the roof take solar panels later?

Yes, when the owner tells us before design. The extra load is carried in the purlins and frames from the start.

Scale and references 2 answers

Have you supplied warehouses in the United States?

Yes. The NYT Warehouse in New York used 230 t of World Steel framing, and we have supplied other US warehouses such as Addario and UR Warehouse 2.

Can you supply a whole logistics park?

Yes. The plant fabricates 2,500 t of structural steel a month, so several buildings can be supplied as one program with a shipping sequence per building.

Keep reading

Related pages

Price it or partner with us

Send the park plan and the target spec.

Share the site plan, the building sizes and the spec the developer is marketing. We will design a frame that fits it and price the steel building by building.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Tell us about the building

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details