Large-project capacity
Peak-season buildings need a fabricator with capacity to spare
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
5,000 t
Sunpro Steel Factory
Can Tho City, Vietnam · 2024
2,500 t
CPV Food Processing Factory
Dong Nai Province, Vietnam · 2020
2,000 t
Long Son petrochemical
Ba Ria–Vung Tau, Vietnam · 2022
2,000 t
M&D warehouse, Thailand
Thailand · 2024
1,500 t
Tongwei feed factory, phase 1
Dong Thap Province, Vietnam · 2018
1,000 t
New Era cold storage, phase 1
Tay Ninh Province, Vietnam
Follow one order
Six stations a parcel passes, and what the steel does at each
Swipe along the track. Each station loads the building in its own way.
-
Receive
Inbound doors on one wall, each with a framed opening and a canopy cantilevered from the columns.
Loading dock canopies → -
Store
Reserve racking in the tall part of the building, with column lines placed in the rack flue spaces.
High-bay storage → -
Pick
Pick modules of two to four levels, framed as steel mezzanines with stairs, guards and conveyor openings.
Steel mezzanine frames → -
Pack
Pack stations on an open floor or a mezzanine, with conveyor and lighting hung from the roof above.
Flooring and mezzanine systems → -
Sort
Sorters run on platforms or hang from the roof. Their weight and vibration are agreed with the system supplier.
Equipment platforms → -
Ship
Outbound doors along a long wall, sometimes with a second canopy line for parcel vans.
Cross-dock logistics buildings →
Collateral load register
Everything that leans on the steel, and who gives us the number
Most late changes in a fulfillment center come from automation loads nobody passed to the steel designer. We ask for these before the frame is sized.
| Item | Where it bears | Who gives us the load |
|---|---|---|
| Conveyor hung from the roof | Roof purlins and frames, at hanger points | Material handling supplier |
| Sorter on a platform | Platform steel and its columns | Material handling supplier |
| Pick module, two to four levels | Mezzanine frame, its own columns to the slab | Pick module layout and your Engineer of Record |
| Sprinkler mains and lighting | Roof steel | Fire protection and electrical engineers |
| Rooftop HVAC and solar | Roof frames and dunnage | Mechanical engineer and the owner |
| Mobile robots | The floor slab, not the steel frame | Slab designer and the robot supplier |
From our project files
M&D warehouse: about 2,000 t in one order
A large warehouse in Thailand, framed bay by bay with World Steel steel fabricated in Vietnam. It is the scale a regional fulfillment center reaches, and the plant supplied it while running other jobs.
See the M&D project
Photo
Photo
Photo
Photo
Scope, in writing
What we supply and what stays with your team
World Steel, our plant in Vietnam
- Frame, roof and mezzanine steel designed with the collateral loads of your automation
- Pick-module mezzanines, stairs, guards and platforms in the same package
- Shop and erection drawings at no extra cost, ready for your Engineer of Record
- Fabrication in our IAS AC472-accredited plant in Vietnam, tracked live in PEB Studio
The US contractor, our customer
- Drawing approval, the PE seal and the permit with your Engineer of Record
- Material handling design and installation with the system supplier
- Floor slab, flatness and robot paths
- Erection, doors, sprinklers and fit-out
Questions from US contractors
Fulfillment center steel: questions and answers
6 answers, grouped by topic.
Automation loads 3 answers
Can the roof carry conveyors and sorters?
Yes, when the loads are known before design. The material handling supplier gives the hanger points and weights, and the roof purlins and frames are sized for them.
What happens if the automation layout changes after design?
Tell us before fabrication. Hanger points and mezzanine columns change the frame, so a late change is checked by design before members are cut.
Do you design for mobile robots?
Robots run on the floor slab, which is designed by others. The steel frame stays out of their paths: we place columns from the layout your supplier gives.
Pick modules and mezzanines 2 answers
Can you supply multi-level pick modules?
Yes. Pick modules of two to four levels are framed as steel mezzanines, with stairs, guards and conveyor openings detailed with the main building.
Which codes do you design fulfillment centers to?
To the editions in the contract, typically IBC 2024, ASCE 7-22 and AISC 360. Approval and the PE seal stay with your Engineer of Record.
Scale 1 answer
How big a fulfillment center can you supply?
The plant fabricates 2,500 t of structural steel a month. The M&D warehouse in Thailand took about 2,000 t in one order, frames erected bay by bay.
Keep reading
Related pages
Price it or partner with us
Send the layout with the automation on it.
Share the building plan and the material handling layout. We will carry the automation loads in the frame and price the steel.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Tell us about the building
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833