Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Truck terminals

Truck terminals: a dock building, a shop and a yard that never stop

A freight terminal is a campus: a long dock building with doors on both walls, a maintenance shop, a wash bay, fuel canopies and a driver center. We supply the steel for all of them from one plant that fabricates 2,500 t of structural steel a month, so carriers and their contractors deal with one fabricator for the whole site.

The engineering problem

A wall made of doors still has to stand up to the wind

No room for X-bracing

Most steel buildings brace their long walls with diagonal rods. A terminal wall is nearly all doors, so the bracing has nowhere to go.

Rigid frames carry the wind instead

We brace the door walls with portal frames or moment-connected bays between doors, and check drift so the doors still open and seal.

Canopies that cantilever

Continuous canopies hang off the columns over every door, so the trailer and the dock stay dry without extra posts in the truck court.

CROSS-DOCK FLOOR · NO COLUMNS RED: CONTINUOUS CANOPIES · YELLOW: DOORS

The whole campus

Five buildings on a terminal, five different steel jobs

Cross-dock building

LTL terminals are long and narrow, typically 24 to 36 m (80 to 120 ft) wide, with a door every few meters on both walls. Freight crosses the floor in minutes, so columns stay out of the way.

We supply: Clear-span frames, door-wall bracing solved with rigid frames, continuous canopies on both walls

Cross-dock logistics buildings →Loading dock canopies →

Maintenance shop

Tractors and trailers need tall drive-through bays, pits, lube lines, exhaust extraction and sometimes a crane for engines and axles.

We supply: Tall clear-span bays, crane runways where needed, framing for exhaust and service lines, a mezzanine for parts

Workshop buildings with office →Crane runway beams →

Wash bay

Hot water, detergents and road salt make a wash bay one of the harshest places for steel on the site.

We supply: Hot-dip galvanized or duplex-coated framing, connections detailed to drain, sealed wall panels

Hot-dip galvanizing →Corrosion protection system →

Fuel and inspection canopies

A canopy is a light roof on a few columns, so wind uplift and the column base govern. Columns near traffic need protection your designer specifies.

We supply: Canopy frames with base plates and anchor bolt plans, galvanized or painted

Steel canopies →Carport and canopy structures →

Driver center and dispatch

Dispatch, driver lounges and offices often sit in a two-story building at the gate or at the end of the dock building.

We supply: Braced two-story framing, stairs and guards, framed openings for a dispatch window onto the yard

Multi-story steel framing →Stairs →

Steel frame of the Addario warehouse in the United States in winter Photo
Multi-span steel warehouse frames at sunrise Photo
Wide steel frame of a logistics building in the Philippines with vehicles in front Photo
Steel frame of a vehicle warehouse with cars parked in the yard Photo

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Steel for every building on the terminal campus, designed to the contract documents
  • Door-wall bracing and continuous canopies designed with the main frame
  • Shop and erection drawings at no extra cost, ready for your Engineer of Record
  • Fabrication in our IAS AC472-accredited plant in Vietnam, one shipping sequence per building

The US contractor, our customer

  • Drawing approval, the PE seal and the permit with your Engineer of Record
  • Paving, pits, fuel systems and environmental permits
  • Erection, dock equipment, doors and site utilities
  • Column protection and traffic layout in the yard

Questions from US contractors

Truck terminal steel: questions and answers

6 answers, grouped by topic.

Dock buildings 2 answers

How do you brace a terminal wall that is almost all doors?

With rigid frames or moment-connected bays between the doors instead of diagonal rods. Drift is checked so the doors still work and the dock seals stay tight.

How wide is a typical LTL cross-dock building?

Often 24 to 36 m (80 to 120 ft), so freight crosses the floor quickly. Length follows the number of doors. These are typical ranges, not design values.

Shops and wash bays 3 answers

Can the maintenance shop have a crane?

Yes. A crane runway is designed with the shop frame from the crane maker’s data, and shown on the same drawings.

How do you protect steel in a truck wash bay?

Usually hot-dip galvanizing or a duplex coating, with connections detailed so water drains away. The system is chosen for the exposure and agreed with the owner.

Do you design fuel canopies?

We design and fabricate the canopy steel. Fuel systems, fire protection and their permits stay with the owner’s specialists.

Whole-site supply 1 answer

Can you supply every building on a terminal campus?

Yes. The plant fabricates 2,500 t of structural steel a month, so the dock building, shop, wash bay and canopies can ship as one program, each in its own erection sequence.

Keep reading

Related pages

Price it or partner with us

Send the terminal site plan.

Share the door count, the shop bays and the canopies on the plan. We will price the steel for every building on the yard, each with its own shipping sequence.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Tell us about the building

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details