Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Long shop floor of built-up members, overhead cranes and a center walkway

One of the World Steel fabrication halls in Vietnam where US orders are built.

Part of Warehousing & Logistics

Freezers · Coolers · Food and pharma distribution

Cold Storage

Refrigerated and freezer warehouses for food distribution.

Envelope
Insulated metal panels with a continuous vapor line
Thermal
Breaks wherever steel crosses the insulation
Plant
Roof dunnage for condensers and evaporators
Design basis
IBC 2024 · ASCE 7-22 · IECC
Typical sectionIllustrative
Illustrative section of a cold storage steel buildingSpan 30 m (98 ft)Insulated metal panelsThermal breaks at the frameCondenser dunnageVapor control

Illustrative cold storage section, not a design. Temperatures and refrigeration are set by your designers.

The envelope does the work

Cold storage is a box of layers, and every layer is steel’s business

A cold room only performs if the frame, the panels and every penetration are planned together. We supply them as one coordinated package from our Vietnam plant.

  1. Exterior skin

    Roof and wall sheets chosen for the climate outside, with trims that shed water away from panel joints.

  2. Insulated core

    Insulated metal panels sized to the room temperature your refrigeration designer specifies.

  3. Vapor control

    A continuous vapor retarder on the warm side keeps moisture out of the insulation and ice off the steel.

  4. Thermal breaks

    Isolators at every place the frame passes through the envelope stop frost lines and condensation drips.

  5. Primary frame

    Columns and rafters carry the panels, the rooftop plant and ceiling-hung evaporators in one load path.

In the US market

Grocery distribution, meal-kit and pharmaceutical supply chains all need more refrigerated and frozen space close to customers. Cold storage is among the most demanding building types a metal building system can serve.

What the building needs

An insulated envelope with a continuous vapor retarder, thermal breaks wherever steel crosses the insulation, framing for refrigeration units and rooftop condensers, and attention to fire protection for insulated panels, which your fire protection engineer confirms.

How World Steel helps

We supply the frame, insulated metal panels and refrigeration supports as one coordinated package. The refrigeration system is designed to your temperature requirements and installed by a specialist refrigeration contractor.

Engineering

Engineered for US codes, your site and this use

Our engineers design to the code edition your jurisdiction has adopted, and deliver calculations and drawings ready for your Engineer of Record to review and approve.

Solutions · End to end

From our plant in Vietnam to your site in the US

One partner carries your cold storage building from the first calculation to the last container. Westminster, California is our US office; every member is made in Vietnam.

  1. Engineered to US codes

    Designed to IBC 2024 and ASCE 7-22, with drawings ready for your engineer’s review and approval.

    Steel building design →
  2. Made in our Vietnam plant

    Cut, welded and coated in World Steel’s own IAS AC472-accredited plant, from steel rolled mainly in Vietnam and ordered to US grades.

    Inside the plant →
  3. Tracked live in PEB Studio

    Watch each of your members move through fabrication and QC release, in real time.

    PEB Studio →
  4. Shipped to a US port

    Packed by erection sequence and shipped to West, Gulf or East Coast ports, then trucked to site.

    Vietnam to USA →
  5. Erected by your team

    Piece marks, erection drawings and packing lists let your erector start straight away.

    How we work →

PEB Studio

Watch your building being made, in real time

Log in to PEB Studio and follow every column, rafter and purlin of your project through cutting, welding, coating and QC release at our Vietnam plant. Your team plans erection around real progress, not promises.

PEB Studio production dashboard with fabrication progress by stage (demonstration data) Demonstration data
Live production status

The Cold Storage ecosystem

Everything that connects to your building

Products you can buy, solutions that deliver them, the states we ship to and the people we work with. Each link opens its own page.

State guides

Where US warehousing & logistics projects are growing

Texas Distribution along I-35 and I-10 Big-box and mid-bay distribution buildings around Dallas–Fort Worth, Austin, San Antonio and Houston need clear spans, dock doors and room to expand. Florida Distribution for a growing population Central Florida and the I-4 corridor keep adding distribution and last-mile space that needs clear spans and many dock doors. California Inland Empire and Central Valley logistics Distribution space east of Los Angeles and along the Central Valley needs clear spans and seismic-ready frames. Georgia Port-linked distribution Import distribution centers around Savannah and Atlanta need large clear spans and expandable end walls. North Carolina Distribution I-85 and I-40 corridors support regional distribution with mid-size warehouses. Arizona Phoenix logistics Distribution space in the West Valley serves the Southwest and Southern California. Ohio Logistics hubs Columbus and Cincinnati are freight hubs with constant demand for distribution space. Washington Port logistics Kent Valley and Tacoma distribution serves trans-Pacific trade. Hawaii Warehousing on Oahu Storage near Honolulu supports an economy that imports most goods. Alabama Port and I-65 distribution Warehouses near the Port of Mobile and along the I-65 corridor serve import cargo and plants further north. Alaska Seafood processing and cold storage Coastal processing plants need washable interiors, cold rooms and frames that resist salt air. Arkansas Retail and supplier logistics Vendors that serve the large retailers headquartered in Northwest Arkansas need distribution space close to Bentonville and Springdale. Colorado Denver-area distribution Warehouses near Denver International Airport and along I-25 and I-70 serve the Rocky Mountain region. Connecticut I-84 and I-91 distribution Distribution buildings between New York and Boston serve the dense Northeast market. Delaware I-95 and port warehousing New Castle County distribution buildings serve Philadelphia, Baltimore and the port. Idaho Treasure Valley logistics Growth around Boise, Nampa and Caldwell brings distribution and flex buildings. Illinois Chicagoland and I-55 logistics Distribution buildings near the intermodal yards of Will County and along I-55 and I-80 serve the whole Midwest. Indiana Indianapolis-area distribution Plainfield, Whitestown and Greenwood host large distribution parks along I-65, I-70 and I-74. Kansas Kansas City logistics Distribution parks around Edgerton and Lenexa serve the national rail and interstate network. Kentucky Air cargo and logistics Logistics parks near the Louisville and Northern Kentucky air hubs need large, fast-built warehouses. Maine Seafood and potatoes Lobster and seafood processors and Aroostook County potato growers need cold rooms and storage buildings. Maryland Port and I-95 logistics Distribution and port-related buildings around Baltimore serve the Washington–Baltimore market. Massachusetts I-495 logistics Distribution buildings along I-495 and I-90 serve Greater Boston and New England. Michigan Detroit-area logistics Distribution buildings near the Canadian border crossings serve cross-border trade. Minnesota Food processing and cold storage Packing plants, dairies and cold stores across southern Minnesota need insulated, washable buildings. Missouri Kansas City and St. Louis logistics Distribution parks near the rail yards and interstates serve the whole middle of the country. Nebraska Rail and interstate logistics Distribution along I-80 serves the rail and trucking corridor across the state. Nevada Reno and Las Vegas distribution Large distribution parks serve California and the Mountain West from Nevada. New Hampshire Southern New Hampshire distribution Warehouses near the Massachusetts line serve Greater Boston without the Massachusetts costs. New Jersey Turnpike logistics Warehouses from Exit 8A to the port serve the New York metro area and the Northeast. New Mexico Film stages and logistics Albuquerque and Santa Fe film studios and distribution buildings use tall, clear-span steel. New York Metro and Hudson Valley logistics Warehouses in the Hudson Valley, Long Island and the Capital Region serve the largest US metro market. Pennsylvania Lehigh Valley and I-81 logistics Distribution buildings in the Lehigh Valley and along I-81 and I-78 serve the whole Northeast. South Carolina Port and inland port logistics Distribution buildings near Charleston and Greer serve import cargo and plant supply. South Dakota Sioux Falls distribution Warehouses along I-29 and I-90 serve the northern plains. Tennessee Memphis and Nashville logistics Distribution parks around Memphis and along I-24 and I-40 serve much of the country overnight. Utah Inland port distribution Warehouses west of Salt Lake City and in Utah County serve the Mountain West. Virginia Hampton Roads logistics Distribution buildings near the Port of Virginia serve the East Coast and Midwest by rail. West Virginia Eastern Panhandle logistics Distribution buildings near the I-81 corridor serve the Washington–Baltimore market. Wisconsin Dairy and cheese Dairy farms, cheese plants and cold stores need barns, processing buildings and coolers.

Projects

Similar buildings we have fabricated

Comparable building types from our portfolio, with US work, including the US territory of Guam, shown first.

All projects →

Questions and answers

Cold Storage: what US contractors ask us

16 straight answers on design, fabrication in our Vietnam plant, shipping and who does what on your project.

Designing the cold box 4 answers

How do you stop condensation where the frame meets the cold room?

Thermal breaks are detailed at every point where steel crosses the insulation, and the vapor retarder is kept continuous on the warm side. Both are shown on the shop drawings for your engineer to review.

Is the frame inside or outside the insulated envelope?

Either can work. Many freezers keep the primary frame on the warm side so the steel stays dry; others put it inside the box for a cleaner exterior. We model the option your refrigeration designer and Engineer of Record choose and detail the penetrations for it.

Can the building handle a freezer and a cooler under one roof?

Yes. Rooms at different temperatures are separated by insulated partitions, and the frame is detailed so each room keeps its own vapor line and thermal breaks where steel passes between zones.

Do you account for floor heating and frost heave?

Underfloor heating and slab design belong to your civil and refrigeration engineers. We coordinate column base plates and anchor bolt locations with their slab details so the steel lands where the floor design expects it.

Panels and plant support 4 answers

Which insulated panel thickness do you supply?

The thickness follows the room temperature and energy target your refrigeration designer sets. We supply insulated metal panels to that specification, with trims and joints detailed for an airtight, vapor-tight envelope.

Can the roof carry condensers?

Yes, when the equipment weights and positions are known early. Dunnage frames are then designed with the main frame and arrive drilled to match.

Can evaporators hang from the roof steel?

Yes. Hanger points for evaporators, piping and rails are added to the analysis model, so the roof framing carries them in a clear load path instead of relying on field-added clips.

What about insulated dock doors and vestibules?

We frame the openings, vestibules and dock canopies. Insulated doors, seals and air curtains are supplied by their own manufacturers, whose loads and sizes we design the framing around.

Fabrication and delivery 4 answers

Have you supplied large cold storage projects?

Yes. Phase 1 of the New Era cold storage project alone took about 1,000 metric tons (1,102 short tons) of World Steel structural steel, and the plant fabricates up to 2,500 metric tons a month for larger distribution campuses.

How are insulated panels protected in shipping?

Panels are packed in protected bundles with edge guards and labels by elevation, loaded so they are not crushed under steel, and listed by container on the packing list so your crew finds them quickly.

Which records prove the steel quality?

Mill certificates traced to heat numbers, weld and coating inspection results and a Manufacturing Data Record. World Steel holds IAS AC472 accreditation, audited twice a year since 2019.

Can we follow production while the slab is poured?

Yes. PEB Studio shows every member’s status in our Vietnam plant in real time, so your team can plan steel delivery around slab curing and refrigeration rough-in.

Scope and responsibilities 4 answers

Do you supply the refrigeration system?

No. We supply the frame, insulated panels and refrigeration support steel. The refrigeration system is designed to your temperatures and installed by a specialist contractor.

Who installs the panels and the frame?

The US contractor, our customer, or the erector they hire. World Steel designs, fabricates and supplies; erection drawings, panel layouts and piece marks guide the crew on site.

Who approves the design for the permit?

Your Engineer of Record reviews and approves our calculations and drawings, and the PE seal and permit stay with the US project team. We answer plan-review comments through your engineer.

What does a cold storage proposal need from us?

Room sizes and temperatures, clear heights, door and dock counts, rooftop equipment weights and the site address. Your refrigeration designer’s concept helps us size support steel early.

Ready to scope your cold storage project?

Send a footprint, a sketch or a full drawing set. An engineer checks it against US code requirements and replies with exactly what World Steel would make in Vietnam and ship to your port.