Why choose it
Simple, quick and economical
Lowest roof cost per area
Simple panels and fasteners keep material and labor down.
Familiar to every crew
US roofing crews know the system and install it quickly.
Fastening from the wind map
Screw spacing is tightened where uplift peaks.
Easy to maintain
Any fastener can be checked or replaced from the roof.
How we detail it
Fasteners placed by the wind map
- Uplift zonesEdge, corner and field zones from ASCE 7-22.
- Fastener layoutPattern and spacing shown on the roof drawings.
- Panels and trims formedRoll-formed to length with matching trims.
- Fasteners boxed by areaCounted and labeled so nothing runs short on site.
Specification
What is in the package
| Panel | Ribbed steel panel, zinc or zinc-aluminum coated and factory painted |
|---|---|
| Fasteners | Self-drilling screws with bonded sealing washers; coated or stainless for corrosive sites |
| Spacing | Set from uplift pressures, tighter at edges and corners |
| Laps | Side laps stitched; end laps with sealant tape where slope requires |
| Best for | Sheds, shops, agricultural and many warehouse roofs at normal slopes |
| Code basis | IBC Chapter 15 and ASCE 7-22 pressures, reviewed by your Engineer of Record |
Photo
Photo
PhotoWhere it goes
Buildings that suit a through-fastened roof
Questions
Through-fastened roof questions
Does a through-fastened roof leak?
Leaks come from wrong fasteners, overdriven washers or missing lap sealant, not from the system itself. We specify the fastener, spacing and lap details, and your installer follows the roof drawings.
When should I choose standing seam instead?
For very low slopes, long panel runs where thermal movement adds up, or buildings where the owner wants no exposed fasteners. We can price both.
What fasteners do you supply for coastal sites?
Fasteners with heavier coatings or stainless steel, matched to the panel coating so they do not corrode each other.
Is the roof included with the steel frame?
Yes, if you want it. Panels, trims, closures and fasteners can ship in the same package as the frame.
More roofing: Metal Roof Panels · Standing Seam Roofing · Insulated Roof Panels · Roof Insulation · Ridge Caps · Roof Flashings · Roof Ventilators · Roof Access Components
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Through-Fastened Roofing
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Photo
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions