Mezzanines & floor systems · Mezzanine frames

Double the floor without a bigger footprint

Most single-story steel buildings have more height than they use. A steel mezzanine turns that air into floor: a frame of beams and columns carrying a deck or grating, with stairs and guards, for storage, offices or equipment. We design it for your floor loads, fabricate it in our plant and ship it bolted-ready, with the building or into one you already have.

Building section with a steel mezzanine at mid height: storage racks below, offices above, a stair between Offices or storage aboveStair
IllustrationFree-standing mezzanine with its own columns.
  • Floor area addedUp to the whole footprint, column grid permitting
  • LoadsStorage, office or equipment, from ASCE 7-22 and the IBC
  • Field workBolted connections; welding done in our shop

Why it pays

Use the height you already have

  • More floor, same roof

    Use the height you already paid for.

  • Grid that suits you

    Columns placed around racks and aisles.

  • Bolted on site

    Shop-welded, field-bolted.

  • With the building

    Or on its own for an existing one.

How it is delivered

From loads to bolted floor

  1. Use and loadsStorage, office or equipment.
  2. Grid and framingColumns, beams, deck span.
  3. FabricatedIn our IAS AC472 accredited plant.
  4. Shipped by levelMarked and bundled for erection.

Specification

Mezzanine frames at a glance

Members
Hot-rolled or built-up beams and columns
Floor
Metal deck with concrete, deck boards or grating, per use
Design
Live loads from ASCE 7-22 and the IBC; steel designed to AISC 360
Stairs and guards
Designed to the IBC or OSHA 1910 Subpart D, whichever applies
Finish
Shop paint for dry interiors; galvanizing where wet or outdoors
Approval
Drawings reviewed by the US contractor and their Engineer of Record
Rows of columns, rafters and purlins inside a large steel buildingPhoto
Long warehouse frame running beside a roadPhoto

Questions

Mezzanine questions

Can you add a mezzanine to my existing building?

Yes. We design a free-standing mezzanine with its own columns and footings, so it does not load the existing frame unless your engineer checks it. Your contractor confirms the slab and footings.

What floor load should I design for?

It depends on the use: storage, office or equipment. Live loads come from ASCE 7-22 and the IBC; your designer confirms them with you.

Do mezzanines need permits?

Usually, yes. Your contractor and their Engineer of Record handle the permit and approve the drawings; we supply the design calculations and shop drawings.

Do you install it?

No. World Steel designs, fabricates and supplies. Your US contractor erects it with bolted connections.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Steel Mezzanine Frames

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Metal floor deck laid on each level of a steel-framed building Photo

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.