Your matched steel package
Warehousing & Logistics
Treat these as a first pass pulled from our reviewed engineering content. Your Engineer of Record confirms the structural design, and your local building department decides on code compliance and the permit.
Framing approaches to consider
- Clear-span steel warehouses
- High-bay frames for tall racking
- Pick-module and office mezzanines
- Standing seam and through-fastened roofs
Points your engineer will check
Column spacing, clear height and slab layout are agreed with the racking designer and your fire protection engineer before the frame is sized.
From: Warehousing & Logistics
Each dock and drive-in door gets its own framed opening, and wall bracing moves to solid bays.
From: Warehousing & Logistics
Snow drift against parapets and higher roofs, and ponding on low-slope roofs, are checked under ASCE 7.
From: Warehousing & Logistics
Components to include
Coating and corrosion options
Systems in scope
Services that apply
Guides to read next
Comparable buildings
What happens next
- Share drawings, a sketch or simply the footprint and ZIP code.
- We agree the design loads with your Engineer of Record and draft a package scope.
- You get a written proposal listing what is in, what is out and the Incoterm.