Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Roofing system · Standing seam

A roof with no screw holes in the weather surface

Standing seam panels lock together at raised side seams and hold to the purlins with concealed clips. The panel floats on those clips as the roof heats and cools, so there are no exposed fasteners to work loose, back out or leak over the life of the building.

Exploded view of a standing seam roof: panel, concealed clip, insulation and purlin
  • Standing seam panelPainted zinc or zinc-aluminum coated steel, seamed at the side laps
  • Concealed clipHolds the panel down and lets it slide as it expands
  • InsulationFaced blanket or rigid board to your energy code
  • PurlinZ or C purlin spaced for your uplift pressures
IllustrationLayers vary with your energy code and uplift design.
  • Fewer leak paths

    Seams stand above the water line and no screws pierce the weather surface.

  • Built for thermal movement

    Sliding clips let long panels grow and shrink without tearing at fasteners.

  • Uplift you can document

    Clip spacing follows tested assemblies, tightened at edges and corners where pressures peak.

  • Low slopes, long runs

    Raised seams shed water on the low slopes large warehouses and plants use.

Engineer’s checklist

What we settle before a single panel is formed

  • Roof slope and panel profile matched to the drainage
  • Edge, corner and field uplift pressures from ASCE 7-22
  • Test evidence for the exact panel, clip and fastener combination
  • Clip spacing approved by your Engineer of Record
  • Snow retention and drift areas where snow loads apply
  • Paint and fastener upgrades for coastal or corrosive sites

Your Engineer of Record reviews and approves the roof design; the PE seal and permit stay with your team.

Specification

Standing Seam Roofing at a glance

ProfileMechanically seamed or snap-together standing seam, chosen for slope and wind
CoilZinc or zinc-aluminum coated steel with a factory paint finish; gauge and coating weight in your quote
AttachmentConcealed fixed and sliding clips to the purlins; no fasteners through the weather surface
UpliftFrom test data on the exact panel, clip and fastener combination (UL 580 or ASTM E1592 type)
TrimsRidge, eave, rake and gable trims, closures and gutters from the same coil and color
Code basisIBC Chapter 15 roof assemblies, reviewed by your Engineer of Record

From coil to crate

Made in Vietnam from coil to finished roof package

  1. Coil from Vietnam millsCoated, painted steel coil checked against its certificate.
  2. Roll-formed to lengthPanels formed to the lengths in your roof layout to cut end laps.
  3. Trims from the same coilFlashings and closures folded from matching coil and color.
  4. Crated and protectedPanels crated with protective film for the ocean voyage.
Inside a big warehouse: steel columns carrying rafters and the roofPhoto
Exported steel in place in Philippines: a World Steel job abroad, shown for the building type rather than a US site.
Finished feed mill with long blue metal roofs, seen from the airPhoto
Feed mill roofs from the air, a World Steel job in the Mekong Delta of Vietnam.
Rows of roof purlins and rod bracing across a steel framePhoto
Exported steel in place in Thailand: a World Steel job abroad, shown for the building type rather than a US site.

Questions

Standing Seam Roofing, answered

How is standing seam different from a through-fastened roof?

Through-fastened panels are screwed through the weather surface into the purlins. Standing seam panels are held by concealed clips under raised seams, so the roof has no exposed screws and can move as it heats and cools.

What wind uplift can the roof take?

It depends on the panel, the clip, the fasteners and the purlin spacing together. We size the roof from test data on that exact combination, and your Engineer of Record checks it against the ASCE 7-22 pressures for your site.

Can you match the roof to the wall panels and trims?

Yes. Trims, closures and gutters are folded from the same coil and color as the panels and ship in the same package.

Is the roof made in Vietnam?

Yes. The coil comes from mills in Vietnam and the panels are roll-formed by World Steel, then crated with the rest of your steel.

More roofing: Metal Roof Panels · Through-Fastened Roofing · Insulated Roof Panels · Roof Insulation · Ridge Caps · Roof Flashings · Roof Ventilators · Roof Access Components

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Standing Seam Roofing

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Drawn illustration of roofing system, standing in for a photo of this product Illustration

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.