Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Doors & building openings · Skylights

Turn the roof into a light source

A deep warehouse or plant is dark in the middle, so the lights stay on all day. Translucent panels that match the roof profile let daylight in from above, spread evenly across the floor. We lay them out on the roof plan, lap them into the steel panels and ship them in the same roof package.

IllustrationSkylight runs spread evenly and kept off the ridge and eaves.

Layout rules

How we place skylights

  • Spread evenly across the roof, not bunched
  • Kept away from ridge, eaves and valleys
  • Lapped into the panel run like a steel sheet
  • Fastened and sealed as the maker details
Finished feed mill with long blue metal roofs, seen from the airPhoto
Feed mill roofs from the air, a World Steel job in the Mekong Delta of Vietnam.
Inside a big warehouse: steel columns carrying rafters and the roofPhoto
Exported steel in place in Philippines: a World Steel job abroad, shown for the building type rather than a US site.

Why it pays

Light from above, all day

  • Daylight inside

    Less need for lights in the day.

  • Matches the profile

    Laps in with the steel sheets.

  • Planned on the roof

    Even light across the floor.

  • One roof package

    Ships with the panels.

How it is planned

On the roof plan

  1. Light goalUse of the building and the floor plan.
  2. Roof planSkylight runs placed and lapped.
  3. Shipped togetherWith the roof sheets and sealants.

Specification

Skylights at a glance

Type
Translucent panels matching the roof profile
Layout
Placed on the roof plan in the panel runs
Laps and seals
Detailed with the steel roof panels
Fall protection
Skylights are not walkable; site safety per your contractor’s plan
Impact and uplift
Only from test data for the chosen panel, confirmed per project
Supply
With the roof panels

Questions

Skylight questions

Can people walk on skylights?

No. Skylight panels are not walkable. Your contractor’s site safety plan covers fall protection during erection and maintenance.

Are the skylights rated for hurricane uplift or impact?

Not as a general claim. No impact or uplift test data is published for these panels. Where ratings are required, your designer specifies a tested panel and we confirm data per project.

How many skylights should I have?

That depends on the use and the light you want. We lay them out evenly on the roof plan with your designer.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Skylights

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Drawn illustration of doors & building openings, standing in for a photo of this product Illustration

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.