High-bay storage: every meter of clear height has to be earned

Tall racking and automated storage pay back only if the building gives them the height they were bought for. We design tall frames, wall girts and roof steel around your racks and sprinklers, in a plant that fabricates 2,500 t of structural steel a month, so a 40,000 m² (430,000 sq ft) high-bay is one order.

Pick a clear height

0 m 5 m 10 m 15 m 20 m SPRINKLER CLEARANCE SPRINKLER CLEARANCE SPRINKLER CLEARANCE SPRINKLER CLEARANCE SECTION · CLEAR HEIGHT IN RED

9.8 m (32 ft): Standard clear height for modern bulk buildings. Portal or multi-span frames, girts sized for wind on a wall about as tall as a three-story building.

12.2 m (40 ft): Taller walls take more wind, so girt and column sizes step up, and wall bracing is checked for drift. Roof steel is set to keep sprinkler clearance over the top rack.

15 m (50 ft): Column lines must hit the rack flue spaces exactly. Frame drift and roof deflection are limited so the tallest rack and its sprinklers still clear the steel.

20 m+ (65 ft+): Tall, narrow frames built around the crane aisles of the storage system. Tolerances and deflection limits come from the system supplier and your Engineer of Record.

Typical ranges, not design values. Your Engineer of Record sets the design.

Large-project capacity

Tall, wide and repeated: high-bay jobs are tonnage jobs

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.

2,500 metric tons a month

What decides a tall frame

Five things that size the steel of a high-bay building

Wind on tall walls

A 12 m (40 ft) wall catches a lot of wind. Girts, wind columns and wall bracing are sized for the site’s design wind under ASCE 7, and wall deflection is limited so cladding and dock seals stay tight.

Clearance under the roof

The top of the highest load plus the sprinkler clearance your fire protection engineer specifies sets the bottom of the roof steel, not the other way round.

Columns in the flue spaces

We set the column grid from your rack layout so every column sits in a flue or end aisle, and show it on the anchor bolt plan before the slab is poured.

Snow, drift and ponding

Big flat roofs collect snow drift against taller neighbors and water where the roof deflects. Both are checked in design, roof bay by roof bay.

Erection of tall members

Tall columns ship in sections with bolted splices where a single piece would be too long for a container or truck, and the splice is designed with the column.

From our project files

ASRS + Intake Kampot: a frame built around automated storage

A warehouse in Cambodia built around an automated storage and retrieval system, framed with World Steel steel. Tall, narrow bays were detailed to the clearances of the storage equipment inside.

See the project

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Frame, wall and roof steel designed around your rack layout and sprinkler clearance
  • Column grid and anchor bolt plans issued before the slab is poured
  • Shop and erection drawings at no extra cost, ready for your Engineer of Record
  • Fabrication in our IAS AC472-accredited plant in Vietnam, tracked live in PEB Studio

The US contractor, our customer

  • Drawing approval, the PE seal and the permit with your Engineer of Record
  • Rack design and rack anchorage with the rack maker
  • Sprinkler design with your fire protection engineer
  • Slab flatness, foundations and erection on site

Questions from US contractors

High-bay warehouse steel: questions and answers

6 answers, grouped by topic.

Clear height 2 answers

How is the clear height of a high-bay warehouse set?

From the top of the highest stored load, plus the clearance your fire protection engineer needs for the sprinklers, plus the depth of the roof steel. We start from your rack elevation and work up.

Can you build above 12 m (40 ft) clear?

Yes. Tall frames for very narrow aisle racking and automated storage are standard work for the plant. Wind on the tall walls and frame drift decide the member sizes.

Racks and automation 3 answers

Do you design the racks?

No. Racks are designed by the rack maker. We set the building grid from their layout and coordinate loads, anchorage zones and clearances with them.

Can you build around an automated storage system?

Yes. Our ASRS + Intake Kampot project was framed around an automated storage system. Tolerances and deflection limits come from the system supplier and your Engineer of Record, and we fabricate to them.

Can the roof carry sprinkler mains and lighting?

Yes. Collateral loads for sprinklers, lighting and ducts are agreed before design and carried in the roof steel.

Large buildings 1 answer

Can you supply a very large high-bay building as one order?

Yes. The plant fabricates 2,500 t of structural steel a month, and the M&D warehouse in Thailand took about 2,000 t in one order.

Keep reading

Related pages

Price it or partner with us

Send the rack plan, and we will build up from it.

Share the rack layout, the sprinkler type and the site. We will show the frame that gives you the clear height you need and price the steel.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Tell us about the building

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details