Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

K-12 schools

Steel for K-12 schools, planned around the summer break

Gymnasiums, classroom wings, cafeterias and covered walkways for school districts and the contractors who build for them. Our plant fabricates 2,500 t of structural steel a month, so a district-wide bond program or a single new campus runs as one order, sequenced to land on site when students leave.

Design basis
IBC 2024 · ASCE 7-22 · AISC 360
Welding
AWS D1.1 qualified procedures
Plant
IAS AC472 accredited, Vietnam
Tracking
Live in PEB Studio
Completed early learning building in Western Australia framed with 60 metric tons of World Steel structural steel

The school year, and when steel goes up

  1. Aug: school opens
  2. Sep: classes in session
  3. Oct: classes in session
  4. Nov: classes in session
  5. Dec: classes in session
  6. Jan: classes in session
  7. Feb: classes in session
  8. Mar: classes in session
  9. Apr: classes in session
  10. May: classes in session
  11. Jun: summer break, erection window
  12. Jul: summer break, erection window

Space by space

What each part of a K-12 campus asks of the steel

A school is several buildings in one. Pick a space to see what drives its frame and what we supply for it.

Gymnasiums and multipurpose rooms

What drives the steel

A competition gym needs a column-free floor, often 30 to 40 m (100 to 130 ft) across, with a roof that also carries scoreboards, basketball goals, lighting and sometimes a divider curtain. Ponding on a low-slope roof and drift where the gym meets a lower wing are checked in design.

What we supply

Clear-span rigid frames or steel trusses, hang points for equipment shown on the shop drawings, and girts framed around high windows and louvers.

Classroom wings

What drives the steel

Two- and three-story wings repeat the same classroom bay many times. Floor vibration under foot traffic, openings for ducts above the ceiling and the fire-resistance rating set by your architect drive the beam sizes and details.

What we supply

Braced multi-story frames with beams ready for composite deck, the same bay fabricated many times over, and connections detailed in one Tekla model.

Cafeterias and kitchens

What drives the steel

A cafeteria is an open assembly room next to a kitchen full of heavy equipment. Rooftop units and exhaust hoods need framed supports, and the roof over the kitchen collects grease exhaust penetrations that must be planned before fabrication.

What we supply

Open-span framing over the dining room, steel dunnage for rooftop equipment and framed openings for hoods and ducts.

Covered walkways and canopies

What drives the steel

Walkways connect buildings, bus loops and parent pick-up lanes. Long, narrow canopies are light, so wind uplift and the column base, not gravity, usually govern the design.

What we supply

Canopy frames and entrance covers with base plates and anchor bolt plans, finished to match the main buildings.

Stairs, guards and handrails

What drives the steel

Egress stairs in a school carry crowds at every bell. Guard heights, opening limits and handrail continuity come from the IBC and the accessibility standard your architect follows.

What we supply

Steel stairs, guardrails and handrails fabricated with the frame, shop-primed or galvanized, and shown on the same erection drawings.

Storm shelter rooms

What drives the steel

In states that require them, a new school gym or core area can double as a storm shelter under ICC 500. The shelter criteria are much higher than normal design wind, and they are set by your Engineer of Record and the building official.

What we supply

Steel framing designed to the shelter criteria your Engineer of Record sets, with calculations ready for their review.

Plan backward from the summer

One date drives the whole steel schedule

Most districts want the noisy work done while classrooms are empty. We plan the steel from the day your crew can start, then confirm the dates for your job in the quote.

  1. Pick the erection start

    The district and your team agree the date the crew can start on site, usually the first week of the summer break. Everything else is planned backward from that date.

  2. Design and shop drawings

    We design the steel to the bid documents and produce shop and erection drawings, at no extra cost, for your Engineer of Record to review and approve.

  3. Fabrication in Vietnam

    Members are cut, welded, blasted and painted in our plant. You watch each piece move through the shop in PEB Studio instead of waiting for status emails.

  4. Ocean freight to a US port

    Steel ships in containers or as breakbulk, packed and labeled by erection sequence so the first bay off the truck is the first bay to go up.

  5. Erection by your crew

    Your erector starts when students leave. A complete, labeled package with anchor bolt plans means fewer stoppages during the weeks that matter most.

Byford Child Care, an early learning building framed by World Steel 3D model
Steel stair tower with landings and guardrails fabricated by World Steel Photo
Steel floor beams carrying metal decking on a multi-story frame Photo
Long clear-span steel interior with no internal columns Photo

Byford Child Care is an early learning building in Western Australia, framed with about 60 t of our steel. Small public buildings go through the same IAS AC472 inspection program as our 5,000 t jobs. See the project

Public bids

What a district’s bid package asks of the steel supplier

School districts buy through formal bids funded by bonds, state programs and grants. Each source can add its own documentation. We read the submittal list first and answer it line by line.

How we work with public-work contractors
  • Structural calculationsDesign calculations to the editions named in the bid, ready for your Engineer of Record to review and approve.
  • Shop and erection drawingsDetailed in Tekla Structures, every piece marked to match the shipping list.
  • Manufacturing Data RecordMill certificates, welding procedures and welder qualifications, inspection reports and coating records in one file.
  • Fabricator quality programOur plant is accredited under IAS AC472, which many US building departments accept for fabricator inspection.
  • Funding-source rulesBonds and state programs add their own paperwork. Where federal funds are involved, sourcing rules are confirmed with the funding agency before we quote.

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Structural design of the steel to the bid documents and the code editions they name
  • Shop and erection drawings at no extra cost, ready for your Engineer of Record
  • Fabrication, blasting and painting in our IAS AC472-accredited plant in Vietnam
  • Stairs, guards, canopies and equipment supports in the same package
  • A Manufacturing Data Record and PEB Studio tracking for every piece

The US contractor, our customer

  • Drawing approval, the PE seal and the permit with your Engineer of Record
  • Foundations, anchor bolt setting and erection on site
  • Special inspections the building official requires on site
  • Coordination with the district, the architect and the construction manager

Questions from US contractors

K-12 school steel: questions and answers

8 answers, grouped by topic.

Schedule and the school year 2 answers

Can you plan steel delivery around the summer break?

Yes. We plan backward from the date your crew can start on site, set the fabrication and shipping order to match the erection sequence and confirm the dates in the quote. You follow fabrication live in PEB Studio.

What happens if the bid is awarded late in spring?

Tell us the award date and the erection start as early as you can. A late award narrows the time for drawing approval, so we agree which buildings or bays ship first and fabricate in that order.

Design and codes 3 answers

Which codes do you design K-12 steel to?

We design to the codes your bid documents name, typically IBC 2024, ASCE 7-22 and AISC 360, with the state amendments your Engineer of Record applies. The steel is designed to those standards; approval stays with your Engineer of Record and the building official.

Can a school gym be designed as an ICC 500 storm shelter?

Where your Engineer of Record sets ICC 500 criteria, we design the steel framing to them and provide calculations for their review. Shelter design, approval and the rest of the shelter envelope stay with your design team.

Do you provide PE-stamped drawings for school projects?

No. World Steel designs and fabricates. Calculations and drawings are prepared for your Engineer of Record, who reviews, approves and seals them for the permit.

Bids and paperwork 2 answers

What submittals do you supply for a school bid?

Structural calculations, shop and erection drawings, mill certificates, welding procedures and welder qualifications, inspection reports and coating records, collected in a Manufacturing Data Record and matched to the bid’s submittal list.

Can districts using federal funds buy steel made in Vietnam?

It depends on the funding program. Where federal funds are involved, the sourcing rules are confirmed with the funding agency before we quote, so the district and your team know the position before the bid.

Large programs 1 answer

Can you supply several schools in one bond program?

Yes. The plant fabricates 2,500 t of structural steel a month, so several campuses can run as one order with a shipping sequence per site.

Keep reading

Related pages

Price it or partner with us

Send the bid set before the next summer.

Share the drawings, the specification and the date your crew can start. We will price the steel and show how it ships to meet that date.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Tell us about the building

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details