Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Corrosion protection · Epoxy coatings

The thick, tough middle of the paint system

Between the zinc primer and the finish coat sits the epoxy. It is the layer that builds thickness, and thickness is what keeps water, salt and chemicals away from the steel for longer. We apply epoxy coats in our plant to the film thickness the system calls for, in systems for ISO 12944 C4 and C5 exposures.

IllustrationLayer thicknesses per the coating schedule.

ISO 12944

Matched to the corrosivity category

C3MediumUrban and light industrial air
C4HighIndustrial areas, coastal with moderate salt
C5Very highAggressive industry, coastal with high salt

We offer paint systems for C4 and C5 exposures. Your designer sets the category and durability target.

International paint brands

Coating systems from brands sold around the world

We apply coating systems from Jotun, PPG, Carboline, Hempel, Nippon Paint and International Paint (IP), epoxy lines included. They are worldwide products, so the US contractor, our customer, can buy the same product near the job for touch-up and warranty work.

  • Sold worldwide, sold in the US. Each brand sells through its own distribution network across the United States, so the same product is easy to find near your job.
  • Touch-up with the exact product. Handling and erection damage is repaired with the same product named on the coating schedule, bought locally by the US contractor if more is needed.
  • Warranty work stays simple. One named product line from primer to finish, with its batch numbers in our records, so any coating question goes to a manufacturer with a US presence.
  • Data sheets US teams know. English product and safety data sheets your specifier, inspector and painter already work with.
  • JotunNorway
  • PPGUnited States
  • CarbolineUnited States
  • HempelDenmark
  • Nippon PaintJapan
  • International PaintUnited Kingdom

Epoxy and finish lines we apply

  • Zinc-rich epoxy primers
  • High-build epoxy coats
  • Polyurethane finish coats
  • Epoxy intumescent fire coatings

Brand names are trademarks of their owners and are named only to show the coating systems we apply. No partnership or endorsement is implied. The product on each project is the one named in its coating schedule. Surface preparation follows SSPC standards, read with the paint data sheet.

Why it pays

Thickness is protection

  • Builds thickness

    More barrier against moisture.

  • Seals the primer

    Keeps water and salt out.

  • Chemical resistance

    For industrial air and splash.

  • Shop applied

    Controlled cure, measured film.

  1. Category setISO 12944 for the site.
  2. System scheduledCoats and thicknesses.
  3. AppliedOver the zinc primer.
  4. MeasuredFilm thickness logged.

Specification

Epoxy coatings at a glance

Coating
Epoxy intermediate coats from Jotun, PPG, Carboline, Hempel, Nippon Paint or International Paint (IP)
Role
Builds film thickness and seals the primer
Systems
For ISO 12944 C4 and C5 exposures
Application
Airless spray in our plant, under cover
Film thickness
Per the coating schedule, measured and logged
Topcoat
Polyurethane where steel is in sunlight
Coated members drying in rows on stands in the paint hallPhoto
Members drying in the World Steel paint hall in Vietnam after coating.
Members in gray finish paint laid out in the paint hallPhoto
Gray finish coat applied in the Vietnam paint hall.

Questions

Epoxy coating questions

How long will the paint last?

ISO 12944 sets durability ranges, and your designer picks the target with the exposure category. We apply the system specified; actual life depends on the site, the exposure and maintenance.

Can epoxy be the final coat?

Indoors, often yes. Epoxy chalks and fades in sunlight, so outdoor steel usually gets a polyurethane finish coat.

What does C5 mean?

It is the ISO 12944 category for very high corrosivity, such as aggressive industry or coastal sites with high salt. We offer paint systems for C4 and C5.

Who applies the epoxy?

Our own painters, trained and certified by the paint manufacturer, in our paint shop. The coating products we use carry UL certification.

Which brands are the epoxy coats from?

Epoxy lines from Jotun, PPG, Carboline, Hempel, Nippon Paint or International Paint (IP), as named on the coating schedule. These brands sell worldwide, including across the US, so the same epoxy can be bought locally for touch-up and warranty work.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Epoxy Coatings

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Coated members drying in rows on stands in the paint hall Photo

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.