Corrosion protection · Zinc-rich primer

Zinc on bare steel, within hours of the blast

A paint system is only as good as its first coat. Zinc-rich primer goes on bare, freshly blast-cleaned steel and protects it the way galvanizing does: if the coating is scratched, the zinc corrodes first and the steel underneath stays sound. We blast and prime in our own plant, under cover, so the steel never sits bare in the weather.

IllustrationBare steel (left) and zinc-primed steel (right).

Blast to primer

Four steps, no time to rust

  1. Blast cleanedMill scale and rust removed to the AMPP grade in the spec.
  2. Profile checkedSurface roughness measured so the primer grips.
  3. Primed fastZinc-rich primer sprayed before the surface can flash-rust.
  4. Film measuredDry film thickness checked and logged.

Why it pays

The coat everything else depends on

  • Sacrificial protection

    Zinc corrodes before the steel.

  • Applied in the plant

    Blast and prime under cover.

  • Measured

    Profile and film thickness logged.

  • Base for the system

    Epoxy and finish coats go on top.

  1. Exposure classedISO 12944 category for the site.
  2. Blast cleanedTo the AMPP grade.
  3. PrimedBefore flash rust.
  4. Checked and loggedIn the data record.

Specification

Zinc-rich primer at a glance

Coating
Zinc-rich primer from Jotun, PPG, Carboline, Hempel, Nippon Paint or International Paint (IP)
Surface preparation
Blast cleaning to the AMPP (formerly SSPC) grade in the spec
Application
Airless spray in our plant, under cover
Film thickness
Per the coating system, measured and logged
System
First coat of a system chosen for the ISO 12944 exposure
Records
Results in the Manufacturing Data Record shipped with the steel

Where it goes

Under every exterior system

Roller conveyor carrying members into a shot-blasting machinePhoto
Surface preparation: the automatic shot blaster at the Vietnam plant.
Primed column with its bolted end plate set on painting standsPhoto
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.

Questions

Primer questions

Why zinc-rich instead of an ordinary primer?

Zinc gives sacrificial protection: at a scratch or chip, the zinc corrodes first and protects the steel next to it. Ordinary primers only act as a barrier.

Which coating brands do you use?

We buy coatings from established coating manufacturers and name the products in the project coating schedule for your designer to approve.

Can primed steel sit outdoors on site?

For a short time. The primer is the first coat, not the whole system, so the remaining coats should follow as the specification says.

Who applies the primer?

Our own painters, trained and certified by the paint manufacturer, in our paint shop. The coating products we use carry UL certification.

Which primer brands do you use?

Zinc-rich primers from Jotun, PPG, Carboline, Hempel, Nippon Paint or International Paint (IP), chosen with the rest of the system. All are sold worldwide, so a matching touch-up primer is easy to buy in the US.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Zinc-Rich Primer

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Primed column with its bolted end plate set on painting stands Photo

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.