In the US market
State agencies, counties, cities and special districts buy buildings through public bids with defined submittals. Federally funded work can add steel sourcing rules that the contracting agency must confirm.
Public money, public records
Public owners need buildings that match the bid exactly and records that satisfy auditors. We prepare both alongside fabrication in our Vietnam plant.
Halls, shops and storage for towns and counties, built as complete metal building packages.
Learn more →Mill certificates and inspection results are bound into a Manufacturing Data Record.
Learn more →Each quote states the Incoterm and the importer of record before any bid is submitted.
Learn more →State agencies, counties, cities and special districts buy buildings through public bids with defined submittals. Federally funded work can add steel sourcing rules that the contracting agency must confirm.
Engineering to the exact code edition the bid cites, complete material and welding records, and a supply scope that matches the specification exactly.
We provide calculations, shop drawings and a Manufacturing Data Record with mill certificates and inspection results. Each quote states the Incoterm and who acts as importer of record, and we make no eligibility claim for federally funded programs.
Engineering
Our engineers design to the code edition your jurisdiction has adopted, and deliver calculations and drawings ready for your Engineer of Record to review and approve.
Solutions · End to end
One partner carries your government & public building from the first calculation to the last container. Westminster, California is our US office; every member is made in Vietnam.
Designed to IBC 2024 and ASCE 7-22, with drawings ready for your engineer’s review and approval.
Steel building design →Cut, welded and coated in World Steel’s own IAS AC472-accredited plant, from steel rolled mainly in Vietnam and ordered to US grades.
Inside the plant →Watch each of your members move through fabrication and QC release, in real time.
PEB Studio →Packed by erection sequence and shipped to West, Gulf or East Coast ports, then trucked to site.
Vietnam to USA →Piece marks, erection drawings and packing lists let your erector start straight away.
How we work →PEB Studio
Log in to PEB Studio and follow every column, rafter and purlin of your project through cutting, welding, coating and QC release at our Vietnam plant. Your team plans erection around real progress, not promises.
Demonstration data
The Government & Public ecosystem
Products you can buy, solutions that deliver them, the states we ship to and the people we work with. Each link opens its own page.
ApplicationsRelated industries
State guides
Questions and answers
16 straight answers on design, fabrication in our Vietnam plant, shipping and who does what on your project.
We usually supply steel to the contractor who holds the public contract, along with the submittals the specification asks for.
Sourcing rules are confirmed with the funding agency first, because some programs restrict imported steel. We make no eligibility claim.
Some states and cities have their own procurement rules. We ask the contractor to confirm them with the owner before we quote.
No. It is fabricated in World Steel’s plant in Vietnam from steel ordered to US grades, mainly from Vietnamese mills, and shipped to the US. We say so plainly in every proposal.
Public works yards and garages, fire and EMS stations, community centers, libraries, salt storage, transit facilities and municipal warehouses.
Yes. When your Engineer of Record assigns Risk Category IV, the frame, bracing and anchorage are designed to it.
Yes. Parapets, canopies and openings are framed into the steel, and the architect chooses the cladding and finishes.
IBC 2024 and ASCE 7-22 loads with AISC 360 by default, or the code your jurisdiction has adopted, confirmed by your Engineer of Record.
Calculations, shop drawings and a Manufacturing Data Record with mill certificates and inspection results.
Yes. World Steel is accredited under IAS AC472, the first and only fabricator in Vietnam to hold it, audited twice a year.
Yes. Witness points can be attended in person or remotely, and PEB Studio shows each piece’s status in real time.
Yes. The plant fabricates up to 2,500 metric tons (2,756 short tons) of steel a month, so several buildings can be in production together.
No. World Steel designs, fabricates and supplies. Erection and site work belong to the US contractor, our customer.
Your Engineer of Record reviews and approves our calculations and drawings and handles the PE seal; the contractor manages the permit.
Yes, for every project at no extra cost.
The bid documents, the structural and procurement sections, the site address and the submittal list.
Neighboring industries
Send a footprint, a sketch or a full drawing set. An engineer checks it against US code requirements and replies with exactly what World Steel would make in Vietnam and ship to your port.