Corrosion protection · Coating inspection

Every coat measured, every number written down

A coating schedule is only a promise until someone measures it. In our plant, inspectors check the blast cleanliness and surface profile before painting, measure the dry film thickness of each coat, and test adhesion where the specification calls for it. Every result goes into section 06 of the Manufacturing Data Record that ships with your steel.

A film thickness gauge dial with its needle moving within the green acceptance band Within the specified range
IllustrationReadings logged in MDR section 06.

The log

Six things we check and record

CleanlinessBlast grade against the AMPP standard in the spec
ProfileSurface roughness so the primer grips
ConditionsAir and steel temperature, humidity, dew point
Film thicknessEach coat measured with a gauge
AdhesionTested where the specification requires
AppearanceRuns, sags, misses and damage

Why it pays

Proof, not promises

  • Measured, not assumed

    Numbers for every coat.

  • Records ship with steel

    In the data record.

  • Remote access

    Inspectors can watch by video.

  • Fixed before shipping

    Not found on site.

  1. Before paintingCleanliness, profile, conditions.
  2. After each coatFilm thickness measured.
  3. LoggedInto MDR section 06.
ChecksCleanliness, profile, conditions, film thickness, adhesion, appearance
StandardsSurface preparation to AMPP grades; checks per the project specification
RecordsManufacturing Data Record, section 06
WitnessingYour inspector can visit, or join by video on request
RepairsOut-of-spec areas repaired and remeasured before shipping
PlantIAS AC472 accredited since 2019

Questions

Inspection questions

What is the Manufacturing Data Record?

A document package that ships with your steel, collecting material, welding, dimensional and coating records. Coating results are in section 06.

Can a third-party inspector check the coatings?

Yes. Your inspector can visit the plant, and remote video access is available on request.

What happens if film thickness is low?

The area gets another coat and is remeasured before shipping. The record shows the final readings.

Who applies the coatings?

Our own painters, trained and certified by the paint manufacturer, in our paint shop. The coating products we use carry UL certification.

Which paint brands are inspected?

The products on your coating schedule, usually from Jotun, PPG, Carboline, Hempel, Nippon Paint or International Paint (IP). We inspect to the manufacturer’s data sheet for that product, and the batch numbers go in the records.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Coating Inspection

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Inspector walking a line of painted built-up members on the shop floor Photo

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.