The build-up
Four layers, each checked before the next goes on
Shot or grit blasted to the specified cleanliness and anchor profile
Zinc-rich or other primer as the system specifies
Epoxy build coat where the system has one
Polyurethane or other finish coat in the agreed color
Systems we apply: zinc-rich primer, epoxy, polyurethane and duplex systems.
In the paint hall
From bare steel to a logged coating
- Prepare the surface
Oil, grease, weld spatter, slag and sharp edges are removed before blasting.
- Blast indoors
Members run through the shot-blasting machine; abrasive is kept dry and clean, and nozzles are checked for wear.
- Check the profile
Surface profile is checked with a profile comparator gauge and verified by QC before any paint goes on.
- Apply each coat
Airless spray held 250 to 350 mm (about 10 to 14 in) from the steel, each pass overlapping the last by half.
- Measure and log
Dry film thickness and appearance are checked on every coat; adhesion is tested as the system requires.
Conditions before coating
3 °C (5 °F)
Steel surface at least this far above the dew point before coating
4 °C (39 °F)
No paint applied when steel or paint is colder than this
Humidity
Workshop temperature and humidity checked by the foreman and QC before work starts
Indoors
Blasting and painting done inside, out of rain, wind and mist
When your design calls for hot-dip galvanizing, World Steel coordinates it with a galvanizer in Vietnam after fabrication, and the galvanized members follow the same QC release before they ship. Duplex systems (galvanizing plus paint) can be specified too.
Questions
Blasting and coating questions
Is blasting done indoors?
Yes. Members are blasted in the shot-blasting machine and painted in the paint hall, out of rain, wind and mist.
Which surface standard do you blast to?
The one in your specification. Cleanliness and anchor profile are set in the quote and checked before painting with a profile comparator gauge.
Which coating systems can you apply?
Zinc-rich primers plus epoxy and polyurethane systems, or the system your specification names. Paint is bought from coating manufacturers and applied to their data sheets.
What is recorded?
Surface profile, dry film thickness and adhesion are logged with the member in PEB Studio and copied into the manufacturing data record.
Do you galvanize?
Hot-dip galvanizing is done by a galvanizer in Vietnam that World Steel coordinates, when your design calls for it. Galvanized members follow the same QC release before they ship.
Built for large jobs
Put your next steel package through this station
Blasting & coating is one of eight stations in a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019 and audited twice a year. Shop drawings are included on every project.
- 5,000 tSunpro Steel Factory
- 2,500 tCPV Food Processing Factory
- 2,000 tLong Son petrochemical complex
- 2,000 tM&D (MD Factory)
Request a quote
Send drawings, a model or a steel list. Our engineers take off the quantities, check the US code basis and price the fabricated steel, delivered to your US port.
Become our partner in the US
You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and OEM supply under your brand.
Watch this station work on your own job. Hold and witness points can be attended live on Zoom or Microsoft Teams, and every record is in PEB Studio.
Book an online audit