Crane runway & industrial supports · Runway beams

A runway that keeps the crane on track for decades

A crane runway takes moving wheel loads, sideways thrust and impact on every lift, millions of times over its life. Bolt it on as an afterthought and it cracks, drifts and throws the crane out of line. We design runway girders and brackets together with the columns, weld them in our IAS AC472 accredited plant, and ship them marked for alignment.

Runway girder section with a rail and crane wheel, and arrows for vertical wheel load, lateral thrust and longitudinal force Vertical Lateral Longitudinal Runway girder
IllustrationThree forces on every lift, designed for fatigue.

What the runway carries

Three forces, millions of times

Vertical wheel loadsCrane, trolley and lifted load, with impact, moving along the girder.
Lateral thrustTrolley acceleration and braking push sideways on the rail.
Longitudinal forceBridge braking pushes along the runway to the end stops.

Why it pays

A runway you never think about

  • Designed for fatigue

    Every lift counts, for decades.

  • Alignment held

    Columns and girders stiff enough.

  • Welded under accreditation

    IAS AC472, audited twice a year.

  • One design

    Runway and building checked together.

Specification

Runway beams at a glance

Girders
Rolled or built-up sections, with cap channels or plates where required
Design
Designed to AISC 360 and AISC Design Guide 7, for fatigue as well as strength
Welding
AWS D1.1, by qualified welders in our IAS AC472 accredited plant
Crane data
Wheel loads, span and service class from the crane supplier, per CMAA 70 or 74
Rails
Rail clips and pads located on the drawings, to the tolerances shown
Accessories
End stops, brackets and runway bracing
Tall lattice columns of a crane-served industrial building during erectionPhoto
Crane setting a rafter on a warehouse framePhoto

How it works

From crane data to aligned girders

  1. Crane dataWheel loads, span, service class.
  2. Runway designedWith columns and bracing.
  3. Girders weldedChecked and painted.
  4. Shipped markedFor alignment on site.

Where it goes

Crane buildings we supply

Questions

Runway questions

What crane data do you need?

Wheel loads, wheel spacing, crane span, hook height, speeds and the CMAA 70 or 74 service class from your crane supplier. If the crane is not chosen yet, we start from typical data and update the design.

Who aligns the runway?

Your erector sets and aligns the runway to the tolerances on our drawings. We fabricate the girders so that alignment can be reached.

Can you supply the crane too?

Yes. We can supply the overhead crane with the runway, so wheel loads and clearances are set in one design.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Crane Runway Beams

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Stiffened heavy plate girders resting on shop supports Photo

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.