Edge profiles
Six slab edge and pour stop profiles we fabricate
The edge of each floor is drawn as one of these sections. The scope sheet with our quote says which ones are in our order.
- Bent plate pour stopSlab edges on composite deck floors, welded to the edge beam.Often supplied by the deck supplier; listed on the scope sheet as ours or by others.
- Angle pour stopEdges where the slab is deeper or the overhang longer than a bent plate suits.Rolled angle cut to length and set to the slab top elevation.
- Cast-in edge angleExposed slab edges, openings and stair landings that need a hard steel nose.Angle with headed studs welded to its legs, cast into the slab.
- Opening edge angleShafts, stair openings and floor openings framed in the deck.Angles that close the deck at the opening and carry the slab edge.
- Pour stop with kickersLong overhangs past the edge beam.Small angle braces from the pour stop back to the beam, where the design calls for them.
- Facade edge angleEdges that carry curtain wall or panel anchors.Continuous angle set to the line the facade trade needs, coordinated before release.
Sizing
How a pour stop is sized
A pour stop is a steel form that stays in the building. Its size is a design decision, and the drawings carry it to our shop.
Slab depth and overhang set the size
A pour stop holds wet concrete like a form. Its thickness depends on the slab depth and how far the slab overhangs the beam.
Chosen by the Engineer of Record
Your engineer selects the pour stop gauge or angle size, commonly from the Steel Deck Institute pour stop selection table, and shows it on the drawings.
Drawn level by level
We cut each length to the slab top elevation and edge line on that floor, so changes in slab depth or edge offset are built in.
Kickers where needed
Where the overhang is long, the design adds kickers from the pour stop to the beam. We fabricate and mark them with the edge they brace.
Shop or field
What we attach in the plant, and what is attached on site
Facade line
A straight edge for the curtain wall
The facade trade anchors to the slab edge. If the edge wanders, every anchor bracket needs a fix. So the edge is agreed before it is cut.
- Edge line agreed firstThe edge line and slab top elevation the facade trade needs are confirmed before edge steel is released for fabrication.
- Tolerances written downEdge position tolerances come from your contract documents. We detail to them and check cut lengths against the model.
- Anchor channels and platesFacade embeds and anchor plates can be added to the edge steel when they are in our order.
Who does what
Edge steel: our part and the US contractor's part
World Steel details, fabricates, coats and ships. The US contractor, our customer, and its trades attach and pour.
Floors, members and packing in our work
Questions
Slab edge and pour stop questions
Who sizes the pour stop on a composite floor?
Your Engineer of Record, usually from the Steel Deck Institute pour stop selection table based on slab depth and overhang. We fabricate the size shown on the approved drawings.
Are bent plate pour stops part of the steel package or the deck package?
It depends on the contract. They are often supplied by the deck supplier. Our scope sheet lists each edge item as ours, the deck supplier’s or by others, so nothing is bought twice or missed.
Can slab edge angles be shop-welded to the beams?
Yes, where the drawings show it. The beam then ships with its edge attached and is erected as structural steel. Otherwise edges are field-welded after the deck is laid.
What is a kicker on a pour stop?
A small brace from the pour stop back to the edge beam that keeps a long overhang from rolling under the weight of wet concrete. We fabricate kickers where the design calls for them.
How do you keep the slab edge in line for the curtain wall?
The edge line and slab top elevation are agreed with the facade trade before edge steel is released, and every length is cut to that line on its floor.
Can cast-in edge angles have studs?
Yes. Headed studs are welded to the angle legs in our plant at the spacing on the drawings, then the concrete crew sets the angle before the pour.
Planning the floors too? See metal decking and composite floor support steel.
Built for large jobs
Slab edge angles for your next large package
Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.
- 5,000 tSunpro Steel Factory
- 2,500 tCPV Food Processing Factory
- 2,000 tLong Son petrochemical complex
- 2,000 tM&D (MD Factory)
Request a quote
Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.
Become our partner in the US
You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.
Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.
Shop drawings, included