Stair types
Three ways up
Why it pays
Stairs nobody trips on
- Even risersBuilt from the real floor height.
- Rules appliedIBC or OSHA, whichever governs.
- Bolts in placeLifted and bolted on site.
- With the floorShips with the mezzanine.
Photo
PhotoHow it is made
From floor height to finished flight
- Heights confirmedFloor to floor, landing levels.
- Stair drawnRise, run, treads, rails.
- FabricatedStringers, treads, landings.
- Shipped completeWith rails and bolts.
Specification
Stairs at a glance
- Stringers
- Steel channels or plates
- Treads
- Steel grating or checker plate, nosings per design
- Geometry
- Rise and run from your drawings, designed to the IBC or OSHA 1910 Subpart D
- Rails
- Handrails and guards with the stair
- Finish
- Galvanized or painted, per environment
- Connections
- Bolted to the floor framing
Questions
Stair questions
Which rules do the stairs follow?
The IBC for building stairs, or OSHA 1910 Subpart D for workplace stairs, whichever applies. Your designer confirms which governs; we design and fabricate to it.
What if the floor height on site is different?
We fabricate from the confirmed floor-to-floor height on the approved drawings. Your contractor confirms it before fabrication starts.
Do stairs come with rails?
Yes, handrails and guards are designed and shipped with the stair.
More mezzanines and floors: Steel Mezzanine Frames · Composite Floor Support Steel · Metal Decking · Steel Platforms · Equipment Floors · Access Walkways · Industrial Floor Support Structures · Handrails
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Stairs
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Photo
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions