Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Miscellaneous metals · Column and corner guards

Guards for every column a forklift can reach

In a busy warehouse or plant, the columns, door jambs and wall corners along the aisles take knocks every shift. World Steel reads your column grid and traffic plan, fabricates a guard for every exposed column and corner in the same plant that turns out 2,500 metric tons of structural steel a month, paints them safety yellow and ships them tagged by gridline with the frame they protect.

Floor plan of a warehouse aisle with yellow aisle lines, a row of steel columns, guards around the columns beside the aisle and a guarded door jamb COLUMN LINE ACOLUMN LINE BFORKLIFT AISLE WRAP GUARDFREE-STANDING GUARDDOOR JAMB
IllustrationNot to scale. Guard layout follows your traffic plan.
2,500 t a month

Guards ride in the same order as the columns they protect.

Whole column grids

A distribution center can have hundreds of interior columns along its aisles; each guard is marked to one.

One model

Guards are placed from the same model as the columns, girts and doors.

IAS AC472 plant

Cut, bent and welded under the same accredited quality system as the frame.

Guard types

Six guards for columns, jambs and corners

Each one is fabricated for a gridline or door on your drawings, not picked from a catalog on site.

Corner angle guards

Corners of steel and concrete columns

Heavy angles on the exposed corners, tied with plates or bolted through to each other.

Wrap-around column guards

Columns standing in open aisles

Plate or channel sections that close around all four faces of the column.

Free-standing pipe guards

Columns where a hit must not reach the steel

Pipe or plate guards anchored to the floor with a gap all round, so the hit goes into the slab.

Door jamb guards

Overhead and dock door openings

Angles or channels up each jamb, set to the door maker’s clearances.

Wall corner guards

Outside corners of walls and partitions

Angles fixed to the corner, painted to be seen from the aisle.

Guard rails along walls

Walls, equipment and walkways beside aisles

Low rails on posts anchored to the floor, set off the wall they protect.

Attached or anchored

Where the hit goes decides the guard

Attached to the column

Simple and compact. The guard is bolted or banded to the column, so a hard hit still reaches the column through the guard. Common for lighter traffic.

Anchored to the floor

The guard stands clear of the column on its own anchors, so the slab takes the hit, not the frame. Common where heavy forklifts or trucks pass.

Height and fixing

Cut to your fleet, fixed to your slab

Height from your fleetGuards are cut to the height of forks, masts and loads in your traffic plan, commonly about 1.2 m (4 ft) above the floor.
Anchors by your engineerFloor anchors are sized by your Engineer of Record for the slab. We drill base plates to that pattern; your crew installs the anchors.
Clear of slab jointsBase plates are placed clear of saw cuts and slab joints shown on the floor plan.
Racking by the rack makerUpright protectors and end-of-aisle guards on pallet racks come with the rack from its maker.
Safety yellowOSHA 1910.144 uses yellow to mark striking and tripping hazards. Guards are primed and painted safety yellow, or with black bands, from a major paint brand.
GalvanizedFor wet areas, wash bays and outside docks, guards can be hot-dip galvanized to ASTM A123 through an outside galvanizer and then painted.

Who does what

Column guards: our part and the US contractor's part

World Steel fabricates, paints and ships. The US contractor, our customer, sets and anchors.

World Steel

  • Reads the column grid, doors and traffic plan and lists every guard by gridline
  • Cuts, bends, drills and welds guards, base plates and rails in our plant
  • Primes and paints safety yellow, or galvanizes for wet areas
  • Tags each guard with its gridline or door number and packs it with its columns

The US contractor, our customer

  • Owner or safety lead sets the traffic plan and which columns need guards
  • Engineer of Record sizes floor anchors for the slab
  • Erector or site crew sets the guards and installs the anchors
  • Rack supplier provides the protection on pallet racks

Columns and painted steel in our work

Primed column with its bolted end plate set on painting stands
Finished columns with base plates resting on shop rails
Coated members drying in rows on stands in the paint hall
Rows of columns, rafters and purlins inside a large steel building

Questions

Column guard questions from US contractors

Should a column guard be fixed to the column or to the floor?

A guard fixed to the column is compact, but a hard hit still reaches the column. A free-standing guard anchored to the floor keeps the hit off the frame. Your traffic plan decides.

How tall should a column guard be?

Tall enough for the forks, masts and loads that pass, commonly about 1.2 m (4 ft). We cut each guard to the height on your drawings.

Why are column guards painted yellow?

OSHA 1910.144 uses yellow to mark striking and tripping hazards, so drivers see the guard before they reach it.

Do you supply guards for pallet racks?

No. Rack upright protectors and end-of-aisle guards come with the rack from its maker, who matches them to the rack design.

Who installs the guards and anchors?

The erector or site crew of the US contractor, our customer. We fabricate and ship each guard tagged by gridline; we do not install.

Can guards go on concrete columns too?

Yes. Corner angles and wrap guards are made for concrete columns as well, drilled for the anchors your engineer specifies.

Outside at doors and docks? See steel pipe bollards.

Built for large jobs

Column and corner guards for your next large package

Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.

  • 5,000 tSunpro Steel Factory
  • 2,500 tCPV Food Processing Factory
  • 2,000 tLong Son petrochemical complex
  • 2,000 tM&D (MD Factory)
Our large-project program Fillet, CJP and PJP welds on built-up members

Request a quote

Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.

Become our partner in the US

You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.

Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.

Shop drawings, included