Four ways up
The right access for every level
Why it pays
Access designed in, not added on
Safer access
Designed, not improvised.
Fits the building
Landings meet the steel.
Code-aware
IBC and OSHA geometry.
One package
With the building steel.
Specification
Industrial access at a glance
| Items | Stairs, fixed ladders, crossovers and small access platforms |
|---|---|
| Design | Designed to AISC 360; welding to AWS D1.1 |
| Geometry | Stair and ladder geometry and guarding per the IBC and OSHA rules that apply |
| Coordination | Landings aligned with framing and openings |
| Finish | Galvanized or painted |
| Marking | Shipped marked for location |
Photo
Photo- Access planWhere people need to go.
- Access detailedWith the building.
- FabricatedStairs, ladders, platforms.
- Shipped by locationReady for your erector.
Questions
Access questions
Stair or ladder?
Stairs wherever people carry tools or go up often. Fixed ladders where space is tight and visits are rare. OSHA and the IBC set where each is allowed.
Who confirms the access plan?
Your safety lead confirms the access plan for the facility. We design the pieces to suit.
Do you supply roof hatches?
Not as a standard item. Tell us what you need and we will confirm what we can supply.
More crane and industrial supports: Crane Runway Beams · Crane Supporting Columns · Equipment Platforms · Maintenance Walkways · Machinery Support Frames · Loading Platforms · Overhead Cranes · Hoists
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Industrial Access Systems
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions
Covered in our state guides