Connections
Four ways a shelf angle hangs from the building
The connection is drawn on the approved facade details. We fabricate the angle, clips and plates to it and slot what has to be adjusted.
Bolted to the spandrel
Angle bolted to a plate or clip on the spandrel beam through slotted holes, then shimmed to line and level.
Welded to the spandrel
Angle welded to the beam or to clip plates after it is set to line; field welding by the erector.
Knife plate stand-off
Angle carried on spaced plates off the beam, so insulation runs behind it and less heat escapes through the steel.
On a concrete slab edge
Angle bolted to cast-in inserts or embeds in a concrete edge, where the floor is concrete.
Adjustment
Built to be set to the brick, not the other way round
- Set to the brick coursingThe angle elevation has to land on a brick course. Vertical slots and shims let the erector set it to the course line.
- Set to the wall lineHorizontal slots or clip plates let the angle move in and out to keep the cavity width the architect drew.
- Lengths with gapsRuns are cut in lengths with small gaps between them and mitered or welded corners where the drawings show it.
The wall around it
A shelf angle is one part of a moving wall
The frame deflects, the brick grows and water runs down the cavity. The steel is detailed so the rest of the wall can do its job.
Who does what
Shelf angles: our part and the US contractor's part
World Steel details, fabricates, coats and ships. The US contractor, our customer, and its erector and mason install.
Frames, galvanized steel and packing in our work
Questions
Shelf and relieving angle questions
What is the difference between a shelf angle and a lintel?
A lintel spans over an opening and bears on the masonry at each end. A shelf angle runs along the floor line and carries the brick veneer above it, hung from the steel frame or a concrete edge.
Are shelf angles part of the structural steel package?
Shelf angles attached to the steel frame are structural steel under AISC 303 Section 2.1, so they are usually drawn and supplied with the frame.
How are shelf angles adjusted on site?
Slotted holes and shims let the erector set each run to the brick course line and the cavity width before the bolts are tightened or the welds made.
Why is there a gap under a shelf angle?
That soft joint lets the frame deflect and the brick expand without load passing into the veneer below. It is part of the masonry work.
Should shelf angles be galvanized?
They sit inside a wet cavity, so hot-dip galvanizing to ASTM A123 is common. We arrange it with an outside galvanizer, or paint as the specification says.
Can shelf angles reduce thermal bridging?
Yes, with stand-off details such as knife plates that hold the angle off the beam so insulation runs behind it, where the energy design calls for it.
Openings in the same brick wall? See steel lintels. Floors and edges: slab edge angles.
Built for large jobs
Shelf angles for your next large package
Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.
- 5,000 tSunpro Steel Factory
- 2,500 tCPV Food Processing Factory
- 2,000 tLong Son petrochemical complex
- 2,000 tM&D (MD Factory)
Request a quote
Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.
Become our partner in the US
You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.
Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.
Shop drawings, included