Route
Where Saint Lucian steel lands
Port Castries
Deep-water harbour in the capital, serving the north and the west coast.
Port Vieux Fort
Southern port beside Hewanorra International Airport, serving the south and east.
John Compton Highway
The north-south route along the east side, between Castries and Vieux Fort.
West Coast Road
Narrow, steep road from Castries through Anse la Raye to Soufrière.
Packing
Packed for steep roads
Erection order
Bundles follow the erection sequence, area by area.
Piece marks
Every member marked to the erection drawings before it ships to Castries.
Bundle lists
A packing list per bundle and a master list per shipment.
Short pieces
Bolted splices where hairpin bends limit the truck length.
Who does what
Shipping work, split clearly
World Steel supplies
- Packing in erection order with piece marks for Castries
- Packing lists and shipping documents
- Wood packaging treated for export to Saint Lucia where used
- Loading photos for every container
- Shipment tracking in PEB Studio
The contractor or importer arranges
- Import clearance and duties
- Port charges and haulage
- Route surveys for long loads
- Unloading, storage and cranes on site
- Erection
Saint Lucia
What we do not claim
Saint Lucia is supplied FOB Vietnam or CIF Castries only, and we do not publish prices or duty rates. A typical sailing from the Vietnamese port to Castries takes about 45 days; the route and costs are confirmed in each quotation.
Products and solutions
The World Steel pages behind this guide
Quarter by quarter
How this applies in your quarter
Saint Lucia has 9 quarters. Open Soufrière, Choiseul or Laborie to see the local wind, ground and coast, the road from Castries and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Saint Lucia project is cut, welded, inspected and packed.
Caribbean logistics
Ports for Saint Lucia: shipped from our plant in Vietnam
Shipping guides: Ocean routes from Vietnam · Transshipment hubs and feeders · Customs and import papers
Q&A
What Saint Lucian buyers ask
Which port should steel for my site use?
Usually the closer one: Port Castries for the north and west coast, Port Vieux Fort for the south and east. We confirm it for each shipment.
Can long members reach Soufrière?
The West Coast Road is steep and winding. We split long members at bolted splices so trucks can make the bends.
Who clears the steel through customs?
The importer of record in Saint Lucia, usually the contractor or owner, with a customs broker. We supply the commercial documents.
Official sources: Saint Lucia Air and Sea Ports Authority
Saint Lucia solutions
Every Saint Lucia guide
Related pages
Code facts on this page summarize practice in Saint Lucia and the standards it references. They are not legal or engineering advice; your engineer of record and the Development Control Authority confirm the code and edition in force for your project.
Contact World Steel · Saint Lucia
Talk to us about steel for Saint Lucia
WhatsApp, email or a video call with our engineers, booked at an hour that suits Castries. Our contact page for Saint Lucia has the ports, the local time and the form.