Routes
Where Jamaican steel lands
Kingston
Container terminal on Kingston Harbour, for the capital, Spanish Town, May Pen and most of the island.
Montego Bay
Freeport for St. James, Hanover, Trelawny and Westmoreland sites.
Bulk and breakbulk ports
Port Esquivel and Rocky Point handle bulk cargo; long members can be planned as breakbulk when containers will not do.
Road to site
Highway 2000 east-west, the North-South Highway to Ocho Rios, then parish roads.
Packing
Packed for the way your crew builds
Erection order
Bundles follow the erection sequence, area by area, so the first steel off the truck is the first steel up.
Piece marks
Every member carries its mark, matched to the erection drawings.
Bundle lists
A packing list for every bundle and a master list for the shipment.
Containers or breakbulk
Most steel ships in containers; very long members are planned for breakbulk.
Who does what
Shipping work, split clearly
World Steel supplies
- Packing in erection order with piece marks for Kingston
- Packing lists and shipping documents
- Wood packaging treated for export to Jamaica where used
- Loading photos for every container
- Shipment tracking in PEB Studio
The contractor or importer arranges
- Import clearance and duties in Jamaica
- Port charges and haulage to site
- Unloading and storage on site
- Cranes and erection
- Any local permits for oversized loads
Jamaica
What we do not claim
Jamaica is supplied FOB Vietnam or CIF Kingston only, and we do not publish prices or duty rates. A typical sailing from the Vietnamese port to Kingston takes about 45 days; the route and costs are confirmed in each quotation.
Products and solutions
The World Steel pages behind this guide
Jamaica parish by parish
How this applies in your parish
Jamaica has 14 parishes. Open Westmoreland, St. Elizabeth or Kingston to see the local wind, ground and coast, the road from Kingston and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Jamaican project is cut, welded, inspected and packed.
Caribbean logistics
Ports for Jamaica: shipped from our plant in Vietnam
Shipping guides: Ocean routes from Vietnam · Transshipment hubs and feeders · Customs and import papers
Q&A
What Jamaican buyers ask
Which port is best for my Jamaican site?
Kingston for most of the island; Montego Bay for western sites. We plan the shipment to the port nearest your site with your logistics team.
Who clears the steel through Jamaican customs?
The importer of record, usually the contractor or owner, with their customs broker. We supply the commercial documents.
Can long members fit in containers?
Most do. Very long girders or trusses are spliced in the design or shipped as breakbulk.
Official sources: Port Authority of Jamaica
Jamaica solutions
Every Jamaica guide
Related pages
Code facts on this page summarize Jamaican practice and the standards it references. They are not legal or engineering advice; your engineer of record and the municipal corporation confirm the code and edition in force for your project.
Contact World Steel · Jamaica
Talk to us about steel for Jamaica
WhatsApp, email or a video call with our engineers, booked at an hour that suits Kingston. Our contact page for Jamaica has the ports, the local time and the form.