Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Sint Maarten · Port

Structural steel shipped to Pointe Blanche, Sint Maarten

Cargo for Sint Maarten comes in at Port St. Maarten on the Pointe Blanche peninsula, east of Philipsburg, beside the cruise piers. From there, roads climb over the hills to Cul de Sac, Cole Bay and Simpson Bay, and traffic is heavy at peak hours. We pack for a busy island and narrow roads, so loads reach site with the next area to erect.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Pointe Blanche.

Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.
Port
Pointe Blanche
Roads
Hilly and busy
Also
Cruise piers beside cargo
Tracking
Live in PEB Studio

Route

Where Sint Maarten steel lands

Port St. Maarten, Pointe Blanche

The cargo and cruise port east of Philipsburg.

Philipsburg

The capital, a short haul from the port.

Over the hills

Roads to Cul de Sac and Cole Bay.

Simpson Bay and the Lowlands

The airport, the lagoon and the west-end hotels.

Packing

Packed for hill roads

Erection order

Bundles follow the erection sequence, building by building.

Piece marks

Every member marked to the erection drawings before it ships to Pointe Blanche.

Bundle lists

A packing list per bundle and a master list per shipment.

Lengths for the route

Members sized for hill roads, with bolted splices where needed.

Who does what

Shipping work, split clearly

World Steel supplies

  • Packing in erection order with piece marks for Pointe Blanche
  • Packing lists and shipping documents
  • Wood packaging treated to ISPM 15 where used
  • Loading photos for every container
  • Shipment tracking in PEB Studio

The contractor or importer arranges

  • Import clearance and duties
  • Port charges and haulage
  • Unloading and storage
  • Cranes on site
  • Erection

Sint Maarten

What we do not claim

Sint Maarten is supplied FOB Vietnam or CIF Pointe Blanche only, and we do not publish prices or duty rates. A typical sailing from the Vietnamese port to Pointe Blanche takes about 45 days; the route and costs are confirmed in each quotation.

Products and solutions

The World Steel pages behind this guide

Area by area

How this applies in your area

Sint Maarten has 5 areas. Open Cul de Sac, Philipsburg or Dutch Quarter and the east to see the local wind, ground and coast, the road from Pointe Blanche and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Sint Maarten project is cut, welded, inspected and packed.

Black-coated members bundled on a loading rack
Black-coated bundles staged on the loading rack, World Steel, Vietnam.
Gray members stacked and strapped together on a packing rack
Gray members strapped into a bundle on the packing rack, World Steel, Vietnam.
Packing hall with steel bundles, timber dunnage and loading racks
Timber dunnage and bundles in the packing hall at the Vietnam plant.
Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Caribbean logistics

Ports for Sint Maarten: shipped from our plant in Vietnam

Shipping guides: Ocean routes from Vietnam · Transshipment hubs and feeders · Customs and import papers

All Caribbean ports and routes

Q&A

What St. Maartener buyers ask

Which port does steel for Sint Maarten use?

Port St. Maarten at Pointe Blanche, east of Philipsburg.

Can long members reach Simpson Bay?

Often yes. We check lengths for the hill roads and add bolted splices where a road is tight.

Who clears the steel through customs?

The importer of record in Sint Maarten, usually the contractor or owner, with a customs broker. We supply the commercial documents.

Contact World Steel · Sint Maarten

Talk to us about steel for Sint Maarten

WhatsApp, email or a video call with our engineers, booked at an hour that suits Philipsburg. Our contact page for Sint Maarten has the ports, the local time and the form.