Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

La Altagracia · Province

Steel buildings and structural steel for La Altagracia, Dominican Republic

La Altagracia is the country’s tourism engine, with Punta Cana, Bávaro, Cap Cana and Uvero Alto, one of the busiest airports in the Caribbean at Punta Cana, and Higüey with its basilica. Fiona struck here in 2022.

Santo Domingo and the east · Provincial capital Salvaleón de Higüey

Site conditions in La Altagracia

What the site asks of your steel

Wind
Eastern hurricane exposure
Surge
Beachfront resorts
Air
Salt spray
Ground
Limestone and sand

Our design note. La Altagracia builds resorts, airport buildings and the warehouses that serve them, at scale. Wind and surge design, marine coatings and building-by-building deliveries shape the steel.

La Altagracia at a glance

The ground, the work and the road in

Ground and climate

Limestone plain and beaches.

What gets built

Tourism, the airport, construction, commerce and farming.

Getting steel there

By highway from Caucedo, about two hours east.

Towns: Higüey · Punta Cana · Bávaro · Cap Cana · Uvero Alto

Steel we recommend

What we fabricate for La Altagracia

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Hotels and resorts

Hotel blocks, resort buildings, restaurants and long-span lobbies.

Multi-story steel buildings →

Hangars and terminals

Long-span frames for hangars, cargo sheds and terminal buildings.

Aircraft hangar buildings →

Warehouses and logistics

Clear-span warehouses and distribution centres near the ports and highways.

Warehouse and distribution buildings →

Contractors in La Altagracia

You win the job in La Altagracia. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in La Altagracia

Can you supply a whole resort in Punta Cana?

Yes. Hotel blocks, lobbies, theatres and back-of-house buildings, each shipped as its own kit.

Which port serves Punta Cana?

Usually Caucedo, with the highway east. We confirm the route with your team.

Santo Domingo and the east

Other provinces: santo domingo and the east

The capital, Santo Domingo province with Caucedo and Las Américas, and the east from San Pedro de Macorís to Punta Cana.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in the Dominican Republic. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Dominican Republic

Talk to us about steel for La Altagracia

Send the drawings or the site, size and use. We design or detail the steel for La Altagracia’s earthquake, hurricane and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Caucedo. WhatsApp, email or a video call with our engineers, booked at an hour that suits Santo Domingo. Our contact page for the Dominican Republic has the ports, the local time and the form.