Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Anguilla · Port

Structural steel shipped to Road Bay, Anguilla

Cargo for Anguilla comes in at Road Bay, the port at Sandy Ground on the north-west coast. Blowing Point on the south coast is the ferry port for St Martin. From Road Bay no site is far: the roads run the length of a flat island about 26 km long. We pack for a small port and tight sites, so loads reach site with the next area to erect.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Road Bay.

Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.
Port
Road Bay, Sandy Ground
Island hauls
Short and flat
Ferry port
Blowing Point
Tracking
Live in PEB Studio

Route

Where Anguilla steel lands

Road Bay

The cargo port at Sandy Ground on the north-west coast.

West End roads

Short hauls to the resort beaches of the west.

The Valley

The capital, the airport and the centre of the island.

East End roads

The longest haul, to Island Harbour and the eastern tip.

Packing

Packed for a small port

Erection order

Bundles follow the erection sequence, building by building.

Piece marks

Every member marked to the erection drawings before it ships to Road Bay.

Bundle lists

A packing list per bundle and a master list per shipment.

Timed releases

Shipments released to match resort sites with little laydown space.

Who does what

Shipping work, split clearly

World Steel supplies

  • Packing in erection order with piece marks for Road Bay
  • Packing lists and shipping documents
  • Wood packaging treated for export to Anguilla where used
  • Loading photos for every container
  • Shipment tracking in PEB Studio

The contractor or importer arranges

  • Import clearance and duties
  • Port charges and haulage
  • Unloading and storage
  • Cranes on site
  • Erection

Anguilla

What we do not claim

Anguilla is supplied FOB Vietnam or CIF Road Bay only, and we do not publish prices or duty rates. A typical sailing from the Vietnamese port to Road Bay takes about 45 days; the route and costs are confirmed in each quotation.

Products and solutions

The World Steel pages behind this guide

District by district

How this applies in your district

Anguilla has 14 districts. Open Island Harbour, East End or West End to see the local wind, ground and coast, the road from Road Bay and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Anguilla project is cut, welded, inspected and packed.

Black-coated members bundled on a loading rack
Black-coated bundles staged on the loading rack, World Steel, Vietnam.
Gray members stacked and strapped together on a packing rack
Gray members strapped into a bundle on the packing rack, World Steel, Vietnam.
Packing hall with steel bundles, timber dunnage and loading racks
Timber dunnage and bundles in the packing hall at the Vietnam plant.
Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Caribbean logistics

Ports for Anguilla: shipped from our plant in Vietnam

Shipping guides: Ocean routes from Vietnam · Transshipment hubs and feeders · Customs and import papers

All Caribbean ports and routes

Q&A

What Anguillian buyers ask

Which port does steel for Anguilla use?

Road Bay at Sandy Ground, the island’s cargo port.

Can long members reach the east end?

Yes. The island is flat and the roads are short; we confirm member lengths for the route to your site.

Who clears the steel through customs?

The importer of record in Anguilla, usually the contractor or owner, with a customs broker. We supply the commercial documents.

Contact World Steel · Anguilla

Talk to us about steel for Anguilla

WhatsApp, email or a video call with our engineers, booked at an hour that suits The Valley. Our contact page for Anguilla has the ports, the local time and the form.