Route
Where Aruba steel lands
Port of Barcadera
The cargo port on the south coast between Oranjestad and Savaneta.
To the hotel coast
Short hauls north-west to Palm Beach and Noord.
Oranjestad
The capital, the airport and the offices.
To San Nicolas
South-east along the coast to the eastern tip.
Packing
Packed for a busy island
Erection order
Bundles follow the erection sequence, building by building.
Piece marks
Every member marked to the erection drawings before it ships to Barcadera.
Bundle lists
A packing list per bundle and a master list per shipment.
Timed releases
Shipments released to match hotel sites with little laydown space.
Who does what
Shipping work, split clearly
World Steel supplies
- Packing in erection order with piece marks for Barcadera
- Packing lists and shipping documents
- Wood packaging treated to ISPM 15 where used
- Loading photos for every container
- Shipment tracking in PEB Studio
The contractor or importer arranges
- Import clearance and duties
- Port charges and haulage
- Unloading and storage
- Cranes on site
- Erection
Aruba
What we do not claim
Aruba is supplied FOB Vietnam or CIF Barcadera only, and we do not publish prices or duty rates. A typical sailing from the Vietnamese port to Barcadera takes about 45 days; the route and costs are confirmed in each quotation.
Products and solutions
The World Steel pages behind this guide
Region by region
How this applies in your region
Aruba has 8 regions. Open Santa Cruz, Savaneta or San Nicolas Noord to see the local wind, ground and coast, the road from Barcadera and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Aruba project is cut, welded, inspected and packed.
Caribbean logistics
Ports for Aruba: shipped from our plant in Vietnam
Shipping guides: Ocean routes from Vietnam · Transshipment hubs and feeders · Customs and import papers
Q&A
What Aruban buyers ask
Which port does steel for Aruba use?
The port of Barcadera on the south coast, Aruba’s cargo port.
Can long members reach the hotel coast?
Yes. The roads are good and the hauls short; we confirm member lengths for the route to your site.
Who clears the steel through customs?
The importer of record in Aruba, usually the contractor or owner, with a customs broker. We supply the commercial documents.
Aruba solutions
Every Aruba guide
Related pages
Code facts on this page summarize practice in Aruba and the standards it references. They are not legal or engineering advice; your engineer of record and DIP confirm the code and edition in force for your project.
Contact World Steel · Aruba
Talk to us about steel for Aruba
WhatsApp, email or a video call with our engineers, booked at an hour that suits Oranjestad. Our contact page for Aruba has the ports, the local time and the form.