Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

US Virgin Islands · Ports

Structural steel shipped to St Thomas and St Croix

Cargo for St Thomas comes in at Crown Bay, west of Charlotte Amalie. St Croix has its own container port on the south shore, near the industrial area and the airport. Steel for St John crosses Pillsbury Sound by barge from Red Hook to the cargo landing at Enighed Pond in Cruz Bay. Roads on St Thomas and St John are steep and narrow, so we size members and bundles for the route to your site.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to St Thomas.

Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.
St Thomas
Crown Bay
St Croix
South shore port
St John
Barge to Cruz Bay
Tracking
Live in PEB Studio

Route

Where Virgin Islands steel lands

Crown Bay, St Thomas

The cargo terminal west of Charlotte Amalie, for St Thomas sites.

South shore, St Croix

The container port near the industrial area, for St Croix sites.

Red Hook to Cruz Bay

Barge across Pillsbury Sound to Enighed Pond, St John.

Hill roads

Steep, narrow roads; member lengths checked for each route.

Packing

Packed for steep island roads

Erection order

Bundles follow the erection sequence, building by building.

Piece marks

Every member marked to the erection drawings before it ships to St Thomas.

Bundle lists

A packing list per bundle and a master list per shipment.

Lengths for the route

Members sized for hill roads and barges, with bolted splices where needed.

Who does what

Shipping work, split clearly

World Steel supplies

  • Packing in erection order with piece marks for St Thomas
  • Packing lists and shipping documents
  • Wood packaging treated to ISPM 15 where used
  • Loading photos for every container
  • Shipment tracking in PEB Studio

The contractor or importer arranges

  • Import clearance and duties
  • Port charges, barges and haulage
  • Unloading and storage
  • Cranes on site
  • Erection

US Virgin Islands

What we do not claim

The US Virgin Islands is supplied FOB Vietnam or CIF St Thomas only, and we do not publish prices or duty rates. A typical sailing from the Vietnamese port to St Thomas takes about 45 days; the route and costs are confirmed in each quotation.

Products and solutions

The World Steel pages behind this guide

Island by island

How this applies in your island

The US Virgin Islands have 3 islands. Open St Thomas, St John or St Croix to see the local wind, ground and coast, the road from St Thomas and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your USVI project is cut, welded, inspected and packed.

Black-coated members bundled on a loading rack
Black-coated bundles staged on the loading rack, World Steel, Vietnam.
Gray members stacked and strapped together on a packing rack
Gray members strapped into a bundle on the packing rack, World Steel, Vietnam.
Packing hall with steel bundles, timber dunnage and loading racks
Timber dunnage and bundles in the packing hall at the Vietnam plant.
Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Caribbean logistics

Ports for the US Virgin Islands: shipped from our plant in Vietnam

Shipping guides: Ocean routes from Vietnam · Transshipment hubs and feeders · Customs and import papers

All Caribbean ports and routes

Q&A

What Virgin Islander buyers ask

Which ports does steel for the Virgin Islands use?

Crown Bay on St Thomas and the south shore container port on St Croix. St John is reached by barge from St Thomas.

Can long members reach hillside sites on St Thomas?

Often yes. We check lengths for the route and add bolted splices where a road is tight.

Who clears the steel on arrival?

The importer of record in the US Virgin Islands, usually the contractor or owner, with a customs broker. We supply the commercial documents.

Contact World Steel · US Virgin Islands

Talk to us about steel for the US Virgin Islands

WhatsApp, email or a video call with our engineers, booked at an hour that suits Charlotte Amalie. Our contact page for the US Virgin Islands has the ports, the local time and the form.