Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Trinidad and Tobago · Ports

Structural steel shipped to Port of Spain, Point Lisas and Scarborough

Trinidad has two main cargo gateways: the Port of Port of Spain in the north-west, and the Port of Point Lisas at Couva on the Gulf of Paria, beside the country’s largest industrial estate. Tobago is served from Scarborough. We ship to the port closest to your site and pack for the road from there.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Port of Spain or Point Lisas.

Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.
North
Port of Spain
Central and south
Point Lisas
Tobago
Scarborough
Packing
Erection order

Routes

Where Trinbagonian steel lands

Port of Spain

Container port for the capital, the East-West Corridor and the north.

Point Lisas

Container and breakbulk port beside the Point Lisas Industrial Estate, for central and southern sites.

Scarborough

Port for Tobago, reached by the inter-island cargo service from Trinidad.

Road to site

Churchill-Roosevelt and Uriah Butler highways, the Solomon Hochoy Highway to the south.

Packing

Packed for the way your crew builds

Erection order

Bundles follow the erection sequence, area by area.

Piece marks

Every member marked to the erection drawings before it ships to Port of Spain.

Bundle lists

A packing list per bundle and a master list per shipment.

Containers or breakbulk

Containers for most steel; breakbulk at Point Lisas for long or heavy pieces.

Who does what

Shipping work, split clearly

World Steel supplies

  • Packing in erection order with piece marks for Port of Spain
  • Packing lists and shipping documents
  • Wood packaging treated for export to Trinidad and Tobago where used
  • Loading photos for every container
  • Shipment tracking in PEB Studio

The contractor or importer arranges

  • Import clearance and duties
  • Port charges and haulage
  • Inter-island cargo to Tobago
  • Unloading and storage on site
  • Cranes and erection

Trinidad and Tobago

What we do not claim

Trinidad and Tobago is supplied FOB Vietnam or CIF Port of Spain only, and we do not publish prices or duty rates. A typical sailing from the Vietnamese port to Port of Spain takes about 45 days; the route and costs are confirmed in each quotation.

Products and solutions

The World Steel pages behind this guide

Municipality by municipality

How this applies in your municipality

Trinidad and Tobago has 15 municipalities. Open Siparia, Point Fortin or Tobago to see the local wind, ground and coast, the road from Port of Spain and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Trinidad and Tobago project is cut, welded, inspected and packed.

Black-coated members bundled on a loading rack
Black-coated bundles staged on the loading rack, World Steel, Vietnam.
Blue-coated frames waiting under the shop crane to be packed
Blue frames waiting their turn in the packing area, Vietnam plant.
Packing hall with steel bundles, timber dunnage and loading racks
Timber dunnage and bundles in the packing hall at the Vietnam plant.
Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Caribbean logistics

Ports for Trinidad and Tobago: shipped from our plant in Vietnam

Shipping guides: Ocean routes from Vietnam · Transshipment hubs and feeders · Customs and import papers

All Caribbean ports and routes

Q&A

What Trinbagonian buyers ask

Should my steel go to Port of Spain or Point Lisas?

Port of Spain for the north and the East-West Corridor; Point Lisas for central and southern sites and industrial estates. We plan it with your logistics team.

How does steel reach Tobago?

Usually by sea to Trinidad, then the inter-island cargo service to Scarborough. We size bundles for that transfer.

Who clears the steel through customs?

The importer of record in Trinidad and Tobago, usually the contractor or owner, with a customs broker. We supply the commercial documents.

Official sources: Port of Port of Spain · Point Lisas Industrial Port Development Corporation

Contact World Steel · Trinidad and Tobago

Talk to us about steel for Trinidad and Tobago

WhatsApp, email or a video call with our engineers, booked at an hour that suits Port of Spain. Our contact page for Trinidad and Tobago has the ports, the local time and the form.